FOLIUM BY SUMADHURA PHASE-II
By SUMADHURA INFRACON PRIVATE LIMITED
RG-KA-24257 · RERA PRM/KA/RERA/1251/446/PR/250423/005893 · Last updated on RERA Karnataka portal: 20 Apr 2023
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
FOLIUM BY SUMADHURA PHASE-II is a Residential/Group Housing project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/250423/005893 on 25 Apr 2023. Possession is promised by 31 Dec 2025. 1 complaint is on record with the regulator.
At a glance
Project
- NameFOLIUM BY SUMADHURA PHASE-II
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560066
- Pincode560066
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/250423/005893
- ReraGenie IDRG-KA-24257
Builder
- NameSUMADHURA INFRACON PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2012PTC062071
- GSTIN29AAQCS9641A1ZZ
- Authorized SignatoryBHARAT KUMAR KANDUKURI
- Chairman and Managing DirectorG MADHUSUDHAN
- DirectorsRAHUL KANDUKURI, G MADHUSUDHAN, G SWAPNA, G NAVEEN KUMAR, KALAKUNTLA VENKATA RAMA RAO, BHARAT KUMAR KANDUKURI
- Project HeadRAMA RAO MALARAJ
- Other registrations20 more →
- Declared earlier projects16 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on25 Apr 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed138 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing - C (IVY) | - | - | - | 200 | 0 | 200 |
| Wing - D (TULIP) | - | - | - | 200 | 0 | 200 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 20 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 20 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership7
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| H A KAVITHA | - | - |
| H A NARENDRA KUMAR | - | - |
| H A SRINIVAS | - | - |
| H A SOMASHEKAR | - | - |
| NAVED M HASSAN | - | - |
| H A SATHISH KUMAR | - | - |
| Sumadhura Infracon Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 217.10 cr | - |
| On-site expenditure-Consultants Fees | Rs 43.60 cr | - |
| Payment of taxes | Rs 25.55 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 13.00 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | V Narasimhan |
| Engineer | B E Pruthviraj |
| Chartered Accountant | CH PRANAY KUMAR |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00652/2026 | - | SUMADHURA INFRACON PRIVATE LIMITED | 04/06/2026 |
Documents filed138
As listed on the registration, under the names the promoter filed them with; the newest 80 of 138 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/250423/005893 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| SCHEDULES TO BALANCE SHEETS 2019-20File: SIPL Audited Financials FY 19-20 (1).pdf | 20 Apr 2023 |
| SCHEDULES TO BALANCE SHEETS 2020-21File: SIPL Audited Financials FY 20-21.pdf | 20 Apr 2023 |
| SCHEDULES TO BALANCE SHEETS 2021-22File: SIPL Audited Financials FY 21-22.pdf | 20 Apr 2023 |
| FOLIUM LAND CLARIFICATIONSFile: FY 2021-22 Folium Land Clarification.pdf | 20 Apr 2023 |
| Sale Deed 48-1CFile: Sale Deed-(SIPL) 48-1C.pdf | 13 Apr 2023 |
| Conversion Order 48-1CFile: Conversion Order 48-1C.pdf | 13 Apr 2023 |
| Katha 48-1C SIPLFile: Katha 48-1C SIPL.pdf | 13 Apr 2023 |
| Title Deed 48-1C (03Acre-05Guntas)File: Title Deed 48-1C (03Acre-05Guntas).pdf | 13 Apr 2023 |
| Sale Deed Doc.No. 4010-2010-11File: Sale Deed 4010-2010-11.pdf | 13 Apr 2023 |
| Sale Deed 4012-2010-11File: Sale Deed 4012-2010-11.pdf | 13 Apr 2023 |
| EC for Sy No 48-1c 01042004 to 13042023File: EC 01042004 to 13042023.pdf | 13 Apr 2023 |
| RTC 48-1C 2022-23File: RTC 48-1C 2022-23.pdf | 13 Apr 2023 |
| Mutation RegiterFile: M R No 23-2003-04.pdf | 13 Apr 2023 |
| Property Tax 2022-23File: Property Tax 2022-23.pdf | 13 Apr 2023 |
| Revenue DocumentsFile: Rev Doc 48-1c.pdf | 13 Apr 2023 |
| CLU OrderFile: CLU 48-1C.pdf | 13 Apr 2023 |
| Form 1 CA Certificate in newFile: Form 1 CA Certificate in new.pdf | 8 Apr 2023 |
| 47-1=Sale deed'sFile: 47-1=Sale deed's.pdf | 8 Apr 2023 |
| 47-2A=Sale Deed'sFile: 47-2A=Sale Deed's.pdf | 8 Apr 2023 |
| 47-2B=Sale DeedFile: 47-2B=Sale Deed.pdf | 8 Apr 2023 |
| 47-3=Sale Deed'sFile: 47-3=Sale Deed's.pdf | 8 Apr 2023 |
| 48-1C=Sale DeedFile: 48-1C=Sale Deed.pdf | 8 Apr 2023 |
| 48-3=Sale Deed'sFile: 48-3=Sale Deed's.pdf | 8 Apr 2023 |
| 48-4 =Sale Deed'sFile: 48-4 =Sale Deed's.pdf | 8 Apr 2023 |
| Emcumbrance CertificateFile: Emcumbrance Certificate.pdf | 8 Apr 2023 |
| RTC All Sy No's Issued by Reve deptFile: RTC All Sy No's.pdf | 8 Apr 2023 |
| AREA Detail ClarificationFile: AREA Detail Clarification.pdf | 8 Apr 2023 |
| BHK Detail ClarificationFile: BHK Detail Clarification.pdf | 8 Apr 2023 |
| Building HeightFile: Building Height.pdf | 8 Apr 2023 |
| AREA BUA in WING C & D MarkedFile: AREA BUA in WING C & D Marked.png | 8 Apr 2023 |
| Single Plot LayoutFile: Single Plot Layout.pdf | 8 Apr 2023 |
| Single Layout OrderFile: Single Layout Order.pdf | 8 Apr 2023 |
| Certified carpet areaFile: Certified carpet area.pdf | 8 Apr 2023 |
| Site Location Demarked in CDPFile: Site Location Demarked in CDP.pdf | 8 Apr 2023 |
| Site Location Demarked in Village MapFile: Site Location Demarked in Village Map.pdf | 8 Apr 2023 |
| Relinquishment Deed-(Others)File: Relinquishment Deed-(Others).PDF | 8 Apr 2023 |
| Additional FAR ClarificationFile: Additional FAR Clarification.pdf | 8 Apr 2023 |
| E BrochuraFile: E-Brochure.pdf | 8 Apr 2023 |
| Commencement CertificateFile: Commencement Certificate.pdf | 8 Apr 2023 |
| DP Work OrderFile: DP Work Order.pdf | 8 Apr 2023 |
| Development Plan ModifiedFile: Development Plan Modified.pdf | 8 Apr 2023 |
| BHK Detail ClarificationFile: BHK Detail Clarification.pdf | 8 Apr 2023 |
| AREA Detail ClarificationFile: AREA Detail Clarification.pdf | 8 Apr 2023 |
| Proforma of Ageement of SaleFile: Proforma of Ageement of Sale.pdf | 8 Apr 2023 |
| Proforma of Allotment LetterFile: Proforma of Allotment Letter.pdf | 8 Apr 2023 |
| Affadavit Form B DeclarationFile: Affadavit Form B Declaration.pdf | 8 Apr 2023 |
| Affidavit Section for 3(1) VoliationFile: Affidavit Section for 3(1) Voliation.pdf | 8 Apr 2023 |
| STP Design Drawing as per Kspcb GuidelinesFile: STP Design Drawing as per Kspcb Guidelines.jpg | 8 Apr 2023 |
| BWSSB Fee ReceiptFile: BWSSB Fee Receipt.pdf | 8 Apr 2023 |
| Bescom Noc FEE Receipt-File: Bescom Noc FEE Receipt-.jpg | 8 Apr 2023 |
| Estimated Cost eengineer certificateFile: Estimated Cost eengineer certificate.pdf | 8 Apr 2023 |
| Registration CertificateFile: Incorporation Certificate.pdf | - |
| Organization StructureFile: Organaisation Chart.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA Certificate in new format.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidavit non litigation.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA Certificate in new.pdf | - |
| Balance Sheet 2021 - 2022File: SIPL Balance Sheet FY 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: SIPL Audit Report FY 2021-22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Profit & Loss.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Profit & Loss.pdf | - |
| Director's Report 2021 - 2022File: SIPL Directors report for Financial Year 2021-22.pdf | - |
| Director's Report 2020 - 2021File: Directors Report.pdf | - |
| Director's Report 2019 - 2020File: Directors Report.pdf | - |
| Cash Flow Statement 2021 - 2022File: SIPL Cash Flow Statement FY 2021-22.pdf | - |
| Cash Flow Statement 2020 - 2021File: Cashflow Statement.pdf | - |
| Auditor's Report 2021 - 2022File: SIPL Audit Report FY 2021-22.pdf | - |
| Auditor's Report 2020 - 2021File: Audit Report.pdf | - |
| Auditor's Report 2019 - 2020File: Audit Report.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: SIPL IT Ack FY 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: IT Acknowledgement.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: IT Ack.pdf | - |
| Commencement Certficate | - |
| NOC BESCOM | - |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| FOLIUM BY SUMADHURA PHASE-I | BBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East Taluk | Ongoing | Jun 2025 | Not delivered |
| SUMADHURA SUSHANTHAM PHASE-II | BBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North Taluk | Ongoing | Dec 2024 | Not delivered |
| SUMADHURA SUSHANTHAM PHASE-I | BBMP Katha No 1582 Sy No 3/9 3/10 Thindlu Village Yelahanka Hobli Bangalore North Taluk | Completed | - | No date filed |
| SUMADHURA NANDANAM | BBMP Katha No 1087 Sy No 10/2 Hoodi Village KR Puram hobli, Bangalore East Taluk | Completed | - | No date filed |
| SUMADHURA EDEN GARDEN | Sy No 8/2 8/3 8/5 9/1 9/2 9/3 10 113/2 Doddabanahalli Village Bidarahalli Hobli Bangalore East Bangalore | Completed | - | No date filed |
| ASPIRE AURUM | VP Katha No 191, Sy No 114/1,114/2,114/3 Doddabanahalli Village Bidarahalli Hobli Bangalore East Taluk | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep FOLIUM BY SUMADHURA PHASE-II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 45 registered projects within 2 km.
SBR ONE RESIDENCE
SBR STRUCTURES
Cloud Forest
Shreno Limited
MAHINDRA BLOSSOM
MAHINDRA LIFESPACE DEVELOPERS LIMITED
SUMADHURA SOLACE PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
FOLIUM BY SUMADHURA PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA EDITION PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if FOLIUM BY SUMADHURA PHASE-II is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of FOLIUM BY SUMADHURA PHASE-II?
The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in FOLIUM BY SUMADHURA PHASE-II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against FOLIUM BY SUMADHURA PHASE-II?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at FOLIUM BY SUMADHURA PHASE-II?
The professionals named in the filing: Architect: V Narasimhan; Engineer: B E Pruthviraj; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FOLIUM BY SUMADHURA PHASE-II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.