Home / Browse projects / Bengaluru Urban, Karnataka / FALCON BY BHP
FALCON BY BHP
By BHP HOUSING
RG-KA-93996 · RERA PRM/KA/RERA/1251/308/PR/160124/006546 · Last updated on RERA Karnataka portal: 19 Aug 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
FALCON BY BHP is a Residential/Group Housing project by BHP HOUSING in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/160124/006546 on 16 Jan 2024. Possession is promised by 31 Dec 2025. 197 of the 276 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.
At a glance
Project
- NameFALCON BY BHP
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 562125
- Pincode562125
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/160124/006546
- ReraGenie IDRG-KA-93996
Builder
- NameBHP HOUSING
- Entity typePartnership Firm
- GSTIN29AAZFB3819K1ZO
- Authorized SignatorySURINENI BHAVISHA
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on16 Jan 2024
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed119 files
Current status
Figures as on 19 Aug 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| FALCON BY BHP | - | - | - | 276 | 0 | 276 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 16 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 10% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAMPRASAD HOUSING | - | - |
| RAMPRASAD HOUSING | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 102.00 cr | Rs 102.00 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ramesha DB |
| Engineer | G. Praveen Kumar |
| Chartered Accountant | I V S RAJU |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed119
As listed on the registration, under the names the promoter filed them with; the newest 80 of 119 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/160124/006546 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: BHP_Form 4_Q3 FY 2025-26.pdf | 19 Aug 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Q3-25-26 Falcon form 5 (1).pdf | 19 Aug 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Q3-25-26 Falcon form 6 (1).pdf | 19 Aug 2026 |
| SOURCES OF FUNDSFile: letter (1).pdf | 8 Jan 2024 |
| IT RETURNSFile: Hari sir ITR 22-23_compressed (1).pdf | 8 Jan 2024 |
| IT RETURNSFile: Ramakrishna Naidu ITR 2022-23_Signed_compressed.pdf | 8 Jan 2024 |
| LOAN APPROVALSFile: Term Sheet_BHP HOUSING.pdf | 8 Jan 2024 |
| BUILDING LICENSEFile: falcon CC_merged.pdf | 8 Jan 2024 |
| CERTIFIED CARPER AREA CALCULATIONFile: FALCON BY BHP FALCON BY BHP (1).pdf | 8 Jan 2024 |
| ARCHITECTS LICENSEFile: ARCHITECT LISENCE.jpeg | 8 Jan 2024 |
| ARCHITECTS CERTIFICATEFile: rera registration Form 2 (1).pdf | 8 Jan 2024 |
| BALANCE SHEETFile: BALANCE SHEET.pdf | 1 Jan 2024 |
| TITLE DEEDFile: SALE DEED_0001.pdf | 1 Jan 2024 |
| PODI HISSAFile: PODI HISSA.pdf | 1 Jan 2024 |
| JDAFile: JDA.pdf | 1 Jan 2024 |
| ADVOCATE SEARCH REPORTFile: SEARCH REPORT_compressed.pdf | 1 Jan 2024 |
| CHANGE OF LAND USEFile: CLU.pdf | 1 Jan 2024 |
| BUILDING LICENSEFile: license.pdf | 1 Jan 2024 |
| CARPET AREA CALCULATIONSFile: FALCON AREA STATEMENT.xlsx | 1 Jan 2024 |
| ARCHITECT CERTIFICATEFile: AC 1.jpeg | 1 Jan 2024 |
| ENGINEER CERTIFICATEFile: engineer license.jpeg | 1 Jan 2024 |
| COST DETAILSFile: rera registration Form 3 (5).pdf | 1 Jan 2024 |
| SPECIFICATIONSFile: SPECIFICATIONS FALCON.pdf | 1 Jan 2024 |
| PROJECT DETAILSFile: project name and address.pdf | 1 Jan 2024 |
| ESTIMATION COSTFile: rera registration Form 3 (5).pdf | 1 Jan 2024 |
| BESCOMFile: bescom - Copy.pdf | 1 Jan 2024 |
| WATER NOCFile: water letter new.pdf | 1 Jan 2024 |
| STP DRAWINGFile: STP DRAWING.pdf | 1 Jan 2024 |
| GUIDANCE VALUEFile: guidance value.pdf | 1 Jan 2024 |
| SOURCE OF WATERFile: water letter new.pdf | 1 Jan 2024 |
| RTC, survey 56-1 | - |
| Mutation, survey 56-1 | - |
| Encumbrance Certificate, survey 56-1 | - |
| Conversion/Alienation Order, survey 56-1 | - |
| JDA, survey 56-1 | - |
| Khatha, survey 56-1 | - |
| RTC, survey 56-2 | - |
| Mutation, survey 56-2 | - |
| Encumbrance Certificate, survey 56-2 | - |
| Conversion/Alienation Order, survey 56-2 | - |
| JDA, survey 56-2 | - |
| Khatha, survey 56-2 | - |
| Registration CertificateFile: GST Certificate (2).pdf | - |
| Partnership DeedFile: PARTNERSHIP DEED (1).pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: NA FILE .jpg | - |
| Certificate issued by Architect Form 2File: rera registration Form 2 (2).pdf | - |
| Certificate issued by Engineer Form 3File: rera registration Form 3 (5).pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: non litigation affidavit.pdf | - |
| Certificate from Chartered AccountFile: rera registration form-1.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet 2022-23.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Balance Sheet 2022-23.pdf | - |
| Director's Report 2022 - 2023File: Balance Sheet 2022-23.pdf | - |
| Cash Flow Statement 2022 - 2023File: Acknowledgement PDF ITR5 - ACK426353800201023.pdf | - |
| Auditor's Report 2022 - 2023File: Acknowledgement PDF ITR5 - ACK426353800201023.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: INCOME TAX ACKN A Y 23 24.pdf | - |
| falcon CC | - |
| bescom | - |
| water letter new | - |
| SINGLE PLAN | - |
| TYPICAL FLOOR PLAN | - |
| SINGLE PLAN | - |
| SINGLE PLAN | - |
| TYPICAL FLOOR PLAN | - |
| specifications | - |
| SINGLE PLAN | - |
| SITE PLAN | - |
| Falcon | - |
| NA FILE | - |
| NA FILE | - |
| JDA | - |
| buruguntte 56 clu | - |
| NA FILE | - |
| CONVERSION | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep FALCON BY BHP on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 26 registered projects within 2 km.
Nambiar District 25 Phase 3
Nambiar EnsembleResidential Projects LLP
Meridian Park Phase II @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase I @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase III @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Nambiar District 25 Phase 2
Nambiar EnsembleResidential Projects LLP
SEVEN SARJAPUR
FORTUNE PRIMERO LLP
See every Bengaluru Urban project, with the district possession charts
Builder: BHP HOUSING
BHP HOUSING has 1 registration on RERA Karnataka, including FALCON BY BHP. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if FALCON BY BHP is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of FALCON BY BHP?
The registered promoter entity is BHP HOUSING, a partnership firm as per the filing. Its GSTIN 29AAZFB3819K1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in FALCON BY BHP?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at FALCON BY BHP?
The professionals named in the filing: Architect: Ramesha DB; Engineer: G. Praveen Kumar; Chartered Accountant: I V S RAJU. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FALCON BY BHP?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback