Eaton Park @ The Prestige City
By PRESTIGE PROJECTS PRIVATE LIMITED
RG-KA-65022 · RERA PRM/KA/RERA/1251/308/PR/180326/008537 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Eaton Park @ The Prestige City is a Residential/Group Housing project by PRESTIGE PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180326/008537 on 18 Mar 2026. Possession is promised by 30 Jun 2030. 247 of the 366 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameEaton Park @ The Prestige City
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 562125
- Pincode562125
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/180326/008537
- ReraGenie IDRG-KA-65022
Builder
- NamePRESTIGE PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU45201KA2008PTC046784
- GSTIN29AAECP7361E1Z9
- Authorized SignatorySwaroop Anish
- CmdZAYD NOAMAN
- DirectorsBadrunissa Irfan, Almas Rezwan, Sameera Noaman, ZAYD NOAMAN, NEELAM CHHIBER, S N NAGENDRA
- Project HeadSURESH S
- Other registrations11 more →
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Mar 2026
- Promised completion30 Jun 2030
- Revised completionNone
- Buildings4 building records
- Documents filed191 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 1 Tower 1 | - | - | - | 87 | 0 | 87 |
| Building 1 Tower 2 | - | - | - | 85 | 0 | 85 |
| Building 2 Tower 3 | - | - | - | 82 | 0 | 82 |
| Building 3 Tower 4 | - | - | - | 112 | 0 | 112 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 65%.
Building: 6% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 65% |
| Foundation footing work | 30% |
| Upto Plinth Level | 10% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 10% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 5% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 10% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 5% |
| Lifts | Yes | 5% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 5% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 10% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership11
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s.Prestige Projects Private Ltd., | - | - |
| M/s.Prestige Projects Private Ltd., | - | - |
| M/s.Orchids Developers | - | - |
| M/s.Prestige Projects Private Ltd., | - | - |
| M/s.Prestige Projects Private Ltd., | - | - |
| M/s.Prestige Projects Private Ltd., | - | - |
| M/s.Prestige Projects Pvt Ltd., | - | - |
| M/s.Prestige Projects Private Ltd., | - | - |
| M/s.Prestige Projects Private Ltd., | - | - |
| M/s.Prestige Projects Private Ltd., | - | - |
| M/s.Prestige Projects Pvt Ltd., | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 323.97 cr | Rs 34.56 cr |
| On-site expenditure-Site Overhead | Rs 81.40 cr | Rs 3.47 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 76.43 cr | - |
| Payment of taxes | Rs 47.90 cr | Rs 6.99 cr |
| On-site expenditure-Consultants Fees | Rs 7.01 cr | Rs 2.52 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. J. Mamtha |
| Engineer | Mr. Vinod Kumar R |
| Chartered Accountant | Vivek Harish Kini |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed191
As listed on the registration, under the names the promoter filed them with; the newest 80 of 191 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180326/008537 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q2 2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q2 2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q2 2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q1 2026-27 Eaton Park.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q1 2026-27 Eaton Park.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q1 2026-27 Eaton Park.pdf | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q 4 Eaton Park_compressed.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Q 4 Eaton Park.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q 4 Eaton Park.pdf | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Katha Declaratory AffidavitFile: Affidavit-Katha.pdf | 18 Mar 2026 |
| Village Map-Combined of 2 villagesFile: Village Map.pdf | 18 Mar 2026 |
| KSPCB-Payment made receipt and affidavitFile: Affidavit-KSPCB.pdf | 18 Mar 2026 |
| Affidavit-BESCOM and SIAAFile: BESCOM affidavit.pdf | 18 Mar 2026 |
| Draft AGS-Eaton Park @ the Prestige CityFile: Draft-AGS-Prestige EATON PARK-18032026.pdf | 18 Mar 2026 |
| Development PlanFile: Eaton Park DP_ Approved Drawing.pdf | 16 Mar 2026 |
| Development Plan Work OrderFile: DP WORK ORDER.pdf | 16 Mar 2026 |
| Building licenseFile: Eaton Park Building License.pdf | 16 Mar 2026 |
| ADLRFile: Prestige -Eaton Park_DP_ ADLR Sketch.pdf | 16 Mar 2026 |
| LocationFile: Eaton Park - Location.jpeg | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (1).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (2).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (4).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (3).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (5).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (6).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (7).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (8).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (9).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (10).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (11).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (12).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (13).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (14).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (16).pdf | 16 Mar 2026 |
| Approved floor plan, sectional drawings and elevationsFile: 1 (17).pdf | 16 Mar 2026 |
| CDPFile: CDP MAP-Model.pdf | 16 Mar 2026 |
| Village Map - SompuraFile: Sompura Village Map -Eaton Park.pdf | 16 Mar 2026 |
| Village Map - VK HalliFile: V K Halli Village Map -Eaton Park.pdf | 16 Mar 2026 |
| Pic1File: Pic1.jpeg | 16 Mar 2026 |
| Pic2File: Pic2.jpeg | 16 Mar 2026 |
| Pic3File: Pic3.jpeg | 16 Mar 2026 |
| Approved Site PlanFile: Eaton Park SIte Plan.pdf | 16 Mar 2026 |
| Structural Stability certificateFile: Structural stability certificate - Eaton Park.pdf | 16 Mar 2026 |
| Memorandum of AssociationFile: MOA - PPPL.pdf | 16 Mar 2026 |
| Article of AssociationFile: AOA - PPPL.pdf | 16 Mar 2026 |
| Annual Audit Report Form 7File: Form 7 2024-25 Aston Park.pdf | 16 Mar 2026 |
| Quarterly ReportFile: Quarterly Update Details - Aston Park.pdf | 16 Mar 2026 |
| Sources of FundsFile: Source of Fund.pdf | 16 Mar 2026 |
| CA Certificate Form 1 RevisedFile: Form 1 Eaton Park.pdf | 16 Mar 2026 |
| Engineer certificate Form 3 RevisedFile: Form 03-Eaton Park.pdf | 16 Mar 2026 |
| Estimate Cost DetailsFile: Cost Break up Details-Eaton Park.pdf | 16 Mar 2026 |
| Land Cost Calculation Sheet as per Guidance ValueFile: Land Guidance Value Details.pdf | 16 Mar 2026 |
| Borewell1File: Borewell 1.jpeg | 16 Mar 2026 |
| Borewell2File: Borewell 2.jpeg | 16 Mar 2026 |
| Structural Stability CertificateFile: DT_260412_161535.pdf | 16 Mar 2026 |
| License CopyFile: BEP KAR License 2021-2026- Signed Copy.pdf | 16 Mar 2026 |
| Project SpecificationsFile: Project Specs.pdf | 16 Mar 2026 |
| Allotment LetterFile: Allotment Letter RERA (2).pdf | 16 Mar 2026 |
| Common areas and Amenities SignedFile: Eaton Park - Signed Sheet.pdf | 16 Mar 2026 |
| STP drawingFile: 250811 EATON PARK - BWSSB SANCTION DWG-STP.pdf | 16 Mar 2026 |
| Eaton Park BESCOMFile: Eaton park - BESCOM fees.jpeg | 16 Mar 2026 |
| BESCOM NOC fees paidFile: EATON PARK BESCOM NOC-2.pdf | 16 Mar 2026 |
| SEIAA AcknowledgmentFile: Hardcopy Ack.PDF | 16 Mar 2026 |
| SEIAA paymentFile: Khajane II Payment.PDF | 16 Mar 2026 |
| EC 23/1File: 23-1 Merged.pdf | 16 Mar 2026 |
| EC 32/4File: 32-4 Merged.pdf | 16 Mar 2026 |
| EC 129/1File: 129-1 Merged.pdf | 16 Mar 2026 |
| EC 129/2File: 129-2 Merged.pdf | 16 Mar 2026 |
| EC 130/1File: 130-1 Merged.pdf | 16 Mar 2026 |
| EC 130/2File: 130-2 Merged.pdf | 16 Mar 2026 |
| EC 130/3File: 130-3 Merged.pdf | 16 Mar 2026 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Prestige Park Grove | SY NOS 13/2, 30/1 (P), 30/2, 32, 33/1, 33/2, 33/3, 34/1, 36(P), 38/2, 39/2, 40/1, 40/2, 40/3, 41/1, 41/2, 41/2, 41/3, 42, 43/1, 43/2, 43/3, 44/1A, 44/1B, 44/2, 44/3, 45/1, 45/2, 46/1A, 46/1B, 46/1C, 46/1D, 46/2, 47/1, 47/2, 47/3, 47/4, 48/1, 48/2, 48/3, 49,50/1 TO 5, 51, 52/1 TO 4 , 53/1, 53/1B, 53/2, 54, 59/1,70/2&3, 70/4, 70/5, 71/1, 71/2, , BENGALURU | Ongoing | Dec 2027 | Not due yet |
| ASTON PARK @ THE PRESTIGE CITY | Y. NO. 31/2, 32/1, 32/2, 32/3 AND 32/5 OF VK HALLI VILLAGE, SARJAPUR HOBLI ANEKUL TALUK BENGALURU, ANEKAL, BENGALURU URBAN, KARNATAKA - 562125 | Ongoing | Sep 2026 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Eaton Park @ The Prestige City on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 69 registered projects within 2 km.
Nambiar District 25 Phase 3
Nambiar EnsembleResidential Projects LLP
Meridian Park Phase II @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase I @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase III @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Nambiar District 25 Phase 2
Nambiar EnsembleResidential Projects LLP
SEVEN SARJAPUR
FORTUNE PRIMERO LLP
See every Bengaluru Urban project, with the district possession charts
Builder: PRESTIGE PROJECTS PRIVATE LIMITED
PRESTIGE PROJECTS PRIVATE LIMITED has 12 registrations on RERA Karnataka, including Aston Park @ The Prestige City and Garden Breeze @ The Prestige City. Its filings declare 6 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Eaton Park @ The Prestige City is delayed beyond 30 Jun 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Eaton Park @ The Prestige City?
The registered promoter entity is PRESTIGE PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45201KA2008PTC046784 and GSTIN 29AAECP7361E1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Eaton Park @ The Prestige City?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Eaton Park @ The Prestige City?
The professionals named in the filing: Architect: Ar. J. Mamtha; Engineer: Mr. Vinod Kumar R; Chartered Accountant: Vivek Harish Kini. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Eaton Park @ The Prestige City?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.