EAST FIELD
RG-KA-25055 · RERA PRM/KA/RERA/1250/304/PR/131224/007290 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
EAST FIELD is a Residential/Group Housing project by URBANEST REALTY in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/131224/007290 on 13 Dec 2024. Possession is promised by 31 Dec 2029. 54 of the 200 units on this registration are recorded sold or booked, and 4 of 16 construction stages are filed complete.
At a glance
Project
- NameEAST FIELD
- TypeResidential/Group Housing
- Location
- Hosakote
- Bengaluru Rural
- 562114
- Pincode562114
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1250/304/PR/131224/007290
- ReraGenie IDRG-KA-25055
Builder
- NameURBANEST REALTY
- Entity typePartnership Firm
- GSTIN29AAFFU7438K1ZI
- Authorized SignatoryMOHAN R
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on13 Dec 2024
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings2 building records
- Documents filed178 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EAST FIELD TOWER A | - | - | - | 100 | 0 | 100 |
| EAST FIELD TOWER B | - | - | - | 100 | 0 | 100 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 16 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 90%.
Building: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 90% |
| Masonry Construction | 60% |
| Plastering inside , outside & Ceiling | 16% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities36
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 35% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Staircases | Yes | 55% |
| Lifts | Yes | 55% |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 55% |
| Basement | Yes | 90% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SVASTAM ENTERPRISES | - | - |
| SVAST ENTERPRISES represented by its Partner Mrs. Vandita Batra | - | - |
| SVAST ENTERPRISES represented by its Partner Mrs. Vandita Batra | - | - |
| R GAJENDRA | - | - |
| SVAST ENTERPRISES represented by its Partner Mrs. Vandita Batra | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 60.33 cr | Rs 18.51 cr |
| Payment of taxes | Rs 16.52 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Raghavendra S |
| Engineer | Ambrish G |
| Chartered Accountant | SRIKARAN UTPALA |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed178
As listed on the registration, under the names the promoter filed them with; the newest 80 of 178 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/131224/007290 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA certification East field Q2 2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Q2 Eastfield Form 5- Architect Certificate -2026 -27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6- Engineer Cerificate Eastfield Q2 2026 -27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA certification East field Q1 2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Q1 Eastfield Form 5- Architect Certificate -2026 .pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: East Field Form 6- Engineered Cerificate Q1 2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: eastfield Form 4 Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Q4 Eastfield Form 5- Architect Certificate.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6- Engineer Cerificate Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA certification East field Q3 25-26.pdf | 7 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Q3 25-26- Eastfield Form 5- Architect Certificate.pdf | 7 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6- Engineered Cerificate Q3 25-26.pdf | 7 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 7 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 7 Feb 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 7 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 7 Feb 2026 |
| Q3 2025-26 Fire and Safety | 7 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 7 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 7 Feb 2026 |
| Sale Agreement ProformaFile: sale agreement Proforma.pdf | 2 Dec 2024 |
| Engineer License AttestedFile: Engineer License Attested.pdf | 2 Dec 2024 |
| Basement PlanFile: Basement Plan_compressed.pdf | 2 Dec 2024 |
| Ground Floor PlanFile: Ground Floor Plan_compressed.pdf | 2 Dec 2024 |
| Section and Elevation PlanFile: Section and Elevation_compressed.pdf | 2 Dec 2024 |
| Typical Floor PlanFile: Typical Floor Plan_compressed.pdf | 2 Dec 2024 |
| Current Year RTC Sy No 21/12File: RTC Sy No 21-12.pdf | 2 Dec 2024 |
| EC From 2004 to 2021 with respect to Sy No 21/2 and 21/12File: EC from 2004 to 2021 Sy No 21-2 and 21-12.pdf | 2 Dec 2024 |
| EC From 2020 to till date with respect to Sy No 21/2 and 21/12File: EC from 2020 to till date Sy No 21-2 and 21-12.pdf | 2 Dec 2024 |
| Current Year RTC Sy No 21/2File: RTC Sy No 21-2.pdf | 2 Dec 2024 |
| E-KhathaFile: E-Khatha.pdf | 2 Dec 2024 |
| Sources of FundFile: SOURCES OF FUND.pdf | 25 Nov 2024 |
| Financials 2023-24 with CA UDINFile: Urbanest realty FY2023-24.pdf | 25 Nov 2024 |
| E-KhathaFile: E-Khatha.pdf | 25 Nov 2024 |
| Old Sale Deed Sy No 21/12File: Old Sale Deed Sy No 21-12.pdf | 25 Nov 2024 |
| Old Sale Deed Sy No 21/2File: Sy No 21-2 - Sale Deed 7514_2021-22.pdf | 25 Nov 2024 |
| Development PlanFile: Development Plan.pdf | 25 Nov 2024 |
| DP Approval OrderFile: DP Approval Order.pdf | 25 Nov 2024 |
| Building LicenseFile: Building License.pdf | 25 Nov 2024 |
| Commencement CertificateFile: Commencement Certificate.pdf | 25 Nov 2024 |
| SEIAA NOCFile: SEIAA NOC.pdf | 25 Nov 2024 |
| ADLR Survey SketchFile: ADLR Survey self attested.pdf | 25 Nov 2024 |
| ZR copyFile: Zonal Regulations copy - Hoskote.pdf | 25 Nov 2024 |
| Master PlanFile: Master Plan_compressed.pdf | 25 Nov 2024 |
| AAI NOCFile: AAI.pdf | 25 Nov 2024 |
| Fire NOCFile: Fire NOC.pdf | 25 Nov 2024 |
| HAL NOCFile: HAL NOC.pdf | 25 Nov 2024 |
| BSNL NOCFile: BSNL Noc.pdf | 25 Nov 2024 |
| STP DrawingsFile: STP Drawings self Attested.pdf | 25 Nov 2024 |
| Sale Agreement ProformaFile: sale agreement Draft.pdf | 25 Nov 2024 |
| Allotment LetterFile: Allotment letter.pdf | 25 Nov 2024 |
| Cost BreakupFile: East Field - Cost Breakup.pdf | 25 Nov 2024 |
| Land CostFile: Land Cost.pdf | 25 Nov 2024 |
| SpecificationsFile: SPECIFICATIONS.pdf | 25 Nov 2024 |
| RTC, survey 21/2 | - |
| Mutation, survey 21/2 | - |
| Encumbrance Certificate, survey 21/2 | - |
| Conversion/Alienation Order, survey 21/2 | - |
| JDA, survey 21/2 | - |
| Khatha, survey 21/2 | - |
| RTC, survey 21/12 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.
Keep EAST FIELD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural650+ in Bengaluru Rural
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
Provident Botanico
Provident Housing Limited
GODREJ PARKSHIRE
Godrej Properties Limited
Sowparnika The Native
SOWPARNIKA HOMES PRIVATE LIMITED
SOWPARNIKA EUPHORIA IN THE EAST
SOWPARNIKA HOMES PRIVATE LIMITED
Brillio and Commercial at Brigade Valencia
Brigade Enterprises Ltd
Sowparnika Whispering Petals
SOWPARNIKA GREEN MEADOWS PRIVATE LIMITED
See every Bengaluru Rural project, with the district possession charts
Builder: URBANEST REALTY
URBANEST REALTY has 3 registrations on RERA Karnataka, including EAST FIELD and URBANEST ELITE 35. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if EAST FIELD is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of EAST FIELD?
The registered promoter entity is URBANEST REALTY, a partnership firm as per the filing. Its GSTIN 29AAFFU7438K1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in EAST FIELD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at EAST FIELD?
The professionals named in the filing: Architect: Raghavendra S; Engineer: Ambrish G; Chartered Accountant: SRIKARAN UTPALA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EAST FIELD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.