Home / Browse projects / Bengaluru Urban, Karnataka / DSR THE COURTYARD
DSR THE COURTYARD
RG-KA-36356 · RERA PRM/KA/RERA/1251/446/PR/280324/006759 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
DSR THE COURTYARD is a Residential/Group Housing project by DSR INFRAPROJECTS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/280324/006759 on 28 Mar 2024. Possession is promised by 22 Feb 2027. 132 of the 227 units on this registration are recorded sold or booked, and 14 of 17 construction stages are filed complete.
At a glance
Project
- NameDSR THE COURTYARD
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560087
- Pincode560087
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/280324/006759
- ReraGenie IDRG-KA-36356
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on28 Mar 2024
- Promised completion22 Feb 2027
- Revised completionNone
- Buildings3 building records
- Documents filed171 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 113 | 0 | 113 |
| Tower 2 | - | - | - | 114 | 0 | 114 |
| Club House | - | - | - | 0 | 2 | 2 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 17 construction stages are filed complete. The stage furthest along is Railing and Grill fixing, at 99%.
Building: 99% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 98% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 99% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 90% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 90% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 95% |
| Community Hall | Yes | 95% |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | Yes | 95% |
| Swimming Pool | Yes | 95% |
| Gym | Yes | 95% |
| Parks | Yes | 95% |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | 100% |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | Yes | 100% |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| K S SATYANARAYANA REDDY | - | - |
| DSR INFRA PROJECTS | - | - |
| K S SATYANARAYANA REDDY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 109.95 cr | Rs 134.65 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GENESIS PLANNERS PVT LTD REP BY GNANAVEL T |
| Engineer | ZAKI ASSOCIATES REP BY ZAKI AHMED |
| Chartered Accountant | MUKKERA RAVI TEJA REDDY |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed171
As listed on the registration, under the names the promoter filed them with; the newest 80 of 171 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/280324/006759 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA CERTIFICATEEE-DSR THE COURTYARD FORM 4 Q2.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: DSR -COURTYARD- FORM-5 RERA CER-Q2-01_10.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 Q2 2026-27 THE COURTYARD.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: DSR THE COURTYARD CERTIFICATE JUNE 26.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (QU) Q1COURTYARD.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 COURTYARD RERA Q1 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA CER COURTYARD Q4 MAR 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: ARC CERTIFICATE DSR CY.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE Q4 31-3-2026.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: DSR COURTYARD CA CERTIFICATE F (1).pdf | 5 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: TCY ARCHITECT CER Q3.pdf | 5 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: DSR THE COURTYARD ENGG PROGRESS REPORT 31-12-2025.pdf | 5 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 5 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 5 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 5 Feb 2026 |
| Q3 2025-26 Fire and Safety | 5 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 5 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 5 Feb 2026 |
| Proof of funds - SBI LOAN APPLICATIONFile: Proof of funds - SBI LOAN APPLICATION.pdf | 20 Mar 2024 |
| BANK AFFIDAVITFile: BANK AFFIDAVIT.pdf | 20 Mar 2024 |
| MR No1 2011 12 CP SharmaFile: MR No1 2011 12 CP Sharma.pdf | 20 Mar 2024 |
| latest katha extract issued by BBMP in favour of Satyanarayana reddy as per sale deed for sites inFile: Khatha Certificate & Extract.pdf | 20 Mar 2024 |
| latest katha extract issued by BBMP in favour of DSR INFRA PROJECTS for 319/1File: Khatha Certificate & Extract.pdf | 20 Mar 2024 |
| sno 319/1 & 319/2 land originally seems to be granted govt land,File: Grant order.pdf | 20 Mar 2024 |
| EC from 1-4-2008 to 22-12-2012 for sno 70File: EC from 1-4-2008 to 22-12-2012 for sno 70.pdf | 20 Mar 2024 |
| EC for sno 319/1 from 1-4-2008 to 31-3-2019File: 0104 2008 to 31 03 2019 319 1.pdf | 20 Mar 2024 |
| EC for sno 319/2 from 1-4-2008 to 27-10-2022File: 0104 2008 to 27 10 2022 319 2.pdf | 20 Mar 2024 |
| JDA for sno 319/2 to the full extent of 1-00A instead of 0-26 G between landowner and developerFile: Ownership for SyNo319-2.pdf | 20 Mar 2024 |
| unit areas certified by engineerFile: unit areas certified by engineer.pdf | 20 Mar 2024 |
| CDP DSR COURT YARDFile: CDP DSR COURT YARD.pdf | 20 Mar 2024 |
| Village Map DSR COURTYARDFile: Village Map DSR COURTYARD.pdf | 20 Mar 2024 |
| Regarding RelinquishmentFile: Relinquishnent.pdf | 20 Mar 2024 |
| Clarification for Commencement Certificate -The CourtyardFile: Clarification for Commencement Certificate -The Courtyard.pdf | 20 Mar 2024 |
| Regarding Number of units in KSPCB CFEFile: Regarding Number of units in KSPCB CFE.pdf | 20 Mar 2024 |
| Regarding Number of units in SEIAA NOCFile: Regarding Number of units in SEIAA NOC.pdf | 20 Mar 2024 |
| Single Plot Layout & Order ExplainationFile: Single Plot Layout & Order Explaination.pdf | 20 Mar 2024 |
| BBMP SANCTION PLAN Court YardFile: BBMP SANCTION PLAN Court Yard.pdf | 20 Mar 2024 |
| ENGINEER LICENCE AND CERTIFICATE self attestedFile: ENGINEER LICENCE AND CERTIFICATE.pdf | 20 Mar 2024 |
| Form 6File: Form 6.pdf | 20 Mar 2024 |
| STP PLAN AND SECTION DETAILS dwg for RERA PURPOSES LayoutFile: STP PLAN AND SECTION DETAILS dwg for RERA PURPOSES Layout.pdf | 20 Mar 2024 |
| AIRPORTS AUTHORITY OF INDIA-NOC -attestedFile: AIRPORTS AUTHORITY OF INDIA-NOC.pdf | 20 Mar 2024 |
| BANGALORE ELECTRICITY SUPPLY -attestedFile: BANGALORE ELECTRICITY SUPPLY.pdf | 20 Mar 2024 |
| BANGALORE WATER SUPPLY & SEWERAGE BOARD -NOC -attestedFile: BANGALORE WATER SUPPLY & SEWERAGE BOARD -NOC.pdf | 20 Mar 2024 |
| BHARAT SANCHAR-NOC -attestedFile: BHARAT SANCHAR-NOC.pdf | 20 Mar 2024 |
| CONSENT FOR ESTABLISHMENT (CFE) - attestedFile: CONSENT FOR ESTABLISHMENT (CFE).pdf | 20 Mar 2024 |
| fire noc - attestedFile: DIRECTOR GENERAL OF POLICE-NOC.pdf | 20 Mar 2024 |
| ENVIRONMENTAL CLEARANCE - attestedFile: ENVIRONMENTAL CLEARANCE.pdf | 20 Mar 2024 |
| HAL-NOC- attestedFile: HAL-NOC.pdf | 20 Mar 2024 |
| The courtyard Guideline Value Certificate - self attestedFile: The courtyard Guideline Value Certificate.pdf | 20 Mar 2024 |
| Clarification for water supply - DSR THE COURTYARDFile: Clarification for water supply - DSR THE COURTYARD.pdf | 20 Mar 2024 |
| Detailed cost of construction certified by engineerFile: Detailed cost of construction certified by engineer.pdf | 20 Mar 2024 |
| SPECIFICATIONS CERTIFIED BY ENGINEER DSR THE COURTYARDFile: SPECIFICATIONS CERTIFIED BY ENGINEER DSR THE COURTYARD.pdf | 20 Mar 2024 |
| Affidavit sec 3File: Affidavit sec 3 new.pdf | 20 Mar 2024 |
| RTC, survey 70 | - |
| Mutation, survey 70 | - |
| Encumbrance Certificate, survey 70 | - |
| Conversion/Alienation Order, survey 70 | - |
| Sale/Title/Gift Deed, survey 70 | - |
| JDA, survey 70 | - |
| Khatha, survey 70 | - |
| RTC, survey 319/1 | - |
| Mutation, survey 319/1 | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| DSR WHITEWATERS II | DSR WHITEWATERS II BBMP KHATHA NO 638 GUNJUR VILLAGE VARTHUR HOBLI | Completed | - | No date filed |
| DSR WATERSCAPE | DSR WATERSCAPE BBMP KHATHA NO 10 K CHANNASANDRA VILLAGE BENGALURU | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep DSR THE COURTYARD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 79 registered projects within 2 km.
Prestige Lavender Fields
Prestige Office Ventures
Brigade Sanctuary
Brigade Enterprises Ltd
MYHNA VISTARA
MYHNA PROPERTIES PRIVATE LIMITED
ABHEE AARIA
ABHEE VENTURES PRIVATE LIMITED
ABHEE CITY URBAN GLENN PHASE II
ABHEE VENTURES PRIVATE LIMITED
GODREJ PARK RETREAT
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: DSR INFRAPROJECTS
DSR INFRAPROJECTS has 3 registrations on RERA Karnataka, including DSR THE ADDRESS and DSR GREEN WATERS. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if DSR THE COURTYARD is delayed beyond 22 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of DSR THE COURTYARD?
The registered promoter entity is DSR INFRAPROJECTS, a partnership firm as per the filing. Its GSTIN 29AAPFD6671B1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in DSR THE COURTYARD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at DSR THE COURTYARD?
The professionals named in the filing: Architect: GENESIS PLANNERS PVT LTD REP BY GNANAVEL T; Engineer: ZAKI ASSOCIATES REP BY ZAKI AHMED; Chartered Accountant: MUKKERA RAVI TEJA REDDY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DSR THE COURTYARD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback