Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 47 documents Report an error

Construction of1836 Houses at Gopishetty koppa an is a Residential/Group Housing project by Rajiv Gandhi Housing corporation ltd in Shivamogga, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1271/486/PR/060225/007488 on 6 Feb 2025. Possession is promised by 30 Dec 2028.

At a glance

Project

  • NameConstruction of1836 Houses at Gopishetty koppa an
  • TypeResidential/Group Housing
  • Location
    • Shivamogga
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1271/486/PR/060225/007488
  • ReraGenie IDRG-KA-33846

Builder

  • NameRajiv Gandhi Housing corporation ltd
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryCommissioner
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Feb 2025
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---183601836

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities30

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
CC--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 127.88 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 124.68 cr-
On-site expenditure-Consultants FeesRs 1.76 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.20 cr-
On-site expenditure-Salaries of workersRs 24.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectImprints
EngineerImprints
Chartered AccountantAccount suprintendent

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed47

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1271/486/PR/060225/007488 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 176 177 178 179-
Mutation, survey 176 177 178 179-
Encumbrance Certificate, survey 176 177 178 179-
Khatha, survey 176 177 178 179-
Registration CertificateFile: GST TIN.pdf-
GST CertificateFile: GST TIN.pdf-
Certificate issued by CA Form 1File: Charted account ltr.pdf-
Certificate issued by Architect Form 2File: Legal ltr.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Legal ltr.pdf-
Balance Sheet 2023 - 2024File: balance sheet.pdf-
Balance Sheet 2022 - 2023File: balance sheet.pdf-
Balance Sheet 2021 - 2022File: balance sheet.pdf-
Audited Profit and Loss Statement 2023 - 2024File: balance sheet.pdf-
Audited Profit and Loss Statement 2022 - 2023File: auditors report.pdf-
Audited Profit and Loss Statement 2021 - 2022File: auditors report.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: income tax.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: income tax.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: income tax.pdf-
Layout approval-
Town planning approvsl-
Section drawing-
Structural plan-
drawing detailed-
Layout approval-
Layout approval-
Layout approval-
Legal ltr-
Town planning approvsl-
income tax-
jd affidavit-
Advocate ltr-
Ltr LPA-
Ltr LPA-
Ltr LPA-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Shivamogga

14%of Shivamogga projects moved their completion datethis one has not
0%of Shivamogga registrations are shown as withdrawn or revokedthis one is not

Computed across the 140+ Shivamogga projects on ReraGenie, from their own filings.

Keep Construction of1836 Houses at Gopishetty kop on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Shivamogga140+ in Shivamogga

Builder: Rajiv Gandhi Housing corporation ltd

Rajiv Gandhi Housing Corporation Ltd has 2 registrations on RERA Karnataka, including 1 Lakh Multi Storey Bengaluru Housing Programme and Construction of1836 Houses at Gopishetty koppa an. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Shivamogga district page.

Frequently asked questions

What are my rights if Construction of1836 Houses at Gopishetty koppa an is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Construction of1836 Houses at Gopishetty koppa an?

The registered promoter entity is Rajiv Gandhi Housing corporation ltd, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Construction of1836 Houses at Gopishetty koppa an?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Construction of1836 Houses at Gopishetty koppa an?

The professionals named in the filing: Architect: Imprints; Engineer: Imprints; Chartered Accountant: Account suprintendent. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of1836 Houses at Gopishetty koppa an?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of1836 Houses at Gopishetty koppa an. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of1836 Houses at Gopishetty kop to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.