Registration approved No litigation declared Residential/Group Housing project

SIRI

By M R GROUPS

RG-KA-34315 · RERA PRM/KA/RERA/1271/486/PR/110325/007573

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Jump to the 40 documents Report an error

SIRI is a Residential/Group Housing project by M R GROUPS in Shivamogga, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1271/486/PR/110325/007573 on 11 Mar 2025. Possession is promised by 31 Mar 2029.

At a glance

Project

  • NameSIRI
  • TypeResidential/Group Housing
  • Location
    • Shivamogga
    • 577201
  • Pincode577201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1271/486/PR/110325/007573
  • ReraGenie IDRG-KA-34315

Builder

  • NameM R GROUPS
  • Entity typeProprietorship
  • GSTIN29ANVPM3733G2ZG
  • Authorized SignatoryMADHU MUDDENAHALLI RANGEGOWDA

Key dates

this monthRegisteredMar 2025PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Mar 2025
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings5 building records
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A---42042
TOWER B---36036
TOWER C---36036
TOWER D---24024
TOWER E---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Electricity supply transformer and substationYes-
Internal Roads & FootpathsNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,941 sq m
Named landowners1
LandownerVillageDistrict
K B JAYANNA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 48.55 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 48.55 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVENKATESH R
EngineerYEDAMALE RACHAN
Chartered AccountantH N SRINIVASA RAO

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1271/486/PR/110325/007573 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 2-
Mutation, survey 2-
Encumbrance Certificate, survey 2-
Conversion/Alienation Order, survey 2-
Sale/Title/Gift Deed, survey 2-
JDA, survey 2-
Khatha, survey 2-
Registration CertificateFile: MSME Reg Certificate.pdf-
Certificate issued by CA Form 1File: CA FORM 1 - REGISTRATION - M R GROUPS signed copy.pdf-
Certificate issued by Architect Form 2File: ARCH FORM 2 - REGISTRATION - M R GROUPS signed copy.pdf-
Certificate issued by Engineer Form 3File: ENGR FORM 3 - REGISTRATION - M R GROUPS signed copy.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: AFFIDAVIT NON LITIGATION.pdf-
Certificate from Chartered AccountFile: CA FORM 1 - REGISTRATION - M R GROUPS signed copy.pdf-
Balance Sheet 2022 - 2023File: ITR BS PL 22-23.pdf-
Balance Sheet 2021 - 2022File: ITR BS PL 21-22.pdf-
Balance Sheet 2020 - 2021File: ITR BS PL 20-21.pdf-
Audited Profit and Loss Statement 2022 - 2023File: ITR BS PL 22-23.pdf-
Audited Profit and Loss Statement 2021 - 2022File: ITR BS PL 21-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: ITR BS PL 20-21.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR BS PL 22-23.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR BS PL 21-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR BS PL 20-21.pdf-
BUILDING LICENSE-
ELECTRICAL NOC-
WATER BOARD NOC-
ALL PLANS-
FLOOR PLANS-
ALL PLANS-
FLOOR PLANS-
SINGLE SITE ORDER & PLAN-
Project Specifications SIRI-
SINGLE SITE ORDER & PLAN-
CDP MAP MASTER PLAN DEMARCATED-
STP REPORT & DRAWINGS-
LAND DOCS-
JDA GPA-
OLD PARTITION DEED-

How this compares with Shivamogga

14%of Shivamogga projects moved their completion datethis one has not
0%of Shivamogga registrations are shown as withdrawn or revokedthis one is not

Computed across the 140+ Shivamogga projects on ReraGenie, from their own filings.

Keep SIRI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Shivamogga140+ in Shivamogga

2 kmSIRIOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: M R GROUPS

M R GROUPS has 1 registration on RERA Karnataka, including SIRI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Shivamogga district page.

Frequently asked questions

What are my rights if SIRI is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SIRI?

The registered promoter entity is M R GROUPS, a proprietorship as per the filing. Its GSTIN 29ANVPM3733G2ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SIRI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SIRI?

The professionals named in the filing: Architect: VENKATESH R; Engineer: YEDAMALE RACHAN; Chartered Accountant: H N SRINIVASA RAO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIRI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIRI. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIRI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.