Home / Browse projects / Gandhinagar, Gujarat / Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar

Valid until 30 Dec 2022 Mixed Development project

Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar

By GUJARAT RURAL HOUSING BOARD GNR

RG-GJ-15782 · RERA PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA04398/EX2/260422 · Last updated on GujRERA portal: 7 Jul 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • Nothing verified clear yet
Dec 2022Possession promisedmoved 24 months from the original
72 of 72Construction stages doneacross 9 buildings; every applicable stage filed complete
18 of 464Units unsoldnot recorded sold or booked
Jump to the 46 documents Report an error

Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar is a Mixed Development project by GUJARAT RURAL HOUSING BOARD GNR in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA04398/EX2/260422 on 17 Dec 2018. Possession is promised by 30 Dec 2022. The completion date has moved by 24 months from the original filing. 446 of the 464 units on this registration are recorded sold or booked, and 72 of 72 construction stages are filed complete.

At a glance

Project

  • NameConstruction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar
  • TypeMixed Development
  • Location
    • Behind Police Station Adaalaj
    • Taluka : Gadhinagar District : Gadhinagar
    • Adalaj
    • Gandhinagar
    • 382421
  • Pincode382421
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA04398/EX2/260422
  • ReraGenie IDRG-GJ-15782

Builder

  • NameGUJARAT RURAL HOUSING BOARD GNR
  • Entity typeCOMPETENT AUTHORITY/ GOVERNMENT
  • Other registrations1 more →
  • Past their filed date1

Key dates

this monthRegisteredDec 2018First promiseDec 2020Revised toDec 2022

Key facts

Registration and timeline

  • StatusValid until 30 Dec 2022
  • Registered on17 Dec 2018
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Dec 2020)
  • Buildings9 building records
  • Documents filed46 files

Current status

96%446 of 464 units booked
88.5%Of the estimated cost spent so far

Figures as on 7 Jul 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C---56056
D---56056
E---56056
F---56056
G---56056
H---56056
SHOPS---01616
A---56056
B---56056

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building9

As on 7 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 72 construction stages are filed complete across 9 buildings.

C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
E100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
F100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
H100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
SHOPS100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 7 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes100%
Energy managementYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,848 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 30.26 cr
Cost incurredRs 26.78 cr
Spent of the estimate88.53%
BuildingWingEstimatedIncurred
ANARs 3.36 crRs 2.98 cr
BNARs 3.36 crRs 2.98 cr
CNARs 3.36 crRs 2.98 cr
DNARs 3.36 crRs 2.98 cr
ENARs 3.36 crRs 2.98 cr
FNARs 3.36 crRs 2.98 cr
GNARs 3.36 crRs 2.98 cr
HNARs 3.36 crRs 2.98 cr
SHOPSNARs 3.36 crRs 2.98 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA04398/EX1/020621Applied Feb 2021; approved Jun 2021
PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA04398/EX2/260422Applied Apr 2022; approved Apr 2022

Documents filed46

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA04398/EX2/260422 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Jul 2022
Engineer's certificate (Form 2)7 Jul 2022
Engineer's certificate annexure7 Jul 2022
Accountant's certificate (Form 3)7 Jul 2022
Site photograph, C7 Jul 2022
Site photograph, D7 Jul 2022
Site photograph, E7 Jul 2022
Site photograph, F7 Jul 2022
Site photograph, G7 Jul 2022
Site photograph, H7 Jul 2022
Site photograph, SHOPS7 Jul 2022
Site photograph, A7 Jul 2022
Site photograph, B7 Jul 2022
RERA registration certificate17 Dec 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

96%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one moved by 24 months

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep Construction of 504 L.I.G Houses including S on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Adalaj1,600+ in Gandhinagar

2 kmConstruction of 504 L.I.Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: GUJARAT RURAL HOUSING BOARD GNR

GUJARAT RURAL HOUSING BOARD GNR has 2 registrations on GujRERA, including Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar and Construction of 30(J Block) L.I.G houses including infrastructure at adalaj ta gandhinagar. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar?

The registered promoter entity is GUJARAT RURAL HOUSING BOARD GNR, a competent authority/ government as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 504 L.I.G Houses including Shops and Infrastructure At: Adalaj Ta: Gandhinagar Dist: Gandhinagar. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 504 L.I.G Houses including S to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.