Home / Browse projects / Bengaluru Urban, Karnataka / Confident Central Mall
Confident Central Mall
By Confident Projects India Private Limited
RG-KA-14013 · RERA PRM/KA/RERA/1250/303/PR/101122/005445 · Last updated on RERA Karnataka portal: 12 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
Saved.
Confident Central Mall is a Commercial project by Confident Projects India Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/101122/005445 on 10 Nov 2022. Possession is promised by 30 Nov 2026. The completion date has moved by 12 months from the original filing. 97 of the 97 units on this registration are recorded sold or booked, and 9 of 18 construction stages are filed complete.
At a glance
Project
- NameConfident Central Mall
- TypeCommercial
- Location
- Anekal
- Bengaluru Urban
- 562125
- Pincode562125
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1250/303/PR/101122/005445
- ReraGenie IDRG-KA-14013
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on10 Nov 2022
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 30 Nov 2025)
- Buildings1 building record
- Documents filed153 files
Current status
Figures as on 12 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Confident Central Mall | - | - | - | 0 | 97 | 97 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 12 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 18 construction stages are filed complete. The stage furthest along is Dadoing, at 97%.
Building: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 92% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 90% |
| Basic work of Water supply, Sanitary and Electrification | 95% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 97% |
| Railing and Grill fixing | 86% |
| Electrification, Water supply and Sanitary Finishing | 88% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 71% |
| Internal and External work including landscapes as per sanctioned drawings | 25% |
Progress on shared amenities40
As on 12 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 88% |
| Sewage and Drainage System | Yes | 89% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 75% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 70% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 67% |
| Electricity supply transformer and substation | Yes | 60% |
| Storm water drains | Yes | 80% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 89% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 88% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 70% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 95% |
| Lifts | Yes | 70% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 80% |
| Basement | Yes | 92% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| CONFIDENT PROJECTS INDIA PRIVATE LIMITED | - | - |
| CONFIDENT PROJECTS INDIA PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 31.07 cr | Rs 27.34 cr |
| On-site expenditure-Salaries of workers | Rs 3.00 cr | Rs 3.00 cr |
| On-site expenditure-Site Overhead | Rs 1.89 cr | Rs 1.89 cr |
| Payment of fees | Rs 34.96 lakh | Rs 34.96 lakh |
| On-site expenditure-Consultants Fees | Rs 18.71 lakh | Rs 18.71 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 15.99 lakh | Rs 15.99 lakh |
| Payment of taxes | Rs 2.50 lakh | Rs 2.50 lakh |
| Payment of charges | Rs 1.48 lakh | Rs 1.48 lakh |
| Payment of cess | Rs 73,384 | Rs 73,384 |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Uma Nirmala |
| Engineer | Uma Nirmala |
| Chartered Accountant | Shubham |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed153
As listed on the registration, under the names the promoter filed them with; the newest 80 of 153 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/101122/005445 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Central form 4.pdf | 12 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Architect certificate Centre Form 5.pdf | 12 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineers certificate Central Form 6.pdf | 12 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 12 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate for Central_compressed.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect Certificate Form 5 Central Mall 03-07-2026.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer certificate Form 6 Central Mall 03-07-2026.pdf | 10 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 10 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Rera Central Form 4 Certificate for q4.PDF | 20 May 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Form 5 Central.pdf | 20 May 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer Form 6 Central.pdf | 20 May 2026 |
| Q4 2025-26 Water supply and sewage board | 20 May 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Confident Central_Q3.PDF | 23 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect’s Certificate of Central Form-5.pdf | 23 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate of central Form-6.pdf | 23 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 23 Feb 2026 |
| Ex1File: Form Ex 1 Architect Certificate.pdf | 21 Jan 2026 |
| Ex2File: Form 2 Archit Certificate For pending work as on .pdf | 21 Jan 2026 |
| Ex6File: Form-Ex6 Engineering Certificate of Central .pdf | 21 Jan 2026 |
| Ex5File: Form-Ex5 Engineering Certificate of Central .pdf | 21 Jan 2026 |
| Certificate engineerFile: Gunasheel Engineer Certificate .pdf | 21 Jan 2026 |
| Architecture certificationFile: Uma Nirmala Seal and Signature.pdf | 21 Jan 2026 |
| Extention letter with reasonFile: Central Mall Extention (2).PDF | 14 Jan 2026 |
| Engininer certificateFile: Engneering Certificate Ex5 (1).pdf | 14 Jan 2026 |
| Architure certificateFile: Form Ex 1 Architect Certificate.pdf | 14 Jan 2026 |
| Engininer certificateFile: Form 6 Engineering Certificate For pending work a.pdf | 14 Jan 2026 |
| Architure certificateFile: Form 2 Archit Certificate For pending work as on .pdf | 14 Jan 2026 |
| Engineer licence noFile: Uma Nirmala Seal and Signature_compressed.pdf | 14 Jan 2026 |
| Sold and unsold detaild with signatureFile: Sold Unit Details Confident Central Mall 12-1-2026_compressed.pdf | 14 Jan 2026 |
| Latest ECFile: Latest EC Central mall.pdf | 14 Jan 2026 |
| Financial Statement 2020-21File: 2020-21_compressed (2).pdf | 28 Oct 2022 |
| Financial Statement 2019-20File: Confident Projects Financials 2019 - 2020_compressed (2).pdf | 28 Oct 2022 |
| Financial Statement 2018-19File: Confident financials 2018-19-NEW (1).pdf | 28 Oct 2022 |
| Partition deedFile: Partition deed Pemulaiah central mall_compressed.pdf | 28 Oct 2022 |
| Title deed for sy 141-1File: Title deed of dj Projects sy 141 -1 (1).pdf | 28 Oct 2022 |
| Sale deed 141File: SALE DEED-141.pdf | 28 Oct 2022 |
| Bescom AffidavitFile: Affidavit for Bescom NOC (1).pdf | 28 Oct 2022 |
| NOC bescom LetterFile: NOC letter for Bescom.pdf | 28 Oct 2022 |
| Financial statmentFile: 3CA and CD Confident Projects Audit Report.pdf | 30 Sep 2022 |
| BSFile: Balancesheet confident 2020.pdf | 30 Sep 2022 |
| BSFile: Balancesheet confident 20-21.pdf | 30 Sep 2022 |
| BSFile: Balancesheet 2019 confident.pdf | 30 Sep 2022 |
| PLFile: Profit and loss 2021 .pdf | 30 Sep 2022 |
| PLFile: p&L 2020 Confident.pdf | 30 Sep 2022 |
| PLFile: P&L 2019 confident.pdf | 30 Sep 2022 |
| CFFile: Cash flow statement 2019 confident.pdf | 30 Sep 2022 |
| CFFile: Cash flow statement 2020 confident (1).pdf | 30 Sep 2022 |
| CFFile: Cashflow 2021-compressed.pdf | 30 Sep 2022 |
| ITRFile: ITR Receipt 2020-21 Confident (1).pdf | 30 Sep 2022 |
| ITRFile: ITR Acknowledgement 2020 (1).pdf | 30 Sep 2022 |
| Audit BSFile: 3CA and CD Confident Projects Audit Report.pdf | 30 Sep 2022 |
| Directors reportFile: Confident Directors report 2021.pdf | 30 Sep 2022 |
| AuditFile: Audit report confident 20-21.pdf | 30 Sep 2022 |
| AuditFile: Audit report independent 2021 confident (1).pdf | 30 Sep 2022 |
| Financial statmentFile: 2020-21_compressed.pdf | 30 Sep 2022 |
| Tilte deedFile: Central mall title deed part 2.pdf | 30 Sep 2022 |
| Title deedFile: Central mall TITLE DEED deed for SY No141 2 17guntas (2)_compressed.pdf | 30 Sep 2022 |
| BESCOM NOC NAFile: Rera NOc.pdf | 30 Sep 2022 |
| Bank chequeFile: Central mall Bank cheque.pdf | 10 Sep 2022 |
| CA certificateFile: Central mall CA certificate registeration new.pdf | 10 Sep 2022 |
| Balance sheet 2021File: Balancesheet confident 2021.pdf | 10 Sep 2022 |
| Balance sheet2020File: Balancesheet confident 2020.pdf | 10 Sep 2022 |
| Balance sheet2019File: Balancesheet 2019 confident.pdf | 10 Sep 2022 |
| ITRFile: Confident ITR 2021 (1).pdf | 10 Sep 2022 |
| P rofit and LossFile: Profit and loss 2021 _compressed (1).pdf | 10 Sep 2022 |
| Directors reportFile: Directors report 2021 confident_compressed_compressed (1).pdf | 10 Sep 2022 |
| Audit ReportFile: Confident Audit report 2021 (1).pdf | 10 Sep 2022 |
| ECFile: EC central mall complete.pdf | 10 Sep 2022 |
| Non litigation affidavitFile: Central Affidavit No litigation (1).pdf | 10 Sep 2022 |
| Title deed to converstion SD No 131 75/06-07File: Central sale deed 141-2 Compressed new.pdf | 10 Sep 2022 |
| SD No 131 75/06-07File: Central mall MR 141-2 (1).pdf | 10 Sep 2022 |
| Title deedFile: Central sale deed 141-2 Compressed new.pdf | 10 Sep 2022 |
| hissa podiFile: yamare.pdf | 10 Sep 2022 |
| Sale deed andFile: FinalSigned_ANK-CC-A-1470017-2022-23.pdf | 10 Sep 2022 |
| Performa of Sale agreementFile: SA Central.pdf | 10 Sep 2022 |
| Single plot layoutFile: Central Single plot layout.pdf | 10 Sep 2022 |
| Single orderFile: Central Single plot order.pdf | 10 Sep 2022 |
| Akarband and sketchFile: Akarband and survey sketch central (1)_compressed.pdf | 10 Sep 2022 |
| Guidance value subregistareFile: Guidance value certificate central mall (1)_compressed.pdf | 10 Sep 2022 |
| CDPFile: CDP Map central mall.jpg | 10 Sep 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| CONFIDENT OXYGEN | SY NO 85/2, 83/3 CHAMBENAHALLI VILLAGE, SARJAPURA HOBLI, ANEKAL TALUK , BANGALORE | Ongoing | Nov 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Confident Central Mall on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 67 registered projects within 2 km.
Nambiar District 25 Phase 3
Nambiar EnsembleResidential Projects LLP
Meridian Park Phase II @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase I @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase III @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Nambiar District 25 Phase 2
Nambiar EnsembleResidential Projects LLP
SEVEN SARJAPUR
FORTUNE PRIMERO LLP
See every Bengaluru Urban project, with the district possession charts
Builder: Confident Projects India Private Limited
Confident Projects India Private Limited has 9 registrations on RERA Karnataka, including Confident Central Mall and Confident Astro Phase II. Its filings declare 6 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Confident Central Mall is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Confident Central Mall?
The registered promoter entity is Confident Projects India Private Limited, a company as per the filing. Its GSTIN 29AACCC7506L2ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Confident Central Mall?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Confident Central Mall?
The professionals named in the filing: Architect: Uma Nirmala; Engineer: Uma Nirmala; Chartered Accountant: Shubham. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Confident Central Mall?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.