Home / Browse projects / Belagavi, Karnataka / CITY COPORATION BELAGAVI 1484 AHP PROJECT

Registration approved No litigation declared Residential/Group Housing project

CITY COPORATION BELAGAVI 1484 AHP PROJECT

By City Corporation Belagavi

RG-KA-18850 · RERA PRM/KA/RERA/1249/447/PR/161123/006413 · Last updated on RERA Karnataka portal: 10 Nov 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 77 documents Report an error

CITY COPORATION BELAGAVI 1484 AHP PROJECT is a Residential/Group Housing project by City Corporation Belagavi in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/161123/006413 on 16 Nov 2023. Possession is promised by 29 Oct 2024.

At a glance

Project

  • NameCITY COPORATION BELAGAVI 1484 AHP PROJECT
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/161123/006413
  • ReraGenie IDRG-KA-18850

Builder

  • NameCity Corporation Belagavi
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryRGHCL

Key dates

this monthRegisteredNov 2023PromisedOct 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Nov 2023
  • Promised completion29 Oct 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---101

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 10 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 10 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Commissioner Of City Corporation Belagavi--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHUBHA DESHMUKH
EngineerG H Basavaraj
Chartered AccountantManju Gowda KV

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed77

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/161123/006413 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
layout planFile: Layout plan.pdf10 Nov 2023
development planFile: Devlopment Plan.pdf10 Nov 2023
sanctioned drawingsFile: Section.pdf10 Nov 2023
Elevations drawingsFile: Elevation 1.pdf10 Nov 2023
NAFile: Ccb NA (1).pdf26 Oct 2023
RTC, survey 241/B-
Mutation, survey 241/B-
Encumbrance Certificate, survey 241/B-
Conversion/Alienation Order, survey 241/B-
Khatha, survey 241/B-
Certificate issued by CA Form 1File: Ccb NA.pdf-
Certificate issued by Architect Form 2File: Ccb NA.pdf-
Certificate issued by Engineer Form 3File: Ccb NA.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
Certificate from Chartered AccountFile: Certificate of Practice and Membership.pdf-
Balance Sheet 2022 - 2023File: Ccb NA.pdf-
Balance Sheet 2021 - 2022File: Ccb NA (2).pdf-
Balance Sheet 2020 - 2021File: Ccb NA (2).pdf-
Audited Profit and Loss Statement 2022 - 2023File: Ccb NA.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Ccb NA (2).pdf-
Audited Profit and Loss Statement 2020 - 2021File: Ccb NA (2).pdf-
Director's Report 2022 - 2023File: Ccb NA.pdf-
Director's Report 2021 - 2022File: Ccb NA (2).pdf-
Director's Report 2020 - 2021File: Ccb NA (2).pdf-
Cash Flow Statement 2022 - 2023File: Ccb NA (2).pdf-
Cash Flow Statement 2021 - 2022File: Ccb NA (2).pdf-
Auditor's Report 2022 - 2023File: Ccb NA (2).pdf-
Auditor's Report 2021 - 2022File: Ccb NA (2).pdf-
Auditor's Report 2020 - 2021File: Ccb NA (2).pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Ccb NA (2).pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Ccb NA (2).pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Ccb NA (2).pdf-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-
Ccb NA (2)-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep CITY COPORATION BELAGAVI 1484 AHP PROJECT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: City Corporation Belagavi

City Corporation Belagavi has 1 registration on RERA Karnataka, including CITY COPORATION BELAGAVI 1484 AHP PROJECT. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if CITY COPORATION BELAGAVI 1484 AHP PROJECT is delayed beyond 29 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of CITY COPORATION BELAGAVI 1484 AHP PROJECT?

The registered promoter entity is City Corporation Belagavi, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in CITY COPORATION BELAGAVI 1484 AHP PROJECT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at CITY COPORATION BELAGAVI 1484 AHP PROJECT?

The professionals named in the filing: Architect: SHUBHA DESHMUKH; Engineer: G H Basavaraj; Chartered Accountant: Manju Gowda KV. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CITY COPORATION BELAGAVI 1484 AHP PROJECT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CITY COPORATION BELAGAVI 1484 AHP PROJECT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CITY COPORATION BELAGAVI 1484 AHP PROJECT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.