Home / Browse projects / Bengaluru Urban, Karnataka / Chaithanya SANKHYA
Chaithanya SANKHYA
By Chaithanya Projects Private Limited
RG-KA-37997 · RERA PRM/KA/RERA/1251/446/PR/271123/006439 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Chaithanya SANKHYA is a Residential/Group Housing project by Chaithanya Projects Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/271123/006439 on 27 Nov 2023. Possession is promised by 30 Nov 2028. 29 of the 44 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete.
At a glance
Project
- NameChaithanya SANKHYA
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560049
- Pincode560049
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/271123/006439
- ReraGenie IDRG-KA-37997
Builder
- NameChaithanya Projects Private Limited
- Entity typeCompany
- CINU45209KA2000PTC026241
- GSTIN29AABCC4930H1ZQ
- Authorized SignatoryRajesh Jayaprakash
- Chairman and Managing DirectorGuru Prasad
- DirectorsGURU PRASAD, PADMAJA PRASAD, GANESH PRASAD
- Project HeadRajesh Jayaprakash
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Nov 2023
- Promised completion30 Nov 2028
- Revised completionNone
- Buildings1 building record
- Documents filed190 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 44 | 0 | 44 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 99%.
Building: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 99% |
| Foundation footing work | 100% |
| Upto Plinth Level | 95% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 95% |
| Plastering inside , outside & Ceiling | 93% |
| Joinery: Doors, Windows, Ventilators etc | 20% |
| Basic work of Water supply, Sanitary and Electrification | 80% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 83% |
| Railing and Grill fixing | 2% |
| Electrification, Water supply and Sanitary Finishing | 60% |
| Painting | 75% |
| Fire prevention and fire fighting fitting and fixture with network | 70% |
| Weather Proof work(tile,concrete) | 80% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 5% |
| Internal and External work including landscapes as per sanctioned drawings | 15% |
Progress on shared amenities41
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 20% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 50% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 98% |
| Corridor/Lobbies | Yes | 98% |
| Fire escapes | Yes | 98% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 95% |
| Terrace | No | Not applicable |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
| Solid Waste Management | Yes | 0% |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Anusuya Devi | - | - |
| M/s.Chaithanya Projects Private Limited | - | - |
| Anusuya Devi | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 179.68 cr | Rs 8.08 cr |
| On-site expenditure-Salaries of workers | Rs 27.22 cr | - |
| On-site expenditure-Site Overhead | Rs 20.21 cr | Rs 3.46 cr |
| On-site expenditure-Consultants Fees | Rs 6.80 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 1.50 cr | - |
| Payment of taxes | Rs 25.00 lakh | Rs 76.91 lakh |
| Payment of fees | Rs 15.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shivanna Gowda B |
| Engineer | V Varada Rajulu |
| Chartered Accountant | VINAY TYAGARAJ |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed190
As listed on the registration, under the names the promoter filed them with; the newest 80 of 190 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/271123/006439 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Sep 26.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Sep 26.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU Sep 26.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU June 26.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU June 26.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU June 26.pdf | 10 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 10 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 10 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 10 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 10 Jul 2026 |
| Q1 2026-27 Fire and Safety | 10 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 10 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 10 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU March 26.pdf | 30 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU March 26.pdf | 30 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU March 26.pdf | 30 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 30 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 30 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 30 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 30 Apr 2026 |
| Q4 2025-26 Fire and Safety | 30 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 30 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 30 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Dec 25.pdf | 12 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Dec 25.pdf | 12 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU Dec 25.pdf | 12 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 12 Feb 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 12 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Feb 2026 |
| Q3 2025-26 Fire and Safety | 12 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 12 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 12 Feb 2026 |
| Form 1 CA CertificateFile: 2 Form 1 CA Certificate.pdf | 21 Nov 2023 |
| Auditors Report FY 2022-23File: 3 Auditors Report FY 2022-23.pdf | 21 Nov 2023 |
| Balance Sheet with Schedules FY 2022-23File: 3 Balance Sheet with Schedules FY 2022-23.pdf | 21 Nov 2023 |
| Cash Flow Statement FY 2022-23File: 3 Cash Flow Statement FY 2022-23.pdf | 21 Nov 2023 |
| Directors Report FY 2022-23File: 3 Directors Report FY 2022-23.pdf | 21 Nov 2023 |
| ITR FY 2023-24File: 3 ITR FY 2023-24.pdf | 21 Nov 2023 |
| Profit and Loss FY 2022-23File: 3 Profit and Loss FY 2022-23.pdf | 21 Nov 2023 |
| MR 6 Sy No 183 1 184 2File: 4 MR 6 Sy No 183 1 184 2.pdf | 21 Nov 2023 |
| MR 44 Sy No 183File: 4 MR 44 Sy No 183.pdf | 21 Nov 2023 |
| MR 30 Ramaiah to NagarajuFile: 5 MR 30 Ramaiah to Nagaraju.pdf | 21 Nov 2023 |
| MR 44 2010-11 Nagaraju to Chandra MurthyFile: 5 MR 44 2010-11 Nagaraju to Chandra Murthy.pdf | 21 Nov 2023 |
| Partition Decree of the OS No 8261995File: 5 Partition Decree of the OS No 8261995.pdf | 21 Nov 2023 |
| Sale Deed Nagaraju to ChandramurthyFile: 5 Sale Deed Nagaraju to Chandramurthy.pdf | 21 Nov 2023 |
| Gift Deed Ramaiah to Anusuya DeviFile: 5 Gift Deed Ramaiah to Anusuya Devi.pdf | 21 Nov 2023 |
| Family tree -Anusuya deviFile: 5 Family tree -Anusuya devi.pdf | 21 Nov 2023 |
| Khatha Sy No 183 1File: 6 Khatha Sy No 183 1.pdf | 21 Nov 2023 |
| Khatha Sy No 183 1File: 7 Khatha Sy No 183 1.pdf | 21 Nov 2023 |
| Khatha Sy No 183 2File: 7 Khatha Sy No 183 2.pdf | 21 Nov 2023 |
| Khatha Sy No 184 2File: 7 Khatha Sy No 184 2.pdf | 21 Nov 2023 |
| Sale deed Sy No 183 2File: 7 Sale deed Sy No 183 2.pdf | 21 Nov 2023 |
| Legal Search Report Sy No 183 1File: 8 Legal Search Report Sy No 183 1.pdf | 21 Nov 2023 |
| Legal Search Report Sy No 183 2File: 8 Legal Search Report Sy No 183 2.pdf | 21 Nov 2023 |
| Legal Search Report Sy No 184 2File: 8 Legal Search Report Sy No 184 2.pdf | 21 Nov 2023 |
| Form 2 Architect CertificateFile: 9 Form 2 Architect Certificate.pdf | 21 Nov 2023 |
| Architect LicenseFile: 9 Architect License.pdf | 21 Nov 2023 |
| Development PlanFile: 10 Development Plan.pdf | 21 Nov 2023 |
| Clarification on Kharab LandFile: 11 Clarification on Kharab Land.pdf | 21 Nov 2023 |
| Village MapFile: 12 Village Map.pdf | 21 Nov 2023 |
| Building License DeclarationFile: 13 Building License Declaration.pdf | 21 Nov 2023 |
| Proforma Allotment LetterFile: 14 Proforma Allotment Letter.pdf | 21 Nov 2023 |
| Proforma of Agremment for saleFile: 15 Proforma of Agremment for sale.pdf | 21 Nov 2023 |
| AAI NOCFile: 16 AAI NOC.pdf | 21 Nov 2023 |
| Structural Stability CertificateFile: 17 Structural Stability Certificate.pdf | 21 Nov 2023 |
| Water NOCFile: 18 Water NOC.pdf | 21 Nov 2023 |
| Clarification on Source of Water SupplyFile: 19 Clarification on Source of Water Supply.pdf | 21 Nov 2023 |
| Fire NOCFile: 20 Fire NOC.pdf | 21 Nov 2023 |
| RTC, survey 183/1 | - |
| Mutation, survey 183/1 | - |
| Encumbrance Certificate, survey 183/1 | - |
| Conversion/Alienation Order, survey 183/1 | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Chaithanya Samarth | Mandur Village,Bidarahalli Hobli, Bangalore East Taluk | Ongoing | Mar 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Chaithanya SANKHYA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
Floris & Commercial at Brigade Autograph
Ananthay Properties Private Limited
Godrej Woodscapes
Godrej Properties Limited
Sattva Songbird
Sattva Resi Private Limited
Godrej Splendour
Godrej Properties Limited
PAVANI MIRABILIA PHASE I
Sai Sravanthi Infra Projects Pvt Ltd
Godrej Splendour Phase II
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Chaithanya Projects Private Limited
Chaithanya Projects Private Limited has 1 registration on RERA Karnataka, including Chaithanya SANKHYA. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Chaithanya SANKHYA is delayed beyond 30 Nov 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Chaithanya SANKHYA?
The registered promoter entity is Chaithanya Projects Private Limited, a company as per the filing. Its CIN U45209KA2000PTC026241 and GSTIN 29AABCC4930H1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Chaithanya SANKHYA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Chaithanya SANKHYA?
The professionals named in the filing: Architect: Shivanna Gowda B; Engineer: V Varada Rajulu; Chartered Accountant: VINAY TYAGARAJ. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Chaithanya SANKHYA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback