Home / Browse projects / Bengaluru Urban, Karnataka / Casagrand Meridian
Casagrand Meridian
By CASA GRANDE GARDEN CITY BUILDERS PVT LTD
RG-KA-18561 · RERA PRM/KA/RERA/1251/446/PR/181122/005482 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 17 complaints at RERA Karnataka
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
Saved.
Casagrand Meridian is a Residential/Group Housing project by CASA GRANDE GARDEN CITY BUILDERS PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/181122/005482 on 18 Nov 2022. Possession is promised by 2 Nov 2026. The completion date has moved by 12 months from the original filing. 215 of the 215 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete. 17 complaints are on record with the regulator.
At a glance
Project
- NameCasagrand Meridian
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560049
- Pincode560049
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/181122/005482
- ReraGenie IDRG-KA-18561
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Nov 2022
- Promised completion2 Nov 2026
- Revised completionRevised to 2 Nov 2026 (originally 2 Nov 2025)
- Buildings1 building record
- Documents filed174 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 215 | 0 | 215 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 18 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 100% |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | Yes | 100% |
| Community Hall | Yes | 100% |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | No | Not applicable |
| Power Backup | Yes | 100% |
| Piped Gas | Yes | 100% |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | Yes | 100% |
| Water conservation and renewable energy | Yes | 100% |
| Common storage spaces | Yes | 100% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s CASA GRANDE CITY GARDEN CITY BUILDERS PVT LTD | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 119.47 cr | Rs 5.40 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nagesh PS |
| Engineer | Shivaraj G Naik |
| Chartered Accountant | NARAYANA RAO M |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of Labour
Complaints filed with RERA Karnataka17
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00337/2023 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 15/03/2023 |
| 01748/2023 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 22/11/2023 |
| 00688/2025 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 29/04/2025 |
| 00479/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 06/05/2026 |
| 00518/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 13/05/2026 |
| 00806/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 14/07/2026 |
| 01122/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 15/09/2026 |
| 01148/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 24/09/2026 |
| 01151/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 24/09/2026 |
| 01168/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 01/10/2026 |
| 01196/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 06/10/2026 |
| 01211/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 12/10/2026 |
| 01212/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 12/10/2026 |
| 01266/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 29/10/2026 |
| 01271/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 30/10/2026 |
| 01289/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 03/11/2026 |
| 01301/2026 | - | CASA GRANDE GARDEN CITY BUILDERS PVT LTD | 05/11/2026 |
Documents filed174
As listed on the registration, under the names the promoter filed them with; the newest 80 of 174 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/181122/005482 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA CA form 4 sep 2026 Meridian.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Affidavit with NOCSFile: Affidavit with NOCS.pdf | 7 Sep 2026 |
| EC Certified copyFile: EC MERIDIAN Certified copy.pdf | 2 Sep 2026 |
| Building PlanFile: Meridian Building Pla .PDF | 2 Sep 2026 |
| Building Plan LetterFile: Meridian Building Licence.pdf | 2 Sep 2026 |
| BESCOM NOCFile: Bhattarahalli BESCOM NOC.pdf | 2 Sep 2026 |
| BWSSB NOCFile: BWSSB NOC Bhattarahalli.pdf | 2 Sep 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA CA form 4 june 2026 Meridian.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect cert QU1 June.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engg Proj Meridian Jun 2026 Qtr.pdf | 10 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 10 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 10 Jul 2026 |
| Q1 2026-27 Fire and Safety | 10 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 10 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate.pdf | 11 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect cert Meridian.pdf | 11 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engg Proj Meridian .pdf | 11 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 11 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 11 Apr 2026 |
| Q4 2025-26 Fire and Safety | 11 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 11 Apr 2026 |
| EC Certified copyFile: EC MERIDIAN Certified copy.pdf | 19 Jan 2026 |
| BWSSB NOCFile: BWSSB NOC Bhattarahalli.pdf | 19 Jan 2026 |
| BESCOM NOCFile: Bhattarahalli BESCOM NOC.pdf | 19 Jan 2026 |
| AAI NOCFile: Bhattarahalli AAI.pdf | 19 Jan 2026 |
| BSNL NOCFile: Bhattarahalli BSNL NOC.pdf | 19 Jan 2026 |
| FIRE NOCFile: Bhattarahalli Fire NOC OrderCertificate (1).pdf | 19 Jan 2026 |
| Building LicenceFile: Meridian Building Licence.pdf | 19 Jan 2026 |
| Building PlanFile: Meridian Building Pla .PDF | 19 Jan 2026 |
| sold and unsold detailsFile: Sold & Unsold Details.pdf | 19 Jan 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: RERA CA FORM 4 dec 2025 Meridian.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect cert QU3 Dec 25 Proj Meridian.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engg Proj Meridian Dec 25 Qtr.pdf | 13 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Jan 2026 |
| Q3 2025-26 Fire and Safety | 13 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 13 Jan 2026 |
| Sanction Plan/Project planFile: Approved Project plan.PDF | 16 Nov 2022 |
| Building LicenseFile: Building License.pdf | 16 Nov 2022 |
| Balance Sheet for 2021-22File: Blalance sheet 2021-22.pdf | 16 Nov 2022 |
| Profit and loss statement for 2021-22File: Profit and Loss 2021-22.pdf | 16 Nov 2022 |
| Audit report for 2021-22File: Audit Report for March 22.pdf | 16 Nov 2022 |
| ITR Ack 2021-22File: ITR ACK 2021-22.pdf | 16 Nov 2022 |
| Directors reportFile: Directors report.pdf | 16 Nov 2022 |
| Cashflow Statement 2021-22File: Cashflow statement 2021-22.pdf | 16 Nov 2022 |
| ITR Ack 2020-21File: ITR for 2020-21.pdf | 16 Nov 2022 |
| Form 1 CA certificateFile: Form 1 CA CERTIFICATE c.pdf | 16 Nov 2022 |
| Form B AffidavitFile: Form B affadavit.pdf | 16 Nov 2022 |
| Non Litigation AffidavitFile: Non Litigation affidavit.pdf | 16 Nov 2022 |
| Sec 3(1) Non violation affidavitFile: Sec 3(1) Affidavit.pdf | 16 Nov 2022 |
| RTC for Sy No 48File: RTC.pdf | 16 Nov 2022 |
| MR for Sy No 48File: MR.pdf | 16 Nov 2022 |
| Title Deed (Gift Deed)File: Gift Deed.pdf | 16 Nov 2022 |
| Mortgage DeedFile: Mortgage Deed.pdf | 16 Nov 2022 |
| Guidance Value DocumentFile: Bhattarahalli Guideline Value.pdf | 16 Nov 2022 |
| Legal OpinionFile: Legal Opinion.pdf | 16 Nov 2022 |
| ECFile: EC.pdf | 16 Nov 2022 |
| CDP Master extractFile: CDP Master extract.pdf | 16 Nov 2022 |
| NOC KSPCB with fee receiptFile: NOC KSPCB with fee receipt.pdf | 16 Nov 2022 |
| NOC Fire with fee receiptFile: NOC Fire with fee receipt.pdf | 16 Nov 2022 |
| NOC BESCOM with fee receiptFile: NOC BESCOM with fee receipt.pdf | 16 Nov 2022 |
| NOC BWSSB with Fee receiptFile: NOC BWSSB with Fee receipt.pdf | 16 Nov 2022 |
| NOC AAIFile: NOC AAI.pdf | 16 Nov 2022 |
| Project SpecificationFile: Project Specification.pdf | 16 Nov 2022 |
| STP demarcationFile: STP DEMARCATION.pdf | 16 Nov 2022 |
| STP design and drawingsFile: STP Design and Drawings.pdf | 16 Nov 2022 |
| Structural stability CertificateFile: Structural safety.pdf | 16 Nov 2022 |
| Village Map demarcationFile: Village Map Demarcation.pdf | 16 Nov 2022 |
| Clarification on Sold and Unsold unitsFile: Sold & Unsold.pdf | 16 Nov 2022 |
| Clarification on commencement certificateFile: Clarification on Commencement Certificate.pdf | 16 Nov 2022 |
| Google Map demarcationFile: Google Map Demarcation.pdf | 16 Nov 2022 |
| COA certificate of architectFile: COA.pdf | 16 Nov 2022 |
| Proforma Sale agreementFile: Sale Agreement.pdf | 16 Nov 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| CASAGRAND ORLENA | Thanisandra Main Rd, Ashwath Nagar, HBR Layout, Bengaluru, Karnataka 560077 | Ongoing | Aug 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Casagrand Meridian on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
Floris & Commercial at Brigade Autograph
Ananthay Properties Private Limited
Godrej Woodscapes
Godrej Properties Limited
Sattva Songbird
Sattva Resi Private Limited
Godrej Splendour
Godrej Properties Limited
PAVANI MIRABILIA PHASE I
Sai Sravanthi Infra Projects Pvt Ltd
Godrej Splendour Phase II
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Casa Grande Garden City Builders Pvt ltd has 17 registrations on RERA Karnataka, including Casagrand Florella Phase 2 and CASAGRAND VIVACITY. Its filings declare 12 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Casagrand Meridian is delayed beyond 2 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Casagrand Meridian?
The registered promoter entity is CASA GRANDE GARDEN CITY BUILDERS PVT LTD, a company as per the filing. Its GSTIN 29AAGCC1577R1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Casagrand Meridian?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Casagrand Meridian?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Casagrand Meridian?
The professionals named in the filing: Architect: Nagesh PS; Engineer: Shivaraj G Naik; Chartered Accountant: NARAYANA RAO M. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Casagrand Meridian?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback