Home / Browse projects / Bengaluru Urban, Karnataka / Brigade Horizon
Brigade Horizon
By Brigade Enterprises Limited
RG-KA-09714 · RERA PRM/KA/RERA/1251/310/PR/190722/005086 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Brigade Horizon is a Residential/Group Housing project by Brigade Enterprises Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190722/005086 on 19 Jul 2022. Possession is promised by 31 Dec 2026. 368 of the 372 units on this registration are recorded sold or booked, and 16 of 18 construction stages are filed complete.
At a glance
Project
- NameBrigade Horizon
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560060
- Pincode560060
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/190722/005086
- ReraGenie IDRG-KA-09714
Builder
- NameBrigade Enterprises Limited
- Entity typeCompany
- CINL85110KA1995PLC019126
- GSTIN29AAACB7459F1ZI
- Authorized SignatoryMr. Viswa Prathap Desu
- Chief Sales OfficerMr. Viswa Prathap Desu
- DirectorsMr. M. R. Jaishankar, Mr. Bijou Kurien, Mr. Aroon Raman, Ms. Lakshmi Venkatachalam, Mr. Pradeep Kumar Panja, Dr. Venkatesh Panchapagesan, Mr. Amar Mysore, Ms. Pavitra Shankar, Ms. Nirupa Shankar, Mr. Roshin Mathew
- Project HeadRajashekhar G V
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on19 Jul 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings18 building records
- Documents filed122 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 35 | 0 | 35 |
| Tower B | - | - | - | 34 | 0 | 34 |
| Tower C | - | - | - | 14 | 0 | 14 |
| Tower D | - | - | - | 13 | 0 | 13 |
| Tower E | - | - | - | 19 | 0 | 19 |
| Tower F | - | - | - | 12 | 0 | 12 |
| Tower G | - | - | - | 20 | 0 | 20 |
| Tower H | - | - | - | 25 | 0 | 25 |
| Tower I | - | - | - | 15 | 0 | 15 |
| Tower J | - | - | - | 20 | 0 | 20 |
| Tower K | - | - | - | 25 | 0 | 25 |
| Tower L | - | - | - | 20 | 0 | 20 |
| Tower M | - | - | - | 17 | 0 | 17 |
| Tower N | - | - | - | 21 | 0 | 21 |
| Tower O | - | - | - | 20 | 0 | 20 |
| Tower P | - | - | - | 27 | 0 | 27 |
| Tower Q | - | - | - | 15 | 0 | 15 |
| Tower R | - | - | - | 20 | 0 | 20 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 18 construction stages are filed complete. The stage furthest along is Electrification, at 98%.
Building: 94% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 98% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 98% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 98% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 95% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 80% |
| Storm water drains | Yes | 98% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 80% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | Yes | 100% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Brigade Enterprises Limited | - | - |
| Brigade Enterprises Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 111.76 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 6.40 cr | - |
| On-site expenditure-Site Overhead | Rs 6.25 cr | - |
| On-site expenditure-Salaries of workers | Rs 27.04 lakh | - |
| On-site expenditure-Consultants Fees | Rs 10.85 lakh | - |
| Payment of taxes | Rs 7.24 lakh | - |
| Payment of Premiums | Rs 46,959 | - |
| Payment of cess | Rs 41,378 | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mindspace Architects |
| Engineer | BASE Engineering Services |
| Chartered Accountant | R. Srinivasan |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed122
As listed on the registration, under the names the promoter filed them with; the newest 80 of 122 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190722/005086 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Brigade Horizon - Form 4 - Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Brigade Horizon - Form 5 - Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Brigade Horizon - Form 6 - Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Brigade Horizon - Form 4 - Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Brigade Horizon - Form 5 - Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Brigade Horizon - Form 6 - Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brigade Horizon - Form 4 - Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Brigade Horizon - Form 5 - Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brigade Horizon - Form 6 - Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brigade Horizon - Form 4 - Q3.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Brigade Horizon - Form 5 - Q3.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brigade Horizon - Form 6 - Q3.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Brigade Horizon - Agreement to SellFile: Brigade Horizon - Agreement to Sell for RERA Registration.pdf | 15 Jul 2022 |
| Brigade Horizon - Area StatementFile: Brigade Horizon - Area Statement.pdf | 15 Jul 2022 |
| Brigade Reply to RERA QueriesFile: Brigade Horizon - Brigade Reply to RERA queries.pdf | 15 Jul 2022 |
| Sale Deed from Harish to Brigade - Sy No. 248/1File: Sale Deed - BEL - 1 Acre.pdf | 7 Jul 2022 |
| Sale Deed from Pushpalatha Dhariwal to Brigade - Sy No. 248/2File: Sale Deed - BEL - 4 Acre.pdf | 7 Jul 2022 |
| Sale Deed dt. 22.05.2006File: Sale Deed.pdf | 7 Jul 2022 |
| Khata Certificate for Sy No. 248/2File: Brigade Horizon - Khata - Sy No 248-2.pdf | 7 Jul 2022 |
| Guideline ValueFile: Brigade Horizon - Guideline Value.pdf | 7 Jul 2022 |
| Engineer Certificate with rectified cost detailsFile: Brigade Horizon - Engineer Certificate.pdf | 7 Jul 2022 |
| Project Specification duly signed by ArchitectFile: Brigade Horizon - Specification.pdf | 7 Jul 2022 |
| BESCOM NOC - Sy No. 248/1File: Brigade Horizon - BESCOM NOC.pdf | 7 Jul 2022 |
| AAI NOC - Sy No. 248/1File: Brigade Horizon - AAI NOC.pdf | 7 Jul 2022 |
| Fire NOC - Sy No. 248/1File: Brigade Horizon Fire NOC.pdf | 7 Jul 2022 |
| BESCOM NOC - Sy No. 248/2File: Brigade Horizon - Bescom NOC - Sy No 248-2.pdf | 7 Jul 2022 |
| KSPCB NOC - Sy No. 248/2File: Brigade Horizon - CFE.pdf | 7 Jul 2022 |
| SEIAA NOC - Sy No. 248/2File: Brigade Horizon - SEIAA.pdf | 7 Jul 2022 |
| Proforma Agreement for SaleFile: Brigade Horizon - Agreement to Sell for RERA Registration.pdf | 7 Jul 2022 |
| STP ReportFile: Brigade Horizon - STP Report.pdf | 7 Jul 2022 |
| STP PlanFile: Brigade Horizon - STP Plan.pdf | 7 Jul 2022 |
| Brigade Reply to RERA QueryFile: Brigade Horizon - Brigade Reply to RERA queries.pdf | 7 Jul 2022 |
| RTC, survey 248/1 | - |
| Mutation, survey 248/1 | - |
| Encumbrance Certificate, survey 248/1 | - |
| Conversion/Alienation Order, survey 248/1 | - |
| Sale/Title/Gift Deed, survey 248/1 | - |
| Khatha, survey 248/1 | - |
| RTC, survey 248/2 | - |
| Mutation, survey 248/2 | - |
| Encumbrance Certificate, survey 248/2 | - |
| Conversion/Alienation Order, survey 248/2 | - |
| Sale/Title/Gift Deed, survey 248/2 | - |
| Khatha, survey 248/2 | - |
| Registration CertificateFile: Certificate of Incorporation - BEL copy.pdf | - |
| Organization StructureFile: Organogram.pdf | - |
| Certificate issued by CA Form 1File: Brigade Horizon - Form 1.pdf | - |
| Certificate issued by Architect Form 2File: Brigade Horizon - Form 2.pdf | - |
| Certificate issued by Engineer Form 3File: Brigade Horizon - Form 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Brigade Horizon - Affidavit for Litigation.pdf | - |
| Certificate from Chartered AccountFile: Brigade Horizon - Approval Cost.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet - 2020-21 with CA UDIN.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet - 2019-20 with CA UDIN.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Brigade Horizon on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 26 registered projects within 2 km.
JITO RANKA NAGAR
Essence Realty LLP
Provident Equinox 4
Provident Housing Limited
Provident Equinox 6
Provident Housing Limited
KOMMAGHATTA NPKL PHASE-1
Bangalore Development Authority
VBHC Haven of Joy
VBHC Mumbai Value Homes Pvt Ltd
Provident Equinox 5
Provident Housing Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Brigade Enterprises Limited
Brigade Enterprises Limited has 3 registrations on RERA Karnataka, including Azalea at Brigade Meadows and Brigade Horizon. Its filings disclose no earlier RERA Karnataka projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Brigade Horizon is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Brigade Horizon?
The registered promoter entity is Brigade Enterprises Limited, a company as per the filing. Its CIN L85110KA1995PLC019126 and GSTIN 29AAACB7459F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Brigade Horizon?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Brigade Horizon?
The professionals named in the filing: Architect: Mindspace Architects; Engineer: BASE Engineering Services; Chartered Accountant: R. Srinivasan. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Brigade Horizon?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback