Valid until 30 Apr 2027 Residential/Group Housing project

Bougan Villa 108

By SHREE GANESH LIVING SPACES

RG-GJ-47873 · RERA PR/GJ/VADODARA/VAGHODIA/Others/RAA09705/180122 · Last updated on GujRERA portal: 7 Nov 2023

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2027Possession promisedno revision filed
2 of 9Construction stages donefurthest along: Slabs of Super Structure, 56%
63 of 72Units unsoldnot recorded sold or booked
Jump to the 39 documents Report an error

Bougan Villa 108 is a Residential/Group Housing project by SHREE GANESH LIVING SPACES in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VAGHODIA/Others/RAA09705/180122 on 18 Jan 2022. Possession is promised by 30 Apr 2027. 9 of the 72 units on this registration are recorded sold or booked, and 2 of 9 construction stages are filed complete.

At a glance

Project

  • NameBougan Villa 108
  • TypeResidential/Group Housing
  • Location
    • C04 PLATINUM
    • NEAR NAVRACHANA UNIVERSITY
    • OLD PADRA ROAD
    • Vadodara
    • 391410
  • Pincode391410
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VAGHODIA/Others/RAA09705/180122
  • ReraGenie IDRG-GJ-47873

Builder

  • NameSHREE GANESH LIVING SPACES
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJan 2022PromisedApr 2027

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2027
  • Registered on18 Jan 2022
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed39 files

Current status

12%9 of 72 units booked
14.0%Of the estimated cost spent so far

Figures as on 7 Nov 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalows---72072

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 7 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 56%.

Bungalows: 36% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor3%
Slabs of Super Structure56%
Internal walls, internal plaster, floorings, doors and windows within flats16%
Sanitary fittings within the flats3%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks42%
External plumbing and external plaster, elevation, completion of terraces with waterproofing3%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing3%

Progress on shared amenities23

As on 7 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes45%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%
Compound wallYes100%
Plinth protectionYes0%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area67,579 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 19.50 cr
Cost incurredRs 2.74 cr
Spent of the estimate14.04%
BuildingWingEstimatedIncurred
BungalowsNARs 19.50 crRs 2.74 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDharmesh J Patel
EngineerAashutosh Desai

Documents filed39

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VAGHODIA/Others/RAA09705/180122 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)7 Nov 2023
Engineer's certificate annexure7 Nov 2023
RERA registration certificate18 Jan 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Proforma sale deed-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

12%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep Bougan Villa 108 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmBougan Villa 108Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 145 registered projects within 2 km.

Builder: SHREE GANESH LIVING SPACES

SHREE GANESH LIVING SPACES has 1 registration on GujRERA, including Bougan Villa 108. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if Bougan Villa 108 is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Bougan Villa 108?

The registered promoter entity is SHREE GANESH LIVING SPACES, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Bougan Villa 108?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Bougan Villa 108?

The professionals named in the filing: Architect: Dharmesh J Patel; Engineer: Aashutosh Desai. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bougan Villa 108?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bougan Villa 108. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bougan Villa 108 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.