ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / PMAY BHAYLI 392 EWS-II FP 114

Valid until 7 Mar 2022 Mixed Development project

PMAY BHAYLI 392 EWS-II FP 114

By VADODARA URBAN DEVELOPMENT AUTHORITY

RG-GJ-33770 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA05770/230719 · Last updated on GujRERA portal: 15 Nov 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Mar 2022Possession promisedno revision filed
57 of 72Construction stages doneacross 8 buildings; furthest along: Plinth, 0%
36 of 418Units unsoldnot recorded sold or booked
Jump to the 48 documents Report an error

PMAY BHAYLI 392 EWS-II FP 114 is a Mixed Development project by VADODARA URBAN DEVELOPMENT AUTHORITY in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA05770/230719 on 23 Jul 2019. Possession is promised by 7 Mar 2022. 382 of the 418 units on this registration are recorded sold or booked, and 57 of 72 construction stages are filed complete.

At a glance

Project

  • NamePMAY BHAYLI 392 EWS-II FP 114
  • TypeMixed Development
  • Location
    • BHAYLI PLOT NO. 114 TP 3
    • BHAYLI
    • Bhayli
    • Vadodara
    • 391410
  • Pincode391410
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA05770/230719
  • ReraGenie IDRG-GJ-33770

Builder

  • NameVADODARA URBAN DEVELOPMENT AUTHORITY
  • Entity typeBOI
  • Other registrations28 more →

Key dates

this monthRegisteredJul 2019PromisedMar 2022

Key facts

Registration and timeline

  • StatusValid until 7 Mar 2022
  • Registered on23 Jul 2019
  • Promised completion7 Mar 2022
  • Revised completionNone
  • Buildings8 building records
  • Documents filed48 files

Current status

91%382 of 418 units booked
84.8%Of the estimated cost spent so far

Figures as on 15 Nov 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C---56056
D---56056
E---56056
F---42042
G---42042
H---28028
A---561369
B---561369

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building8

As on 15 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

57 of 72 construction stages are filed complete across 8 buildings. The stage furthest along is Plinth, at 0%.

C78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
E78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
F78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
H89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 15 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,052 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 25.09 cr
Cost incurredRs 21.28 cr
Spent of the estimate84.82%
BuildingWingEstimatedIncurred
ANARs 3.14 crRs 2.66 cr
BNARs 3.14 crRs 2.66 cr
CNARs 3.14 crRs 2.66 cr
DNARs 3.14 crRs 2.66 cr
ENARs 3.14 crRs 2.66 cr
FNARs 3.14 crRs 2.66 cr
GNARs 3.14 crRs 2.66 cr
HNARs 3.14 crRs 2.66 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAMTA SHAH AND ASSOCIATES
EngineerAMI DESAI

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA05770/230719 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)15 Nov 2024
Engineer's certificate (Form 2)12 Nov 2024
Engineer's certificate annexure12 Nov 2024
Architect's certificate (Form 1)19 Apr 2024
Site photograph, C18 Apr 2024
Site photograph, D18 Apr 2024
Site photograph, E18 Apr 2024
Site photograph, F18 Apr 2024
Site photograph, G18 Apr 2024
Site photograph, H18 Apr 2024
Site photograph, A18 Apr 2024
Site photograph, B18 Apr 2024
RERA registration certificate23 Jul 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

91%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep PMAY BHAYLI 392 EWS-II FP 114 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bhayli2,900+ in Vadodara

2 kmPMAY BHAYLI 392 EWS-II FOther 378Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: VADODARA URBAN DEVELOPMENT AUTHORITY

VADODARA URBAN DEVELOPMENT AUTHORITY has 29 registrations on GujRERA, including PMAY-KHATAMBA and PMAY-SEWASI-F.P.75. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if PMAY BHAYLI 392 EWS-II FP 114 is delayed beyond 7 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of PMAY BHAYLI 392 EWS-II FP 114?

The registered promoter entity is VADODARA URBAN DEVELOPMENT AUTHORITY, a boi as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in PMAY BHAYLI 392 EWS-II FP 114?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PMAY BHAYLI 392 EWS-II FP 114?

The professionals named in the filing: Architect: MAMTA SHAH AND ASSOCIATES; Engineer: AMI DESAI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PMAY BHAYLI 392 EWS-II FP 114?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PMAY BHAYLI 392 EWS-II FP 114. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PMAY BHAYLI 392 EWS-II FP 114 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.