ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / ANANTA SAVERA SWAGATAM

Valid until 30 Sep 2021 Residential/Group Housing project

ANANTA SAVERA SWAGATAM

By S S INFRA

RG-GJ-65766 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA03251/EX1/150321 · Last updated on GujRERA portal: 7 Aug 2021

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2021Possession promisedmoved 12 months from the original
32 of 47Construction stages doneacross 8 buildings; furthest along: Slabs of Super Structure, 99%
27 of 420Units unsoldnot recorded sold or booked
Jump to the 36 documents Report an error

ANANTA SAVERA SWAGATAM is a Residential/Group Housing project by S S INFRA in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA03251/EX1/150321 on 26 Jul 2018. Possession is promised by 30 Sep 2021. The completion date has moved by 12 months from the original filing. 393 of the 420 units on this registration are recorded sold or booked, and 32 of 47 construction stages are filed complete.

At a glance

Project

  • NameANANTA SAVERA SWAGATAM
  • TypeResidential/Group Housing
  • Location
    • SURVEY NO -579
    • NR SHREE HARI DUPLEX
    • ATLADRA BIL ROAD
    • Bil
    • Vadodara
    • 391410
  • Pincode391410
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA03251/EX1/150321
  • ReraGenie IDRG-GJ-65766

Builder

  • NameS S INFRA
  • Entity typePARTNERSHIP FIRM
  • Other registrations2 more →

Key dates

this monthRegisteredJul 2018First promiseSep 2020Revised toSep 2021

Key facts

Registration and timeline

  • StatusValid until 30 Sep 2021
  • Registered on26 Jul 2018
  • Promised completion30 Sep 2021
  • Revised completionRevised to 30 Sep 2021 (originally 30 Sep 2020)
  • Buildings8 building records
  • Documents filed36 files

Current status

94%393 of 420 units booked
90.6%Of the estimated cost spent so far

Figures as on 7 Aug 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWAGATAM TYPE D---60060
SWAGATAM TYPE E---74074
SWAGATAM TYPE F---1080108
SAVERA TYPE A---61061
SAVERA TYPE B---33033
SWAGATAM TYPE A---48048
SWAGATAM TYPE B---18018
SWAGATAM TYPE C---18018

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building8

As on 7 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 47 construction stages are filed complete across 8 buildings. The stage furthest along is Slabs of Super Structure, at 99%.

SWAGATAM TYPE D98%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats85%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
SWAGATAM TYPE E94%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure99%
Internal walls, internal plaster, floorings, doors and windows within flats94%
Sanitary fittings within the flats74%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing97%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
SWAGATAM TYPE F95%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats75%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing95%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
SAVERA TYPE A84%
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats77%
Sanitary fittings within the flats41%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
SAVERA TYPE B82%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats64%
Sanitary fittings within the flats30%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
SWAGATAM TYPE A96%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats79%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
SWAGATAM TYPE B97%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats83%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
SWAGATAM TYPE C99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats94%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable

Progress on shared amenities19

As on 7 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes95%
Landscaping and tree plantingYes70%
Street lightingYes100%
Community buildingsYes35%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area52,532 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 49.69 cr
Cost incurredRs 45.02 cr
Spent of the estimate90.61%
BuildingWingEstimatedIncurred
SAVERA TYPE ANARs 6.21 crRs 5.63 cr
SAVERA TYPE BNARs 6.21 crRs 5.63 cr
SWAGATAM TYPE ANARs 6.21 crRs 5.63 cr
SWAGATAM TYPE BNARs 6.21 crRs 5.63 cr
SWAGATAM TYPE CNARs 6.21 crRs 5.63 cr
SWAGATAM TYPE DNARs 6.21 crRs 5.63 cr
SWAGATAM TYPE ENARs 6.21 crRs 5.63 cr
SWAGATAM TYPE FNARs 6.21 crRs 5.63 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/RAA03251/EX1/150321Applied Feb 2021; approved Mar 2021

Documents filed36

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA03251/EX1/150321 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Aug 2021
Engineer's certificate (Form 2)7 Aug 2021
Engineer's certificate annexure7 Aug 2021
Accountant's certificate (Form 3)7 Aug 2021
RERA registration certificate26 Jul 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

94%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 12 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep ANANTA SAVERA SWAGATAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bil2,900+ in Vadodara

2 kmANANTA SAVERA SWAGATAMOther 248Dot size: filed unitsN

Filed coordinates, straight-line distance. 248 registered projects within 2 km.

Builder: S S INFRA

S S INFRA has 3 registrations on GujRERA, including ANANTA SAVERA SWAGATAM and SWASTIK SOPAN-1. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if ANANTA SAVERA SWAGATAM is delayed beyond 30 Sep 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ANANTA SAVERA SWAGATAM?

The registered promoter entity is S S INFRA, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ANANTA SAVERA SWAGATAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in ANANTA SAVERA SWAGATAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANTA SAVERA SWAGATAM. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANTA SAVERA SWAGATAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.