Azalea at Brigade Meadows
By Brigade Enterprises Limited
RG-KA-37345 · RERA PRM/KA/RERA/1251/310/PR/180826/008875 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Azalea at Brigade Meadows is a Residential/Group Housing project by Brigade Enterprises Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180826/008875 on 18 Aug 2026. Possession is promised by 31 Jul 2029. 7 of the 40 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameAzalea at Brigade Meadows
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560082
- Pincode560082
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/180826/008875
- ReraGenie IDRG-KA-37345
Builder
- NameBrigade Enterprises Limited
- Entity typeCompany
- CINL85110KA1995PLC019126
- GSTIN29AAACB7459F1ZI
- Authorized SignatoryMr. Viswa Prathap Desu
- Managing DirectorPavitra Shankar
- DirectorsMr. M. R. Jaishankar, Ms. Pavitra Shankar, Ms. Nirupa Shankar, Mr. Roshin Mathew, Mr. Amar Mysore, Mr. Pradyumna Krishna Kumar, Ms. Lakshmi Venkatachalam, Mr. Pradeep Kumar Panja, Dr. Venkatesh Panchapagesan, Mr. Velloor Venkatakrishnan Ranganathan, Mr. Abraham Stephanos, Ms. Padmaja Chunduru
- Project HeadNataraj M
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Aug 2026
- Promised completion31 Jul 2029
- Revised completionNone
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 40 | 0 | 40 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 50%.
Building: 3% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 50% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities47
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Café/Dining/ Kitchen / Pantry | Yes | 0% |
| Library / Art Room | Yes | 0% |
| Gym & Physiotherapy | No | Not applicable |
| Multipurpose Hall / Prefunction Lobby / Store | Yes | 0% |
| Nurse Station & Medical Room | No | Not applicable |
| GYM / PHYSIOTHERAPY | Yes | 0% |
| Nurse Station / Medical Room | Yes | 0% |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Brigade Enterprises Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 30.67 cr | Rs 1.46 cr |
| On-site expenditure-Site Overhead | Rs 1.71 cr | Rs 3.91 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 82.51 lakh | - |
| On-site expenditure-Salaries of workers | Rs 7.42 lakh | Rs 16,930 |
| On-site expenditure-Consultants Fees | Rs 2.98 lakh | Rs 6,790 |
| Payment of taxes | Rs 1.99 lakh | Rs 4,533 |
| Payment of Premiums | Rs 12,889 | Rs 294 |
| Payment of cess | Rs 11,357 | Rs 259 |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR. TILAK THOMAS -THOMAS ARCHITECTS |
| Engineer | Dr. H. G. Naikar - Pragathi Consultants |
| Chartered Accountant | R. Srinivasan |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1216 | Sr. Civil Judge Bangalore Rural | - |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed87
As listed on the registration, under the names the promoter filed them with; the newest 80 of 87 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180826/008875 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Azalea - Form 4 - Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Azalea at Brigade Meadows - Form 5 - Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Azalea - Form 6 - Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Land Cost Calculation SheetFile: Azalea - Land Cost Details.pdf | 17 Aug 2026 |
| Encumbrance CertificateFile: Latest EC.pdf | 12 Aug 2026 |
| Engineer Licence CertificateFile: Engineer License - Self Attested.pdf | 12 Aug 2026 |
| Affidavit - BESCOM NOCFile: Affidavit - BESCOM NOC.pdf | 12 Aug 2026 |
| Affidavit - Water NOCFile: Affidavit - Water NOC.pdf | 12 Aug 2026 |
| Amenities DetailsFile: Amenities Details.pdf | 12 Aug 2026 |
| Estimated Cost SheetFile: Azalea at Brigade Meadows - Estimated Cost.pdf | 12 Aug 2026 |
| Agreement to SellFile: Azalea at Brigade Meadows - Agreement to Sell.pdf | 12 Aug 2026 |
| Reply to the queriesFile: Azalea - Reply to the Queries.pdf | 12 Aug 2026 |
| RTC, survey 136 | - |
| Mutation, survey 136 | - |
| Encumbrance Certificate, survey 136 | - |
| Conversion/Alienation Order, survey 136 | - |
| Sale/Title/Gift Deed, survey 136 | - |
| Khatha, survey 136 | - |
| Registration CertificateFile: Certificate of Incorporation - BEL copy.pdf | - |
| Memorandum of AssociationFile: MOA and AOA - BEL.pdf | - |
| Article of AssociationFile: MOA and AOA - BEL.pdf | - |
| GST CertificateFile: BEL-GST Certificate.pdf | - |
| Organization StructureFile: Organogram.pdf | - |
| Certificate issued by CA Form 1File: Azalea at Brigade Meadows - Form 1.pdf | - |
| Certificate issued by Architect Form 2File: Azalea at Brigade Meadows - Form 2.pdf | - |
| Certificate issued by Engineer Form 3File: Azalea at Brigade Meadows - Form 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| Land Litigation Details | - |
| Land Litigation Details | - |
| Balance Sheet 2024 - 2025File: Balance Sheet - 2024-25.pdf | - |
| Balance Sheet 2023 - 2024File: Balance Sheet - 2023-24.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet - 2022-23 with CA UDIN.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: Profit and Loss - 2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss Account - 2023-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss - 2022-23 with CA UDIN.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: ITRV - 2024-25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITRV - 2023-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: BEL_ITR ack_FY 21-22.pdf | - |
| Director's Report 2024 - 2025File: Board's Report - 2024-25 - Compressed.pdf | - |
| Director's Report 2023 - 2024File: Board Report - 2023-24.pdf | - |
| Director's Report 2022 - 2023File: Directors Report - 2022-23.pdf | - |
| Cash Flow Statement 2024 - 2025File: Cash Flow Statement - 2024-25.pdf | - |
| Cash Flow Statement 2023 - 2024File: Cash Flow Statement - 2023-24.pdf | - |
| Auditor's Report 2024 - 2025File: Audit Report - 2024-25 - Compressed.pdf | - |
| Auditor's Report 2023 - 2024File: Auditor Report - 2023-24.pdf | - |
| Auditor's Report 2022 - 2023File: Auditors Report - 2022-23.pdf | - |
| Azalea at Brigade Meadows - Plan Sanction Letter | - |
| Site Plan | - |
| Section | - |
| Azalea at Brigade Meadows - Structural Safety Report | - |
| Azalea - Specifications | - |
| Azalea at Brigade Meadows - RERA Brochure1 | - |
| Modified Relinquishment Deed | - |
| Azalea at Brigade Meadows - Agreement to Sell | - |
| Azalea at Brigade Meadows - Proforma Allotment | - |
| Azalea at Brigade Meadows - Form B | - |
| Azalea at Brigade Meadows - Section 3 | - |
| Azalea at Brigade Meadows - Title Opinion | - |
| Brigade Meadows - BESCOM NOC | - |
| Azalea at Brigade Meadows - Water NOC | - |
| Azalea at Brigade Meadows - CFE | - |
| Azalea at Brigade Meadows - Fire NOC | - |
| Azalea at Brigade Meadows - AAI NOC | - |
| Site Plan | - |
| Lower Basement | - |
| Upper Basement | - |
| Ground Floor | - |
| First, Typical (2nd to 4th), Fifth & Terrace Floor1 | - |
| Elevation | - |
| Section1 | - |
| Azalea at Brigade Meadows - Litigation | - |
| CDP Plan | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Azalea at Brigade Meadows on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
AAROHANA ALTERRA
AAROHANA PROJECTS
Sri Sri Sattva
SRI SUMERU REALTY PRIVATE LIMITED
BREN AVAANA
BREN CORPORATION PRIVATE LIMITED
BREN ANANTA
BREN CORPORATION PRIVATE LIMITED
Primus Darpan
Ameliorate Realtors Private Limited
HASIRU VISTHARA
Hasiru Realty LLP
See every Bengaluru Urban project, with the district possession charts
Builder: Brigade Enterprises Limited
Brigade Enterprises Limited has 3 registrations on RERA Karnataka, including Azalea at Brigade Meadows and Brigade Horizon. Its filings disclose no earlier RERA Karnataka projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Azalea at Brigade Meadows is delayed beyond 31 Jul 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Azalea at Brigade Meadows?
The registered promoter entity is Brigade Enterprises Limited, a company as per the filing. Its CIN L85110KA1995PLC019126 and GSTIN 29AAACB7459F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Azalea at Brigade Meadows?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Azalea at Brigade Meadows?
The professionals named in the filing: Architect: MR. TILAK THOMAS -THOMAS ARCHITECTS; Engineer: Dr. H. G. Naikar - Pragathi Consultants; Chartered Accountant: R. Srinivasan. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Azalea at Brigade Meadows?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback