Home / Browse projects / Dharwad, Karnataka / Aum Mangal B wing

Registration approved No litigation declared Residential/Group Housing project

Aum Mangal B wing

By Nikhil Developers

RG-KA-92917 · RERA PRM/KA/RERA/1259/410/PR/010923/006210 · Last updated on RERA Karnataka portal: 16 Aug 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 115 documents Report an error

Aum Mangal B wing is a Residential/Group Housing project by Nikhil Developers in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/010923/006210 on 1 Sep 2023. Possession is promised by 20 Mar 2027.

At a glance

Project

  • NameAum Mangal B wing
  • TypeResidential/Group Housing
  • Location
    • Dharwad
    • 580021
  • Pincode580021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1259/410/PR/010923/006210
  • ReraGenie IDRG-KA-92917

Builder

  • NameNikhil Developers
  • Entity typePartnership Firm
  • GSTIN29AAMFN5991M1Z8
  • Authorized SignatorySadashiva P Devasur
  • Other registrations4 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredSep 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on1 Sep 2023
  • Promised completion20 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed115 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aum Mangal B wing---55055

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 16 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 16 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,019 sq m
Named landowners1
LandownerVillageDistrict
Durgaprasuna V Baburao--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.72 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 9.72 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Hulkoti
EngineerDarshan Devendra Choudhari
Chartered AccountantYogesh Devjibhai Nanda

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed115

As listed on the registration, under the names the promoter filed them with; the newest 80 of 115 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/010923/006210 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Clarification letter regarding old projects and OC final release order receivedFile: Technical Queries.pdf16 Aug 2023
Balance sheet 2019-20File: Balance sheet 19-20.pdf16 Aug 2023
Balance sheet 2020-21File: Balance sheet 20-21.pdf16 Aug 2023
Balance sheet 2021-22File: Balance sheet 21-22.pdf16 Aug 2023
P&L 19-20File: P&L 19-20.pdf16 Aug 2023
P&L 20-21File: P&L 20-21.pdf16 Aug 2023
P&L 21-22File: P&L 21-22.pdf16 Aug 2023
Single plotFile: single plot.pdf16 Aug 2023
CC clarificationFile: Commencement Certificate.pdf16 Aug 2023
EstimateFile: estimate.pdf16 Aug 2023
Borewell affidavitFile: Affidavit Borewell (1).pdf16 Aug 2023
Allotment letterFile: Allotment Letter (1) (1).pdf16 Aug 2023
Quarterly updatesFile: Technical Queries (1)(2)&(3) (1).pdf20 Jul 2023
Balance sheet with UDIN No 2019-20File: Bsheet 2019-20.pdf20 Jul 2023
Balance sheet with UDIN No 2020-21File: Bsheet 2020-21.pdf20 Jul 2023
Balance sheet with UDIN No 2021-22File: Bsheet 2021-22.pdf20 Jul 2023
Profit and loss account with UDIN No 2019-20File: P&L 2019-20.pdf20 Jul 2023
Profit and loss account with UDIN No 2020-21File: P&L 2020-21.pdf20 Jul 2023
Profit and loss account with UDIN No 2021-22File: P&L 2021-22.pdf20 Jul 2023
Car parking detailsFile: Relevant Document for Parking.pdf20 Jul 2023
Single plot layout and orderFile: Single plot layout.pdf20 Jul 2023
CDP map showing the proposed siteFile: CDP map showing the Proposed site.jpeg20 Jul 2023
Commencement certificate clarificationFile: Commencement Certificate Clarification.pdf20 Jul 2023
Brief estimated cost of constructionFile: ESTIMATE.pdf20 Jul 2023
Exclusive Common Area Unit DetailsFile: certified Carpet area calculation (1).pdf20 Jul 2023
Allotment LetterFile: Allotment Letter.pdf20 Jul 2023
Agreement for saleFile: f AOS Agreement of Sale.pdf20 Jul 2023
NOC of concerned water supply authorityFile: NOC Water Board B wing.pdf20 Jul 2023
Engineer certificateFile: ER LICENSE.pdf20 Jul 2023
Profit and loss account 2019-2020File: 2 PL 19-20.pdf6 Jun 2023
Profit and loss account 2020-2021File: 2 PL 20-21.pdf6 Jun 2023
Profit and loss account 2021-2022File: 2 PL 21-22.pdf6 Jun 2023
Balance sheet 2019-2020File: 1 BS 19-20.pdf6 Jun 2023
Balance sheet 2020-2021File: 1 BS 20-21.pdf6 Jun 2023
Balance sheet 2021-2022File: 1 BS 21-22.pdf6 Jun 2023
Title Deed name of Durga PrasadFile: Registered Document of Durga Prasana.pdf6 Jun 2023
EC from 01-04-2005 to upto dateFile: EC from 1-04-1988 to upto date.pdf6 Jun 2023
Height of the building clarificationFile: Building Height.pdf6 Jun 2023
Car parking detailsFile: Relevant Document for Parking.pdf6 Jun 2023
Single plot layout and orderFile: Single plot layout Order.pdf6 Jun 2023
certified carpet area calculationFile: certified Carpet area calculation.pdf6 Jun 2023
CDP map showing the proposed siteFile: CDP map showing the Proposed site.jpeg6 Jun 2023
Village map showing the proposed siteFile: Village map showing the praposed site.jpeg6 Jun 2023
Commencement certificate clarificationFile: Commencement Certificate.pdf6 Jun 2023
Brief estimated cost of constructionFile: ESTIMATE.pdf6 Jun 2023
Project Engineer License CertificateFile: Project Engineer license certificate on the project detail page.pdf6 Jun 2023
Project specification with addressFile: Speq.pdf6 Jun 2023
Allotment LetterFile: Allotment Letter.pdf6 Jun 2023
Agreement for saleFile: f AOS Agreement of Sale.pdf6 Jun 2023
STP design drawing and GuidelinesFile: STP Drwing and KSPCB Guidelines.pdf6 Jun 2023
NOC of concerned water supply authorityFile: water supply is shown in the uploaded letter.pdf6 Jun 2023
Title deed Sale deed Durga prasunaFile: JDA B Wing compressed.pdf1 May 2023
Single plot layout clarificationFile: Single plot layout clarification.pdf1 May 2023
Carpet area calculationFile: Aum Mangal B wing Aum Mangal B wing.xlsx1 May 2023
CDP MapFile: HUBLI CDP Map compressed.pdf1 May 2023
Commencement certificateFile: Commencement Certificate.pdf1 May 2023
Project Engineer License certificateFile: ENGINEER LICENSE.pdf1 May 2023
Signed copy of project specificationFile: Project specification signed copy.pdf1 May 2023
Water supply permission letterFile: NOC Water Board B wing.pdf1 May 2023
Building sanction planFile: Approved Building Plan.pdf1 May 2023
KSPCB NOCFile: NOC KSPCB B Wing.pdf1 May 2023
ECFile: EC 17 7 22 1 2.pdf1 May 2023
RTC, survey 489/1A/2-
Mutation, survey 489/1A/2-
Encumbrance Certificate, survey 489/1A/2-
Conversion/Alienation Order, survey 489/1A/2-
JDA, survey 489/1A/2-
Khatha, survey 489/1A/2-
Registration CertificateFile: Firm Registration certificate.pdf-
Partnership DeedFile: Reconstitution Deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: CA CERTIFICATE compressed.pdf-
Certificate issued by Architect Form 2File: ARCHITECT CERTIFICATE FORM 2.pdf-
Certificate issued by Engineer Form 3File: ENGINEER CERTIFICATE FORM 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Aum MangalAum shree Building plot no 25 akshya colony vidayanagar HubliOngoingMar 2026Not delivered
Aum shubhamaum shree building plot no 25 akshay colony vidyanagar hubliCompleted-No date filed

How this compares with Dharwad

29%of Dharwad projects moved their completion datethis one has not
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep Aum Mangal B wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

2 kmAum Mangal B wingOther 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Nikhil Developers

Nikhil Developers has 5 registrations on RERA Karnataka, including Aum Mangal B wing and Aum Shree Siddivinayaka Residency. Its filings declare 4 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if Aum Mangal B wing is delayed beyond 20 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Aum Mangal B wing?

The registered promoter entity is Nikhil Developers, a partnership firm as per the filing. Its GSTIN 29AAMFN5991M1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Aum Mangal B wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Aum Mangal B wing?

The professionals named in the filing: Architect: Sandeep Hulkoti; Engineer: Darshan Devendra Choudhari; Chartered Accountant: Yogesh Devjibhai Nanda. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aum Mangal B wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aum Mangal B wing. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aum Mangal B wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.