Home / Browse projects / Bengaluru Urban, Karnataka / Aston Park @ The Prestige City
Aston Park @ The Prestige City
By PRESTIGE PROJECTS PRIVATE LIMITED
RG-KA-80736 · RERA PRM/KA/RERA/1251/308/PR/080323/005778 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Aston Park @ The Prestige City is a Residential/Group Housing project by PRESTIGE PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/080323/005778 on 8 Mar 2023. Possession is promised by 14 Sep 2026. 701 of the 701 units on this registration are recorded sold or booked, and 6 of 18 construction stages are filed complete.
At a glance
Project
- NameAston Park @ The Prestige City
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 562125
- Pincode562125
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/080323/005778
- ReraGenie IDRG-KA-80736
Builder
- NamePRESTIGE PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU45201KA2008PTC046784
- GSTIN29AAECP7361E1Z9
- Authorized SignatorySwaroop Anish
- CmdIrfan Razack
- DirectorsBadrunissa Irfan, Almas Rezwan, Sameera Noaman
- Project HeadPalleti Venkata Chandra Shekar Reddy
- Other registrations11 more →
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on8 Mar 2023
- Promised completion14 Sep 2026
- Revised completionNone
- Buildings5 building records
- Documents filed161 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower - 1 | - | - | - | 135 | 0 | 135 |
| Tower - 2 | - | - | - | 133 | 0 | 133 |
| Tower - 3 | - | - | - | 150 | 0 | 150 |
| Tower - 4 | - | - | - | 128 | 0 | 128 |
| Tower - 5 | - | - | - | 155 | 0 | 155 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 18 construction stages are filed complete. The stage furthest along is Dadoing, at 95%.
Building: 84% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 90% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 90% |
| Plastering inside , outside & Ceiling | 90% |
| Joinery: Doors, Windows, Ventilators etc | 80% |
| Basic work of Water supply, Sanitary and Electrification | 70% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 95% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 50% |
| Painting | 30% |
| Fire prevention and fire fighting fitting and fixture with network | 80% |
| Weather Proof work(tile,concrete) | 90% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 70% |
| Internal and External work including landscapes as per sanctioned drawings | 75% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 70% |
| Sewage and Drainage System | Yes | 70% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 75% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Solid waste management and disposal | Yes | 70% |
| Emergency Evacuation services | Yes | 70% |
| Internal Roads & Footpaths | Yes | 75% |
| Electricity supply transformer and substation | Yes | 95% |
| Storm water drains | Yes | 75% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 70% |
| Parks & Tree planting | Yes | 40% |
| Street Lighting | Yes | 70% |
| Electricity | Yes | 60% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 25% |
| Club House | Yes | 70% |
| Community Hall | Yes | 50% |
| Outdoor Sports facility | Yes | 70% |
| Indoor Sports facility | Yes | 70% |
| Swimming Pool | Yes | 70% |
| Gym | Yes | 50% |
| Parks | Yes | 50% |
| Power Backup | Yes | 25% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 25% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 75% |
| Lifts | Yes | 75% |
| Corridor/Lobbies | Yes | 75% |
| Fire escapes | Yes | 60% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 65% |
| Basement | Yes | 80% |
| Terrace | Yes | 90% |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 40% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 75% |
| Common storage spaces | No | Not applicable |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Prestige Projects Private Limited | - | - |
| Prestige Projects Private Limited | - | - |
| Prestige Projects Private Limited | - | - |
| Prestige Projects Private Limited | - | - |
| Prestige Projects Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 441.44 cr | Rs 354.97 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 61.75 cr | Rs 37.57 cr |
| On-site expenditure-Consultants Fees | - | Rs 47.41 cr |
| On-site expenditure-Site Overhead | - | Rs 67.82 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | - | Rs 55.43 cr |
| Payment of taxes | - | Rs 51.46 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RSP Design Consultants (India) Pvt Ltd |
| Engineer | Design Tree Service Consultants |
| Chartered Accountant | M Padmanabha Bhat |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed161
As listed on the registration, under the names the promoter filed them with; the newest 80 of 161 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/080323/005778 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q2 2026-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q2 2026-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q2 2026-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q1 2026-27 Aston Park.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q1 2026-27 Aston Park.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q1 2026-27 Aston Park.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q4 Aston park.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Q4 Aston park.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q4 Aston park.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q3 Aston Park.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Q3 Aston Park.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q3 Aston Park.pdf | 15 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 15 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 15 Jan 2026 |
| Q3 2025-26 Fire and Safety | 15 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 15 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 15 Jan 2026 |
| Financial Statements with Schedules FY 2019-20File: PPPL FS FY 19-20.pdf | 2 Mar 2023 |
| Financial Statements with Schedules FY 2020-21File: PPPL FS FY 20-21.pdf | 2 Mar 2023 |
| Financial Statements with Schedules FY 2021-22File: PPPL FS FY 21-22.pdf | 2 Mar 2023 |
| Aston Park Legal opinionFile: Aston Park_LO.pdf | 22 Feb 2023 |
| OM-31/1File: ALN 44-2019-20_26-29-2-37-31-1-31-2-36-38-2.pdf | 22 Feb 2023 |
| OM-32-1 AND 32-2File: ALN 101-2016-17_32-1-32-2.pdf | 22 Feb 2023 |
| OM 32-2 AND 32/5File: ALN 103-2016-17_32-2 New 32-5.pdf | 22 Feb 2023 |
| OM-32-3File: 4 ALN 121-2009-10_32-3.pdf | 22 Feb 2023 |
| MOA AOA COA-CHANGE OF NAME FROM RR TO PPPLFile: CIN, MoA and AoA.pdf | 22 Feb 2023 |
| HISSA TIPPANIFile: Hissa Tippani.pdf | 22 Feb 2023 |
| AKARBANDFile: Akarband.pdf | 22 Feb 2023 |
| GUIDELINE VALUEFile: Guideline Value.pdf | 22 Feb 2023 |
| ENGINEER CERTIFICATE-CORRECTEDFile: Aston park-Form-03.pdf | 22 Feb 2023 |
| STRUCTURAL SAFTEYFile: Structural Safety Certificate.pdf | 22 Feb 2023 |
| ASTON PARK IS COLOURED IN PALE GREEN COLOURFile: Phasing plan.pdf | 22 Feb 2023 |
| LAND BIFURCATION FOR PROJECT IS ATTACHEDFile: Land parcel bifurcation.pdf | 22 Feb 2023 |
| BESCOM nocFile: BESCOM NOC-3-4.pdf | 22 Feb 2023 |
| BESCOM RECEIPTFile: 045-Apartment NOC receipts.pdf | 22 Feb 2023 |
| BWSSB/PANCHAYATH NOCFile: water panchayath.pdf | 22 Feb 2023 |
| Fire NOCFile: FIRE NOC.pdf | 22 Feb 2023 |
| Airport NOCFile: Airport.pdf | 22 Feb 2023 |
| SpecificationFile: Specification.pdf | 22 Feb 2023 |
| Area statement ofFile: ASTON PARK-RERA STATEMENT.pdf | 22 Feb 2023 |
| (1) AffidavitFile: 3-1 affidavit.pdf | 22 Feb 2023 |
| SpecificationFile: Specification.pdf | 22 Feb 2023 |
| STP design drawingFile: STP Location - Upper Basemet.pdf | 22 Feb 2023 |
| Allotment letterFile: Allotment Letter RERA.pdf | 22 Feb 2023 |
| Carpet Area caluclationFile: ASTON PARK-RERA STATEMENT.pdf | 22 Feb 2023 |
| CDP mapFile: TPC-CDP.pdf | 22 Feb 2023 |
| Village MapFile: Village Map.pdf | 22 Feb 2023 |
| Development planFile: DOP.pdf | 22 Feb 2023 |
| LicenceFile: THE PRESTIGE CITY - LICENCE.pdf | 22 Feb 2023 |
| 19th Floor planFile: Plan 19th Floor.pdf | 22 Feb 2023 |
| First Floor planFile: Plan First Floor.pdf | 22 Feb 2023 |
| Ground floor planFile: Plan Ground.pdf | 22 Feb 2023 |
| Typical floor planFile: Plan secnd and typical.pdf | 22 Feb 2023 |
| Section and ElevationFile: Plan Section and Elevation.pdf | 22 Feb 2023 |
| Terrace floor planFile: Plan Terrace.pdf | 22 Feb 2023 |
| Lower Basement planFile: Plan-Lower Basement.pdf | 22 Feb 2023 |
| Upper Basement planFile: Plan-Upper basement.pdf | 22 Feb 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Aspen Greens @ The Prestige City | The Prestige City, near Yamare Panchayath Office, V.K.Halli and Ittangur Village, Sarjapura Hobli, Anekal Taluk, | Ongoing | Oct 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Aston Park @ The Prestige City on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 72 registered projects within 2 km.
Nambiar District 25 Phase 3
Nambiar EnsembleResidential Projects LLP
Meridian Park Phase II @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase I @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase III @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Nambiar District 25 Phase 2
Nambiar EnsembleResidential Projects LLP
SEVEN SARJAPUR
FORTUNE PRIMERO LLP
See every Bengaluru Urban project, with the district possession charts
Builder: PRESTIGE PROJECTS PRIVATE LIMITED
PRESTIGE PROJECTS PRIVATE LIMITED has 12 registrations on RERA Karnataka, including Aston Park @ The Prestige City and Garden Breeze @ The Prestige City. Its filings declare 6 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Aston Park @ The Prestige City is delayed beyond 14 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Aston Park @ The Prestige City?
The registered promoter entity is PRESTIGE PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45201KA2008PTC046784 and GSTIN 29AAECP7361E1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Aston Park @ The Prestige City?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Aston Park @ The Prestige City?
The professionals named in the filing: Architect: RSP Design Consultants (India) Pvt Ltd; Engineer: Design Tree Service Consultants; Chartered Accountant: M Padmanabha Bhat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aston Park @ The Prestige City?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.