Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Assetz Naru & Nami Phase 1 is a Residential/Group Housing project by APG PROJECTS PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/081026/009004 on 8 Oct 2026. Possession is promised by 31 Jan 2032.
At a glance
Project
- NameAssetz Naru & Nami Phase 1
- TypeResidential/Group Housing
- Location
- Hosakote
- Bengaluru Rural
- 562114
- Pincode562114
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1250/304/PR/081026/009004
- ReraGenie IDRG-KA-51343
Builder
- NameAPG PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU68100KA2025PTC203050
- GSTIN29ABCCA9452E1ZK
- Authorized SignatoryNakul Dharmawat
- CeoAkshay Kishore Dewani
- DirectorsSunil Kumar Pareek, Sanjay Sudhakar Torgal
- Project HeadNandakumar P S
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on8 Oct 2026
- Promised completion31 Jan 2032
- Revised completionNone
- Buildings2 building records
- Documents filed163 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower B | - | - | - | 256 | 0 | 256 |
| Tower C | - | - | - | 256 | 0 | 256 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 7 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 7 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| APG PROJECTS PRIVATE LIMITED | - | - |
| APG PROJECTS PRIVATE LIMITED | - | - |
| Vanshee builders and developers private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 337.48 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 38.41 cr | - |
| On-site expenditure-Site Overhead | Rs 24.37 cr | - |
| Approval | Rs 23.59 cr | - |
| On-site expenditure-Consultants Fees | Rs 5.55 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SWETHA SATISH |
| Engineer | Rajesh Shirakol |
| Chartered Accountant | Shyam Prasad Shetty |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed163
As listed on the registration, under the names the promoter filed them with; the newest 80 of 163 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/081026/009004 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| JD AffidavitFile: JD-Affidavit.pdf | 7 Oct 2026 |
| Form BFile: Form B.pdf | 7 Oct 2026 |
| Audited Balance Sheet 2025-26File: Audited Balance Sheet 2025-26.pdf | 7 Oct 2026 |
| Audited Profit & Loss account 2025-26File: Audited Profit & Loss account 2025-26.pdf | 7 Oct 2026 |
| Audited Cash Flow 2025-26File: Audited Cash Flow 2025-26.pdf | 7 Oct 2026 |
| Audit Report 2025-26File: Audit Report 2025-26.pdf | 7 Oct 2026 |
| Schedule to balance sheet 2025-26File: Schedule to balance sheet 2025-26.pdf | 7 Oct 2026 |
| ITR AcknowledgementFile: ITR Acknowledgement.pdf | 7 Oct 2026 |
| Sources of fund with Supporting DocumentsFile: Sources of fund with Supporting Docuemnts.pdf | 7 Oct 2026 |
| Plan Sanction Licence CertificateFile: Plan Sanction Licence Certificate.pdf | 7 Oct 2026 |
| Site Plan DetailsFile: 1 Site Plan Details.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block Basement 2File: 2 Tower A Amenity Retail Block Basement 2.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block Basement 1File: 3 Tower A Amenity Retail Block Basement 1.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block Ground Floor PlanFile: 4 Tower A Amenity Retail Block Ground Floor Plan.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block 1st Floor PlanFile: 5 Tower A Amenity Retail Block 1st Floor Plan.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block 2nd Floor PlanFile: 6 Tower A Amenity Retail Block 2nd Floor Plan.pdf | 7 Oct 2026 |
| Tower A 3rd Floor Plan Amenity & Retail block terrace floorFile: 7 Tower A 3rd Floor Plan Amenity & Retail block terrace floor.pdf | 7 Oct 2026 |
| Tower A Terrace Floor PlanFile: 8 Tower A Terrace Floor Plan.pdf | 7 Oct 2026 |
| Tower B & C Basement-02File: 9 Tower B & C Basement-02.pdf | 7 Oct 2026 |
| Tower B & C Basement-01File: 10 Tower B & C Basement-01.pdf | 7 Oct 2026 |
| Tower B & Tower C Ground Floor PlanFile: 11 Tower B & Tower C Ground Floor Plan.pdf | 7 Oct 2026 |
| Tower B & Tower C 1st Floor PlanFile: 12 Tower B & Tower C 1st Floor Plan.pdf | 7 Oct 2026 |
| Tower B & Tower C 2nd Floor PlanFile: 13 Tower B & Tower C 2nd Floor Plan.pdf | 7 Oct 2026 |
| Tower B & Tower C Typical Floor PlanFile: 14 Tower B & Tower C Typical Floor Plan.pdf | 7 Oct 2026 |
| Tower B & Tower C Refuge Floor Plan - 18th & 28th FloorFile: 15 Tower B & Tower C Refuge Floor Plan - 18th & 28th Floor.pdf | 7 Oct 2026 |
| Tower B & Tower C Terrace Floor PlanFile: 16 Tower B & Tower C Terrace Floor Plan.pdf | 7 Oct 2026 |
| Elevation of Tower - AFile: 17 Elevation of Tower - A.pdf | 7 Oct 2026 |
| Tower B & Tower C ElevationFile: 18 Tower B & Tower C Elevation.pdf | 7 Oct 2026 |
| Section of Tower -AFile: 19 Section of Tower -A.pdf | 7 Oct 2026 |
| Tower B & Tower C SectionFile: 20 Tower B & Tower C Section.pdf | 7 Oct 2026 |
| Commencement CertificateFile: Commencement Certificate.pdf | 7 Oct 2026 |
| Clarification regarding KSPCB NOCFile: Clarification regarding KSPCB NOC.pdf | 7 Oct 2026 |
| Approved Building PlanFile: Approved Building Plan.pdf | 7 Oct 2026 |
| Agreement to saleFile: Agreement of Sale 07-10-2026.pdf | 7 Oct 2026 |
| Allotement letterFile: Allotement letter.pdf | 7 Oct 2026 |
| Site Plan DetailsFile: 1 Site Plan Details.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block Basement 2File: 2 Tower A Amenity Retail Block Basement 2.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block Basement 1File: 3 Tower A Amenity Retail Block Basement 1.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block Ground Floor PlanFile: 4 Tower A Amenity Retail Block Ground Floor Plan.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block 1st Floor PlanFile: 5 Tower A Amenity Retail Block 1st Floor Plan.pdf | 7 Oct 2026 |
| Tower A Amenity Retail Block 2nd Floor PlanFile: 6 Tower A Amenity Retail Block 2nd Floor Plan.pdf | 7 Oct 2026 |
| Tower A 3rd Floor Plan Amenity & Retail block terrace floorFile: 7 Tower A 3rd Floor Plan Amenity & Retail block terrace floor.pdf | 7 Oct 2026 |
| Tower A Terrace Floor PlanFile: 8 Tower A Terrace Floor Plan.pdf | 7 Oct 2026 |
| Tower B & C Basement-02File: 9 Tower B & C Basement-02.pdf | 7 Oct 2026 |
| Tower B & C Basement-01File: 10 Tower B & C Basement-01.pdf | 7 Oct 2026 |
| Tower B & Tower C Ground Floor PlanFile: 11 Tower B & Tower C Ground Floor Plan.pdf | 7 Oct 2026 |
| Tower B & Tower C 1st Floor PlanFile: 12 Tower B & Tower C 1st Floor Plan.pdf | 7 Oct 2026 |
| Tower B & Tower C 2nd Floor PlanFile: 13 Tower B & Tower C 2nd Floor Plan.pdf | 7 Oct 2026 |
| Tower B & Tower C Typical Floor PlanFile: 14 Tower B & Tower C Typical Floor Plan.pdf | 7 Oct 2026 |
| Tower B & Tower C Refuge Floor Plan - 18th & 28th FloorFile: 15 Tower B & Tower C Refuge Floor Plan - 18th & 28th Floor.pdf | 7 Oct 2026 |
| Tower B & Tower C Terrace Floor PlanFile: 16 Tower B & Tower C Terrace Floor Plan.pdf | 7 Oct 2026 |
| Elevation of Tower - AFile: 17 Elevation of Tower - A.pdf | 7 Oct 2026 |
| Tower B & Tower C ElevationFile: 18 Tower B & Tower C Elevation.pdf | 7 Oct 2026 |
| Section of Tower -AFile: 19 Section of Tower -A.pdf | 7 Oct 2026 |
| Tower B & Tower C SectionFile: 20 Tower B & Tower C Section.pdf | 7 Oct 2026 |
| Affidavit for water assuranceFile: Affidavit for water assurance.pdf | 7 Oct 2026 |
| Gram Panchayat Letter for WaterFile: Gram Panchayat Letter for Water.pdf | 7 Oct 2026 |
| Demarcation DrawingFile: Demarcation Drawing.pdf | 7 Oct 2026 |
| BrochureFile: Naru & Nami RERA Brochure.pdf | 7 Oct 2026 |
| Details of facilities & Amenties ProvidedFile: Deatails of facilities & Amenties Provided.pdf | 7 Oct 2026 |
| Annexure 1-Audit Report 2025-26File: Annexure 1-Audit Report 2025-26.pdf | 5 Aug 2026 |
| Audited Balance Sheet 2025-26File: Annexure 2-Audited Balance Sheet 2025-26.pdf | 5 Aug 2026 |
| Audited Profit & Loss account 2025-26File: Annexure 3-Audited Profit & Loss account 2025-26.pdf | 5 Aug 2026 |
| Audited Cash Flow 2025-26File: Annexure 4-Audited Cash Flow 2025-26.pdf | 5 Aug 2026 |
| Schedule to balance sheet 2025-26File: Annexure 5-Schedule to balance sheet 2025-26.pdf | 5 Aug 2026 |
| Development Order CopyFile: Annexure 7-Development Order Copy.pdf | 5 Aug 2026 |
| Development Plan SanctionFile: Annexure 8-Development Plan Sanction.pdf | 5 Aug 2026 |
| SATELLITE_IMAGEFile: Annexure 9-SATELLITE_IMAGE.pdf | 5 Aug 2026 |
| Clarification regarding KSPCB NOCFile: Annexure 10-Clarification regarding KSPCB NOC.pdf | 5 Aug 2026 |
| Water Assurance affidavitFile: Annexure 11-Water Assurance affidavit.pdf | 5 Aug 2026 |
| Financial ClarificationFile: Annexure 1-Financial Clarification.pdf | 29 Jun 2026 |
| Form-3 Engineer CertificateFile: Annexure 2-Form-3 Engineer Certificate.pdf | 29 Jun 2026 |
| Sources of fund to comeplete the projectFile: Annexure 3-Sources of fund to comeplete the project.pdf | 29 Jun 2026 |
| Architect CertificateFile: Annexure 4-Architect Certificate.pdf | 29 Jun 2026 |
| Loan ClarificationFile: Annexure 5-Loan Clarification.pdf | 29 Jun 2026 |
| Khata - Sy No-142File: Annexure 6-Khata - Sy No-142.pdf | 29 Jun 2026 |
| Khata - Sy No-143File: Annexure 7-Khata - Sy No-143.pdf | 29 Jun 2026 |
| HOSKOTE ADLRFile: Annexure 8-HOSKOTE ADLR.pdf | 29 Jun 2026 |
| SATELLITE_IMAGEFile: Annexure 9-SATELLITE_IMAGE.pdf | 29 Jun 2026 |
| CDP MapFile: Annexure 10-CDP Map.pdf | 29 Jun 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.
Keep Assetz Naru & Nami Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural650+ in Bengaluru Rural
Filed coordinates, straight-line distance. 15 registered projects within 2 km.
Provident Botanico
Provident Housing Limited
GODREJ PARKSHIRE
Godrej Properties Limited
Sowparnika The Native
SOWPARNIKA HOMES PRIVATE LIMITED
SOWPARNIKA EUPHORIA IN THE EAST
SOWPARNIKA HOMES PRIVATE LIMITED
Brillio and Commercial at Brigade Valencia
Brigade Enterprises Ltd
Sowparnika Whispering Petals
SOWPARNIKA GREEN MEADOWS PRIVATE LIMITED
See every Bengaluru Rural project, with the district possession charts
Builder: APG PROJECTS PRIVATE LIMITED
APG PROJECTS PRIVATE LIMITED has 1 registration on RERA Karnataka, including Assetz Naru & Nami Phase 1. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if Assetz Naru & Nami Phase 1 is delayed beyond 31 Jan 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Assetz Naru & Nami Phase 1?
The registered promoter entity is APG PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U68100KA2025PTC203050 and GSTIN 29ABCCA9452E1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Assetz Naru & Nami Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Assetz Naru & Nami Phase 1?
The professionals named in the filing: Architect: SWETHA SATISH; Engineer: Rajesh Shirakol; Chartered Accountant: Shyam Prasad Shetty. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Assetz Naru & Nami Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback