Home / Browse projects / Bengaluru Urban, Karnataka / Assetz 66 & Shibui
Assetz 66 & Shibui
By APG ENVIRONMENT HOMES PRIVATE LIMITED
RG-KA-52268 · RERA PRM/KA/RERA/1251/446/PR/300124/006601 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Assetz 66 & Shibui is a Residential/Group Housing project by APG ENVIRONMENT HOMES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/300124/006601 on 30 Jan 2024. Possession is promised by 30 Jun 2028. 77 of the 96 units on this registration are recorded sold or booked, and 5 of 18 construction stages are filed complete.
At a glance
Project
- NameAssetz 66 & Shibui
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560066
- Pincode560066
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/300124/006601
- ReraGenie IDRG-KA-52268
Builder
- NameAPG ENVIRONMENT HOMES PRIVATE LIMITED
- Entity typeCompany
- CINU45209KA2020PTC132787
- GSTIN29AATCA3202C1ZX
- Authorized SignatorySomasundaram Thiruppathi
- CeoAkshay Kishore Dewani
- DirectorsSomasundaram Thiruppathi, Jagannath Laxman Shetty, Akshay Kishore Dewani
- Project HeadNanda Kumar P S
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on30 Jan 2024
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings1 building record
- Documents filed174 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 102 | 0 | 102 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 18 construction stages are filed complete. The stage furthest along is Masonry construction: Bricks, at 90%.
Building: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 50% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 90% |
| Plastering inside , outside & Ceiling | 62% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 30% |
| Railing and Grill fixing | 30% |
| Electrification, Water supply and Sanitary Finishing | 35% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 20% |
| Weather Proof work(tile,concrete) | 0% |
| Painting | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per santioned drawings | 0% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 15% |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Water conservation | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning And incerntion | Yes | 0% |
| Staircases | Yes | 70% |
| Lifts | Yes | 50% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 70% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 60% |
| Terrace | Yes | 50% |
| Outer Wall | Yes | 50% |
| Open parking areas and common storage spaces | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| K S Giridhar | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 97.78 cr | Rs 42.88 cr |
| On-site expenditure-Site Overhead | Rs 9.61 cr | Rs 6.32 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 7.20 cr | Rs 8.00 cr |
| Approval | Rs 6.41 cr | Rs 2.70 cr |
| On-site expenditure-Consultants Fees | Rs 1.42 cr | Rs 82.10 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Meghna Srivastava |
| Engineer | B E Pruthviraja |
| Chartered Accountant | Y S Shetty & Company |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed174
As listed on the registration, under the names the promoter filed them with; the newest 80 of 174 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/300124/006601 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant -66 & Shibui.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) 66 & Shibui.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) 66 & Shibui.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant -66 & Shibui.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) 66 & Shibui.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) 66 & Shibui.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant -66 & Shibui.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) 66 & Shibui.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) 66 & Shibui.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant -66 & Shibui Q3 Finial.pdf | 31 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) 66 & Shibui.pdf | 31 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer Certificate 66 & Shibui.pdf | 31 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 31 Mar 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 31 Mar 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 31 Mar 2026 |
| Q3 2025-26 KPTCL- BESCOM | 31 Mar 2026 |
| Q3 2025-26 Fire and Safety | 31 Mar 2026 |
| Q3 2025-26 Airport Authority of India | 31 Mar 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 31 Mar 2026 |
| Quarterly UpdateFile: Annexure 1-Quarterly Update.pdf | 25 Jan 2024 |
| Annual Audit reportFile: Annexure 2-Annual Audit report.pdf | 25 Jan 2024 |
| Form 1 CA CertificateFile: Annexure 3-Form 1 CA Certificate.pdf | 25 Jan 2024 |
| Source of FundFile: Annexure 4-Source of Fund.pdf | 25 Jan 2024 |
| Financial 2020-21 with schedule & UDINFile: Annexure 5-Financial 2020-21 with schedule & UDIN.pdf | 25 Jan 2024 |
| Financial 2021-22 with schedules & UDINFile: Annexure 6-Financial 2021-22 with schedule and UDIN.pdf | 25 Jan 2024 |
| Financial 2022-23 with schedules & UDINFile: Annexure 7-Financial 2022-23 with schedule and UDIN.pdf | 25 Jan 2024 |
| Bank AffidavitFile: Annexure 8-Bank Affidavit.pdf | 25 Jan 2024 |
| MRFile: Annexure 9-MR.pdf | 25 Jan 2024 |
| Notirized Non-Litigation AffidavitFile: Annexure 10-Notirized Non-Litigation Affidavit.pdf | 25 Jan 2024 |
| Notirized Form BFile: Annexure 11-Notirized Form B.pdf | 25 Jan 2024 |
| Notirized JD affidavitFile: Annexure 12-Notirized JD affidavit.pdf | 25 Jan 2024 |
| Area detailsFile: Annexure 13-Area Details.pdf | 25 Jan 2024 |
| Site plan and All floors PlanFile: Annexure 14-Site plan and All floors Plan.pdf | 25 Jan 2024 |
| Building Licence OrderFile: Annexure 15-Building Licence Order.pdf | 25 Jan 2024 |
| CDP MapFile: Annexure 16-CDP Map.pdf | 25 Jan 2024 |
| Village MapFile: Annexure 17-Village Map.pdf | 25 Jan 2024 |
| Building LicenceFile: Annexure 18-Building Licence.pdf | 25 Jan 2024 |
| Architect CertificateFile: Annexure 19-Architect Certificate.pdf | 25 Jan 2024 |
| Site plan and All floors PlanFile: Annexure 20-Site plan and All floors Plan.pdf | 25 Jan 2024 |
| Certified Amenties and Common areasFile: Annexure 21-Certified Amenties and Common areas.pdf | 25 Jan 2024 |
| Self Attested EngineerFile: Annexure 22-Self Attested Engineer.pdf | 25 Jan 2024 |
| Engineer CertificateFile: Annexure 23-Engineer Certificate.pdf | 25 Jan 2024 |
| Allotment letterFile: Annexure 24-Allotment letter.pdf | 25 Jan 2024 |
| Notirized Affidavit of ViolationFile: Annexure 25-Notirized Affidavit of Violation.pdf | 25 Jan 2024 |
| Certified Project SpecificationsFile: Annexure 26-Certified Project Specifications.pdf | 25 Jan 2024 |
| BWSSB Payment Receipt and NOCFile: Annexure 27-BWSSB Payment Receipt and NOC.pdf | 25 Jan 2024 |
| BESCOME Payment receipt and NOCFile: Annexure 28-BESCOME Payment receipt and NOC.pdf | 25 Jan 2024 |
| STP DetailsFile: Annexure 29-STP Details.pdf | 25 Jan 2024 |
| Land Cost CalculationFile: Annexure 30-Land Cost Calculation.pdf | 25 Jan 2024 |
| RTC, survey 3/3 | - |
| Mutation, survey 3/3 | - |
| Encumbrance Certificate, survey 3/3 | - |
| Conversion/Alienation Order, survey 3/3 | - |
| Sale/Title/Gift Deed, survey 3/3 | - |
| JDA, survey 3/3 | - |
| Khatha, survey 3/3 | - |
| Registration CertificateFile: Annexure 1 - COI.PDF | - |
| Organization StructureFile: Annexure 11-Org Structure.pdf | - |
| Certificate issued by CA Form 1File: Form -4 Chartered Accountant -66 & Shibui Q2 2024-25.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Assetz 66 & Shibui on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 53 registered projects within 2 km.
SBR ONE RESIDENCE
SBR STRUCTURES
Cloud Forest
Shreno Limited
MAHINDRA BLOSSOM
MAHINDRA LIFESPACE DEVELOPERS LIMITED
SUMADHURA SOLACE PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
FOLIUM BY SUMADHURA PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA EDITION PHASE-I
SUMADHURA INFRACON PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: APG ENVIRONMENT HOMES PRIVATE LIMITED
APG ENVIRONMENT HOMES PRIVATE LIMITED has 1 registration on RERA Karnataka, including Assetz 66 & Shibui. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Assetz 66 & Shibui is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Assetz 66 & Shibui?
The registered promoter entity is APG ENVIRONMENT HOMES PRIVATE LIMITED, a company as per the filing. Its CIN U45209KA2020PTC132787 and GSTIN 29AATCA3202C1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Assetz 66 & Shibui?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Assetz 66 & Shibui?
The professionals named in the filing: Architect: Ar. Meghna Srivastava; Engineer: B E Pruthviraja; Chartered Accountant: Y S Shetty & Company. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Assetz 66 & Shibui?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback