Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
ASHIRVAD is a Residential/Group Housing project by UDUPI AASHEERVAAD DEVELOPERS in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/091123/006398 on 9 Nov 2023. Possession is promised by 31 Dec 2027. 0 of the 13 units on this registration are recorded sold or booked, and 6 of 14 construction stages are filed complete.
At a glance
Project
- NameASHIRVAD
- TypeResidential/Group Housing
- Location
- Udupi
- 576104
- Pincode576104
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1273/318/PR/091123/006398
- ReraGenie IDRG-KA-92074
Builder
- NameUDUPI AASHEERVAAD DEVELOPERS
- Entity typePartnership Firm
- GSTIN29AAHFU6981B1ZT
- Authorized SignatoryVIDYA V KAMATH
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on9 Nov 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed91 files
Current status
Figures as on 15 Jul 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ASHIRVAD | - | - | - | 13 | 0 | 13 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 14 construction stages are filed complete. The stage furthest along is Masonry Construction, at 95%.
Building: 67% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 95% |
| Plastering inside , outside & Ceiling | 78% |
| Joinery: Doors, Windows, Ventilators etc | 50% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 35% |
| Railing and Grill fixing | 30% |
| Electrification, Water supply and Sanitary Finishing | 48% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 50% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 35% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 25% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 50% |
| Storm water drains | Yes | 25% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 50% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 35% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 73% |
| Lifts | Yes | 30% |
| Corridor/Lobbies | Yes | 40% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 85% |
| Terrace | Yes | 40% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| UDUPI AASHEERVAAD DEVELOPERS | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 3.14 cr | Rs 1.37 cr |
| - | NA | - | Rs 17.80 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHALINI SURESH |
| Engineer | SHRIDHAR ACHARYA |
| Chartered Accountant | KAVITHA M PAI |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed91
As listed on the registration, under the names the promoter filed them with; the newest 80 of 91 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/091123/006398 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: UAD RR FORM 4 30-06-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: architect certificate.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer certificate.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: UAD FORM 4 Q4.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: architect certificate.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: ENGINEER.pdf | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: UAD RERA REPORT OF FORM 4 QUARTER ENDING 31-12-2025.pdf | 17 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: architect certificate.pdf | 17 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: engineer certificate.pdf | 17 Jan 2026 |
| form 1 with UDINFile: RERA Form 1 CA.pdf | 7 Nov 2023 |
| SOURCE OF FUNDFile: source of fund.pdf | 7 Nov 2023 |
| EC 1972 TO 2023File: EC 1972-2023.jpeg | 7 Nov 2023 |
| EC 2007-2023File: EC 2007-2023.pdf | 7 Nov 2023 |
| MR COPYFile: MR.pdf | 7 Nov 2023 |
| MRFile: MR COPY.pdf | 7 Nov 2023 |
| PARTNERSHIP DEED SUPPLEMENTFile: SUPPLIMENT DEED - UDUPI ASHERVAD DEVELOPERS NEW .pdf | 7 Nov 2023 |
| CLARIFICATIONFile: clarification.pdf | 7 Nov 2023 |
| RTC, survey 106/22 | - |
| Mutation, survey 106/22 | - |
| Encumbrance Certificate, survey 106/22 | - |
| Conversion/Alienation Order, survey 106/22 | - |
| Sale/Title/Gift Deed, survey 106/22 | - |
| Khatha, survey 106/22 | - |
| Registration CertificateFile: Firm Registration.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: RERA Form 1 CA.pdf | - |
| Certificate issued by Architect Form 2File: architect final.pdf | - |
| Certificate issued by Engineer Form 3File: Form - 3, Engineer (PR) (1).pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: litigation affidavit.pdf | - |
| Certificate from Chartered AccountFile: RERA Form 1 CA.pdf | - |
| Balance Sheet 2022 - 2023File: provisional balance sheet.pdf | - |
| license approval | - |
| approved plan | - |
| Single layout | - |
| approved plan | - |
| approved plan | - |
| approved plan | - |
| specification | - |
| Single layout | - |
| Single layout | - |
| stabilty certificate | - |
| search report | - |
| title deed | - |
| conversion oder_compressed | - |
| conversion oder_compressed | - |
| title 1 patition deed 1972 | - |
| proforma AOS | - |
| proforma allotment letter | - |
| broucher | - |
| form b_compressed | - |
| affidavit 3(1) | - |
| mescom noc | - |
| water noc | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| dana patra_compressed | - |
| Signed Cost Estimation | - |
| extarct of parnership deed | - |
| guidance value | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Udupi
Computed across the 260+ Udupi projects on ReraGenie, from their own filings.
Keep ASHIRVAD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Udupi260+ in Udupi
Filed coordinates, straight-line distance. 50 registered projects within 2 km.
GRASSLANDS - LAKESIDE
GRAZLANZ PROPERTIES LLP
BHAVANI PEARL STONE
BHAVANI BUILDERS & DEVELOPERS
ARCHANA GRAND KANAK
ARCHANA PROJECTS
HI POINT ROYAL
HI POINT CONSTRUCTIONS PRIVATE LIMITED
BHAVANI HESSONITE
BHAVANI BUILDERS
MANDAVI DOWNTOWN
MANDAVI CONSTRUCTIONS
See every Udupi project, with the district possession charts
Builder: UDUPI AASHEERVAAD DEVELOPERS
UDUPI AASHEERVAAD DEVELOPERS has 1 registration on RERA Karnataka, including ASHIRVAD. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.
Frequently asked questions
What are my rights if ASHIRVAD is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ASHIRVAD?
The registered promoter entity is UDUPI AASHEERVAAD DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AAHFU6981B1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ASHIRVAD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ASHIRVAD?
The professionals named in the filing: Architect: SHALINI SURESH; Engineer: SHRIDHAR ACHARYA; Chartered Accountant: KAVITHA M PAI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ASHIRVAD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback