Home / Browse projects / Bengaluru Urban, Karnataka / Aratt Avant Twilight
Aratt Avant Twilight
By ARATTUKULAM INFRASTRUCTURE CONSTRUCTIONS PRIVATE LIMITED
RG-KA-82148 · RERA PRM/KA/RERA/1251/446/PR/181223/006492 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Aratt Avant Twilight is a Residential/Group Housing project by ARATTUKULAM INFRASTRUCTURE CONSTRUCTIONS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/181223/006492 on 18 Dec 2023. Possession is promised by 30 Oct 2027. 136 of the 162 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameAratt Avant Twilight
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560049
- Pincode560049
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/181223/006492
- ReraGenie IDRG-KA-82148
Builder
- NameARATTUKULAM INFRASTRUCTURE CONSTRUCTIONS PRIVATE LIMITED
- Entity typeCompany
- CINU70102KA2008PTC048065
- GSTIN29AAHCA5939Q1ZS
- Authorized SignatoryVISHAL VINCENT TONY
- CeoVISHAL VINCENT TONY
- DirectorsTony Vincent, Vishal Vincent Tony
- Project HeadVishal Vincent Tony
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Dec 2023
- Promised completion30 Oct 2027
- Revised completionNone
- Buildings2 building records
- Documents filed226 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Aratt Avant Twlight One | - | - | - | 162 | 0 | 162 |
| Aratt Avant Twilight Two | - | - | - | 93 | 0 | 93 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 95%.
Building: 58% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 95% |
| Foundation footing work | 85% |
| Upto Plinth Level | 75% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 75% |
| Retaining wall (All types) | 65% |
| RCC or MS Framed structure | 90% |
| Masonry Construction | 80% |
| Plastering inside , outside & Ceiling | 80% |
| Joinery: Doors, Windows, Ventilators etc | 50% |
| Basic work of Water supply, Sanitary and Electrification | 30% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 30% |
| Railing and Grill fixing | 40% |
| Electrification, Water supply and Sanitary Finishing | 40% |
| Painting | 60% |
| Fire prevention and fire fighting fitting and fixture with network | 40% |
| Weather Proof work(tile,concrete) | 30% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 40% |
| Internal and External work including landscapes as per sanctioned drawings | 30% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 20% |
| Sewage and Drainage System | Yes | 20% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 20% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 20% |
| Solid waste management and disposal | Yes | 20% |
| Emergency Evacuation services | Yes | 20% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 10% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 10% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 10% |
| Electricity | Yes | 10% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 10% |
| Club House | Yes | 10% |
| Community Hall | Yes | 10% |
| Outdoor Sports facility | Yes | 10% |
| Indoor Sports facility | Yes | 10% |
| Swimming Pool | Yes | 10% |
| Gym | Yes | 10% |
| Parks | Yes | 10% |
| Power Backup | Yes | 10% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 10% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 10% |
| Lifts | Yes | 10% |
| Corridor/Lobbies | Yes | 10% |
| Fire escapes | Yes | 10% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 10% |
| Basement | Yes | 10% |
| Terrace | Yes | 10% |
| Outer Wall | Yes | 10% |
| Open parking areas | Yes | 10% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 10% |
| Common storage spaces | No | Not applicable |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Arattukulam Infrastructure Constructions Private Limited | - | - |
| Arattukulam Infrastructure Constructions Private Limited | - | - |
| Arattukulam Infrastructure Constructions Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 55.61 cr | Rs 13.87 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 9.21 cr | Rs 3.44 lakh |
| On-site expenditure-Site Overhead | Rs 7.63 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.36 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Design Desk |
| Engineer | RADINS ENGINEERS LLP |
| Chartered Accountant | Krishnamurthy B |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed226
As listed on the registration, under the names the promoter filed them with; the newest 80 of 226 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/181223/006492 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4_Twilight_Phase II_Q2 FY 2026-27_Signed_compressed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: AVANT PHASE-2-FORM-5 Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: AVANT PHASE-2-FORM -6 Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: AvantTwilighPhase-2_Form4_Q1_FY2026-27_.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Aratt Twilight_Phase 2_Form 5_Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: AVANT PHASE-II-FORM -6 Q1-1.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4_Twilight_Phase II_Q4 FY 2025-26__.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: AVANT PHASE-2-FORM -5 Q4.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: RE LH- FORM6 MARCH 2026 TWILIGHT PHASE II.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q4 2025-26 Fire and Safety | 14 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 14 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM-04_compressed.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: AVANT PHASE-2-FORM -5 Q3.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: RE LH- FORM6 DEC 2025 TWILIGHT PHASE II.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 14 Jan 2026 |
| Engineer License CertificateFile: RKS degree certificate .pdf | 13 Dec 2023 |
| Sale agreement formatFile: Aratt Avant Twilight - ATS -Phase-2.pdf | 13 Dec 2023 |
| Allotment letterFile: Allotment Letter_Format.pdf | 13 Dec 2023 |
| Hissa Podhi DocumentsFile: Hissa Podhi.pdf | 13 Dec 2023 |
| Area details the projectFile: Area Calculation sheet.pdf | 18 Nov 2023 |
| Break up of types of UnitsFile: Screenshot 2023-11-18 153253.png | 18 Nov 2023 |
| FAR As per the sanction PlanFile: FAR_Phase II.png | 18 Nov 2023 |
| Built up area Mentioned in the projectFile: FAR_Phase II.png | 18 Nov 2023 |
| Height of the buildingFile: FAR_Phase II.png | 18 Nov 2023 |
| Number of parking mentionedFile: FAR_Phase II.png | 18 Nov 2023 |
| Single plot layout OrderFile: single plot approval 2a 13_5g.pdf | 18 Nov 2023 |
| CDP map showing the proposed siteFile: CDP Map showing the proposed site.pdf | 18 Nov 2023 |
| Village map showing the proposed siteFile: Village map showing the proposed site.pdf | 18 Nov 2023 |
| Commencement certificate.File: Commencement certificate_Phase II.pdf | 18 Nov 2023 |
| Number of units in the KSPCB NOCFile: Arattukulam_171 flats_CTE_phase II.pdf | 18 Nov 2023 |
| Building LicenseFile: Building license-6-10.pdf | 18 Nov 2023 |
| clear and legible sanctioned drawings Floor plansFile: 01-5-8_compressed.pdf | 18 Nov 2023 |
| Number of units in the SEIAA NOCFile: enviornment noc.pdf | 18 Nov 2023 |
| Phasewise demarcation drawing.File: Demarcation Drawing-Tower 1 and 2.pdf | 18 Nov 2023 |
| 2(a). What are all the sources of funds to complete the project? With supporting documents.File: ICICI Loan Sanction Letter.pdf | 25 Oct 2023 |
| 2(b). MR DocumentFile: 2(b) Mrdocument.pdf | 25 Oct 2023 |
| 2(c) Sources of Funds_SummaryFile: 2(c) Sources of Funds_Summary.pdf | 25 Oct 2023 |
| 1) Area details the project details page not matching with the Approved PlanFile: 1 Aratt Avant_Layout Plan.pdf | 25 Oct 2023 |
| 2) Break up of types of Units (BHKwise) Not updated.(Not updated as per the sanction plan)File: 2 BHK Wise summary.pdf | 25 Oct 2023 |
| 3(a) FAR As per the sanction Plan is Not Matching with the details EnteredFile: 3(a) screenshot of Plan_Block 2.png | 25 Oct 2023 |
| 3(b) FAR As per the sanction Plan is Not Matching with the details EnteredFile: 3(b) screenshot of Plan_Block 1.png | 25 Oct 2023 |
| 4(a) Built up area Mentioned in the project details Page not matching with the sanction plan.File: 4(a) screenshot of Plan_Block 2.png | 25 Oct 2023 |
| 4(b) Built up area Mentioned in the project details Page not matching with the sanction plan.File: 4(b) screenshot of Plan_Block 1.png | 25 Oct 2023 |
| 5(a) Height of building mentioned in the development details page is not matching with the sanctioFile: 5(a) screenshot of Plan_Block 2.png | 25 Oct 2023 |
| 5(b) Height of building mentioned in the development details page is not matching with the sanctioFile: 5(b) screenshot of Plan_Block 1.png | 25 Oct 2023 |
| 6(a) Number of parking mentioned in the project details page not matching with the sanction planFile: 6(a) screenshot of Plan_Block 2.png | 25 Oct 2023 |
| 6(b) Number of parking mentioned in the project details page not matching with the sanction planFile: 6(b) screenshot of Plan_Block 1.png | 25 Oct 2023 |
| 7(a) Upload Single plot layout OrderFile: single plot approval 1a 12g.pdf | 25 Oct 2023 |
| 7(b) Upload Single plot layout OrderFile: single plot approval 2a 13_5g.pdf | 25 Oct 2023 |
| 8) Upload CDP map showing the proposed site.(Not clear)File: 8 CDP Map showing the proposed site.pdf | 25 Oct 2023 |
| 9) Upload village map showing the proposed site.(Not clear)File: 9 Village map showing the proposed site.pdf | 25 Oct 2023 |
| 10(a) Upload commencement certificate.(Number of units not matching with the details entered)File: 10(a) Commencement certificate of Block 2.pdf | 25 Oct 2023 |
| 10(b) Upload commencement certificate.(Number of units not matching with the details entered)File: 10(b) Commencement certificate of Block 1.pdf | 25 Oct 2023 |
| 11(a) Number of units in the KSPCB NOC is not matching with the sanction Plan.File: 11(a) KSPCB CFE_Block 2.pdf | 25 Oct 2023 |
| 11(b) Number of units in the KSPCB NOC is not matching with the sanction Plan.File: 11(b) KSPCB CFE_Block 1.pdf | 25 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Aratt Avant Twilight on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 33 registered projects within 2 km.
Floris & Commercial at Brigade Autograph
Ananthay Properties Private Limited
Godrej Woodscapes
Godrej Properties Limited
Sattva Songbird
Sattva Resi Private Limited
Godrej Splendour
Godrej Properties Limited
PAVANI MIRABILIA PHASE I
Sai Sravanthi Infra Projects Pvt Ltd
Godrej Splendour Phase II
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: ARATTUKULAM INFRASTRUCTURE CONSTRUCTIONS PRIVATE LIMITED
ARATTUKULAM INFRASTRUCTURE CONSTRUCTIONS PRIVATE LIMITED has 1 registration on RERA Karnataka, including Aratt Avant Twilight. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Aratt Avant Twilight is delayed beyond 30 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Aratt Avant Twilight?
The registered promoter entity is ARATTUKULAM INFRASTRUCTURE CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U70102KA2008PTC048065 and GSTIN 29AAHCA5939Q1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Aratt Avant Twilight?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Aratt Avant Twilight?
The professionals named in the filing: Architect: Design Desk; Engineer: RADINS ENGINEERS LLP; Chartered Accountant: Krishnamurthy B. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aratt Avant Twilight?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.