Registration approved No litigation declared Residential/Group Housing project

ANURAAG ADEEP

By M/s. ANURAAG CONSTRUCTIONS

RG-KA-45543 · RERA PRM/KA/RERA/1250/304/PR/291026/009052 · Last updated on RERA Karnataka portal: 7 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2029Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 223 documents Report an error

ANURAAG ADEEP is a Residential/Group Housing project by M/s. ANURAAG CONSTRUCTIONS in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/291026/009052 on 29 Oct 2026. Possession is promised by 31 Mar 2029.

At a glance

Project

  • NameANURAAG ADEEP
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 560087
  • Pincode560087
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/291026/009052
  • ReraGenie IDRG-KA-45543

Builder

  • NameM/s. ANURAAG CONSTRUCTIONS
  • Entity typePartnership Firm
  • GSTIN29AAYFA5185E1ZW
  • Authorized SignatoryGarlapati Sravan Kumar Reddy

Key dates

this monthRegisteredOct 2026PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Oct 2026
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed223 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANURAAG ADEEP---76076

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 7 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 7 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership9

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,704 sq m
Named landowners9
LandownerVillageDistrict
M. MALLESH--
M. MALLESH--
B K HARISH--
B K HARISH--
B K HARISH--
B K HARISH--
B K HARISH--
RENUKAMMA--
MUNIYAPPA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 18.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 18.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTata Vittala Srinivas
EngineerVara Prasad Reddy S
Chartered AccountantNikhil N

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed223

As listed on the registration, under the names the promoter filed them with; the newest 80 of 223 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/291026/009052 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
partition MR Muniyappa sy no 39-45File: partition MR Muniyappa sy no 39-45.pdf7 Oct 2026
Court OrderFile: Court Order.pdf7 Oct 2026
SY NO-39-45 old RTCFile: SY NO-39-45 old RTC.pdf7 Oct 2026
MR 39-45File: MR 39-45 N.pdf7 Oct 2026
MR H33File: MR H33.pdf7 Oct 2026
MRFile: MR.pdf7 Oct 2026
EC 39-2 till dateFile: EC 39-2.pdf7 Oct 2026
EC 39-3 till dateFile: EC 39-3.pdf7 Oct 2026
EC 39-4 till dateFile: EC 39-4.pdf7 Oct 2026
EC 39-28 till dateFile: EC 39-28.pdf7 Oct 2026
EC 39-42 till dateFile: EC 39-42.pdf7 Oct 2026
EC 39-43 till dateFile: EC 39-43.pdf7 Oct 2026
EC 39-45 till dateFile: EC 39-45.pdf7 Oct 2026
EC 39-46 till dateFile: EC 39-46.pdf7 Oct 2026
EC 39-5 till dateFile: EC 39-5.pdf7 Oct 2026
Katha all Sy NoFile: KATHA.pdf7 Oct 2026
Change of land useFile: Change of land use.pdf7 Oct 2026
CDP MapFile: CDP Map.pdf7 Oct 2026
Village mapFile: Village map.pdf7 Oct 2026
Eng Licence CertFile: Eng Licence Cert.pdf7 Oct 2026
FORM - 3 CERTIFICATE BY ENGINEERFile: FORM - 3 CERTIFICATE BY ENGINEER.pdf7 Oct 2026
Estimation by engineerFile: Estimation by engineer.pdf7 Oct 2026
STPFile: STP.pdf7 Oct 2026
Valid Eng Licence CertFile: Eng Licence Cert.pdf7 Oct 2026
STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILITY CERTIFICATE.pdf7 Oct 2026
LAND COST CALCULATION SHEETFile: LAND COST CALCULATION SHEET.pdf7 Oct 2026
Guidance Value Cert revisedFile: Guidance Value Cert revised.pdf7 Oct 2026
Details of area as per approved PlanFile: Details of area as per approved Plan.pdf7 Oct 2026
Approved PlanFile: PLAN 2.pdf7 Oct 2026
RTC, survey 39/2-
Mutation, survey 39/2-
Encumbrance Certificate, survey 39/2-
Conversion/Alienation Order, survey 39/2-
Sale/Title/Gift Deed, survey 39/2-
JDA, survey 39/2-
Khatha, survey 39/2-
RTC, survey 39/28-
Mutation, survey 39/28-
Encumbrance Certificate, survey 39/28-
Conversion/Alienation Order, survey 39/28-
Sale/Title/Gift Deed, survey 39/28-
JDA, survey 39/28-
Khatha, survey 39/28-
RTC, survey 39/3-
Mutation, survey 39/3-
Encumbrance Certificate, survey 39/3-
Conversion/Alienation Order, survey 39/3-
Sale/Title/Gift Deed, survey 39/3-
JDA, survey 39/3-
Khatha, survey 39/3-
RTC, survey 39/4-
Mutation, survey 39/4-
Encumbrance Certificate, survey 39/4-
Conversion/Alienation Order, survey 39/4-
Sale/Title/Gift Deed, survey 39/4-
JDA, survey 39/4-
Khatha, survey 39/4-
RTC, survey 39/5-
Mutation, survey 39/5-
Encumbrance Certificate, survey 39/5-
Conversion/Alienation Order, survey 39/5-
Sale/Title/Gift Deed, survey 39/5-
JDA, survey 39/5-
Khatha, survey 39/5-
RTC, survey 39/43-
Mutation, survey 39/43-
Encumbrance Certificate, survey 39/43-
Conversion/Alienation Order, survey 39/43-
Sale/Title/Gift Deed, survey 39/43-
JDA, survey 39/43-
Khatha, survey 39/43-
RTC, survey 39/46-
Mutation, survey 39/46-
Encumbrance Certificate, survey 39/46-
Conversion/Alienation Order, survey 39/46-
Sale/Title/Gift Deed, survey 39/46-
JDA, survey 39/46-
Khatha, survey 39/46-
RTC, survey 39/42-
Mutation, survey 39/42-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep ANURAAG ADEEP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmANURAAG ADEEPOther 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: M/s. ANURAAG CONSTRUCTIONS

M/s. ANURAAG CONSTRUCTIONS has 1 registration on RERA Karnataka, including ANURAAG ADEEP. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if ANURAAG ADEEP is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ANURAAG ADEEP?

The registered promoter entity is M/s. ANURAAG CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29AAYFA5185E1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ANURAAG ADEEP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ANURAAG ADEEP?

The professionals named in the filing: Architect: Tata Vittala Srinivas; Engineer: Vara Prasad Reddy S; Chartered Accountant: Nikhil N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANURAAG ADEEP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANURAAG ADEEP. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANURAAG ADEEP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.