Home / Browse projects / Bengaluru Urban, Karnataka / Amoga Sai Residency
Amoga Sai Residency
RG-KA-51732 · RERA PRM/KA/RERA/1251/308/PR/200825/008008 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Amoga Sai Residency is a Residential/Group Housing project by Amoga Builders in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/200825/008008 on 20 Aug 2025. Possession is promised by 31 Dec 2027. 16 of the 64 units on this registration are recorded sold or booked, and 6 of 14 construction stages are filed complete.
At a glance
Project
- NameAmoga Sai Residency
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560100
- Pincode560100
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/200825/008008
- ReraGenie IDRG-KA-51732
Builder
- NameAmoga Builders
- Entity typePartnership Firm
- GSTIN29ACFFA4290H1Z9
- Authorized SignatoryMr Ananda
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on20 Aug 2025
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed169 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 32 | 0 | 32 |
| Block B | - | - | - | 32 | 0 | 32 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 14 construction stages are filed complete. The stage furthest along is Plastering inside, at 65%.
Building: 56% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 65% |
| Joinery: Doors, Windows, Ventilators etc | 65% |
| Basic work of Water supply, Sanitary and Electrification | 50% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 5% |
| Railing and Grill fixing | 5% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 50% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 50% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 50% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mr Lohit.S | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 14.03 cr | Rs 7.56 cr |
| On-site expenditure-Salaries of workers | Rs 2.50 cr | - |
| Payment of taxes | Rs 1.50 cr | - |
| On-site expenditure-Consultants Fees | Rs 20.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prakash Naidu |
| Engineer | BYRESH A |
| Chartered Accountant | Venkatramana P |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed169
As listed on the registration, under the names the promoter filed them with; the newest 80 of 169 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/200825/008008 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: AMOGA BUILDERS FORM4 Q-2.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 05 14-10-2025.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 06 14-10-2025.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: AMOGA FORM 4 Q3.pdf | 13 Apr 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: FORM 5.pdf | 13 Apr 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: form 6.pdf | 13 Apr 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Rera Form 4 Q4 FY 25-26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: FORM-5.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Source of Funds with supporting documentsFile: 1 Source of Funds with supporting documents.pdf | 16 Aug 2025 |
| Amoga Builder Provisional Financials FY 2024-25File: 2 Amoga Builder Provisional Financials FY 2024-25.pdf | 16 Aug 2025 |
| Parther DEVARAJU Financials FY 2024-25File: 3 Parther DEVARAJU FY 2024-25.pdf | 16 Aug 2025 |
| Partner Prakash Naidu BL and P&L FY 2024-25File: 4 Partner Prakash Naidu BL and P&L FY 2024-25.pdf | 16 Aug 2025 |
| Networth Certificates for all partnersFile: 5 Networth Certificates for all partners.pdf | 16 Aug 2025 |
| Clarification letter on FinancialsFile: 7 Clarification letter on Financials.pdf | 16 Aug 2025 |
| Project Expenses as on 11-08-2025File: 8 Project Expenses as on 11-08-2025.pdf | 16 Aug 2025 |
| Form-6 Quarterly Engineer CertificateFile: 9 Form-6 Quarterly Engineer Certificate.pdf | 16 Aug 2025 |
| PRAMOTERS FINANCIALSFile: M Devarajulu Naidu networth certificate (1).pdf | 30 Jul 2025 |
| PRAMOTERS FINANCIALSFile: Anand V networth certificate (1).pdf | 30 Jul 2025 |
| PRAMOTERS FINANCIALSFile: Prakash Naidu networth certificate (1).pdf | 30 Jul 2025 |
| PRAMOTERS FINANCIALSFile: Krishnama Naidu networth certificate (1).pdf | 30 Jul 2025 |
| PRAMOTERS FINANCIALSFile: Anand V networth certificate (1).pdf | 17 Jul 2025 |
| PRAMOTERS FINANCIALSFile: M Devarajulu Naidu networth certificate (1).pdf | 17 Jul 2025 |
| PRAMOTERS FINANCIALSFile: Prakash Naidu networth certificate (1).pdf | 17 Jul 2025 |
| PRAMOTERS FINANCIALSFile: Krishnama Naidu networth certificate (1).pdf | 17 Jul 2025 |
| PRAMOTERS FINANCIALSFile: M Devarajulu Naidu networth certificate.pdf | 5 Jun 2025 |
| PRAMOTERS FINANCIALSFile: Anand V networth certificate.pdf | 5 Jun 2025 |
| PRAMOTERS FINANCIALSFile: Prakash Naidu networth certificate.pdf | 5 Jun 2025 |
| PRAMOTERS FINANCIALSFile: Krishnama Naidu networth certificate.pdf | 5 Jun 2025 |
| Land cost calculation sheet as per the guidance value (Self-attested copy).File: guidence value report.pdf | 29 Apr 2025 |
| permission letter issued by the concerned Karnataka Ground Water AuthorityFile: ground water permission.pdf | 29 Apr 2025 |
| the permission letter issued by the concerned Karnataka Ground Water Authority.File: BOREWELL LETTER.jpeg | 5 Apr 2025 |
| the guidance value (Self-attested copy).File: Guidance Value Report-12.pdf | 5 Apr 2025 |
| the amenities and common area detailsFile: COMMAN AREA.pdf | 5 Apr 2025 |
| KSPCB NOCFile: KSPCB.pdf | 5 Apr 2025 |
| Village mapFile: MASTER COPY.pdf | 5 Apr 2025 |
| Master plan ExtractFile: MASTER COPY.pdf | 5 Apr 2025 |
| commencement certificateFile: CC.pdf | 5 Apr 2025 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: APPROVAL PLAN.pdf | 5 Apr 2025 |
| Building License Original CopyFile: BDA Licence - Work Order.pdf | 5 Apr 2025 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR SKETCH COPY.pdf | 5 Apr 2025 |
| latest katha extractFile: 9 Khatha 966.pdf | 5 Apr 2025 |
| current year RTCFile: RTC - 2023-2024 CURRENT YEAR.pdf | 5 Apr 2025 |
| certificate of registration of partnership firmFile: Amoga Partnership Deed (1).pdf | 5 Apr 2025 |
| Upload profit and loss account and balance sheet, 2023-24 with CA UDIN along with scheduleFile: NEW PROJECT.pdf | 5 Apr 2025 |
| profit and loss account and balance sheet, 2021-22, 2022-23 & 2023-24 with CA UDIN along with scheduFile: NEW PROJECT.pdf | 4 Mar 2025 |
| certificate of registration of partnership firmFile: Amoga Partnership Deed (1).pdf | 4 Mar 2025 |
| copy of current year RTCFile: RTC - 2023-2024 CURRENT YEAR.pdf | 4 Mar 2025 |
| latest katha extractFile: 9 Khatha 966.pdf | 4 Mar 2025 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR SKETCH COPY.pdf | 4 Mar 2025 |
| Building License Original CopyFile: BDA Licence - Work Order.pdf | 4 Mar 2025 |
| Approved building plan - Original CopyFile: APPROVAL PLAN.pdf | 4 Mar 2025 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: APPROVAL PLAN.pdf | 4 Mar 2025 |
| commencement certificateFile: CC.pdf | 4 Mar 2025 |
| Approved Master plan Extract marked the proposed land and certified by the concern AuthorityFile: ADLR SKETCH COPY.pdf | 4 Mar 2025 |
| Village map certified by the concern officer with demarcation of proposed landFile: Dodda Thoguru 96 LU.pdf | 4 Mar 2025 |
| KSPCB NOCFile: KSPCB.pdf | 4 Mar 2025 |
| Common Area Allotted To Association on the project detail page.File: COMMAN AREA.pdf | 4 Mar 2025 |
| ype of Inventory properly on the project detail page.File: 44444.pdf | 4 Mar 2025 |
| Please update the amenities and common area details properly on the project detail page and uploadFile: COMMAN AREA.pdf | 4 Mar 2025 |
| Please mention the project name and project address and upload the STP design drawing certified by tFile: STP.pdf | 4 Mar 2025 |
| guidance value(Self-attested copy).File: GUIDANCE VALUE REPORT.pdf | 4 Mar 2025 |
| Estimated cost of the projectFile: ESTIMATED COST OF CONSTRUCTION BY CIVIL ENGINEER.pdf | 9 Feb 2025 |
| CA certificateFile: CA CERTIFICATE.pdf | 9 Feb 2025 |
| profit and loss account and balance sheet, 2021-22, 2022-23 & 2023-24with CA UDIN along with schedulFile: NEW PROJECT.pdf | 9 Feb 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Amoga Sai Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
Mahendra Arto Helix
MAHENDRA ARTO LLP
AJMERA IRIS
AJMERA HOUSING CORPORATION BANGALORE
INSPIRA TROPICAL GARDEN
IINSPIRA TROPICAL GARDEN LLP
Shravanthi Prakruti
BKN Developers Pvt Ltd
Ayatana Residences E-City
ARATT ONE WORLD PRIVATE LIMITED
SPLENDID EVORA
SPLENDID PROPERTIES
See every Bengaluru Urban project, with the district possession charts
Builder: Amoga Builders
Amoga Builders has 1 registration on RERA Karnataka, including Amoga Sai Residency. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Amoga Sai Residency is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Amoga Sai Residency?
The registered promoter entity is Amoga Builders, a partnership firm as per the filing. Its GSTIN 29ACFFA4290H1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Amoga Sai Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Amoga Sai Residency?
The professionals named in the filing: Architect: Prakash Naidu; Engineer: BYRESH A; Chartered Accountant: Venkatramana P. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amoga Sai Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback