- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SPLENDID EVORA is a Residential/Group Housing project by SPLENDID PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/250926/008969 on 25 Sep 2026. Possession is promised by 31 Dec 2030. 0 of the 114 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameSPLENDID EVORA
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560100
- Pincode560100
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/250926/008969
- ReraGenie IDRG-KA-15390
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on25 Sep 2026
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings3 building records
- Documents filed103 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 37 | 0 | 37 |
| Tower B | - | - | - | 39 | 0 | 39 |
| Tower C | - | - | - | 38 | 0 | 38 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 85%.
Building: 5% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 85% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| C Krishnamoorthy | - | - |
| C Krishnamoorthy | - | - |
| J Saravana | - | - |
| Vishwanath Jagannathan | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 98.70 cr | Rs 2.31 cr |
| Administrative Cost | Rs 39.50 cr | Rs 1.49 cr |
| Payment of taxes | Rs 14.00 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 4.66 cr | Rs 1.96 lakh |
| On-site expenditure-Consultants Fees | Rs 2.20 cr | Rs 31.22 lakh |
| On-site expenditure-Salaries of workers | - | Rs 27.10 lakh |
| On-site expenditure-Site Overhead | - | Rs 2.49 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAVEEN KUMAR K |
| Engineer | Surendra Nadh M |
| Chartered Accountant | T KRISHANAKUMAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed103
As listed on the registration, under the names the promoter filed them with; the newest 80 of 103 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/250926/008969 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Splendid RERA FORM4.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: form5.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: SPLENDID EVORA 13-10-2026.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Change of Land Use DocumentFile: 1 Change of Landuse.pdf | 21 Sep 2026 |
| Unit details ClarificationFile: 2 Unit Details Clarification.pdf | 21 Sep 2026 |
| Form 3 Engineer CertificateFile: 3 Form 3 Engineer Certificate 2.pdf | 21 Sep 2026 |
| Agreement of Sale - ProformaFile: 4 Proforma Sale Agreement.pdf | 21 Sep 2026 |
| Water Assurance and Supporting documentsFile: 5 Water Assurance and Support documents.pdf | 21 Sep 2026 |
| Project Cost Estimate by EngineerFile: 6 Project Cost Estimate 2.pdf | 21 Sep 2026 |
| RTC, survey 121/13 | - |
| Mutation, survey 121/13 | - |
| Encumbrance Certificate, survey 121/13 | - |
| Conversion/Alienation Order, survey 121/13 | - |
| Sale/Title/Gift Deed, survey 121/13 | - |
| JDA, survey 121/13 | - |
| Khatha, survey 121/13 | - |
| RTC, survey 121/37 | - |
| Mutation, survey 121/37 | - |
| Encumbrance Certificate, survey 121/37 | - |
| Conversion/Alienation Order, survey 121/37 | - |
| Sale/Title/Gift Deed, survey 121/37 | - |
| JDA, survey 121/37 | - |
| Khatha, survey 121/37 | - |
| RTC, survey 121/13 | - |
| Mutation, survey 121/13 | - |
| Encumbrance Certificate, survey 121/13 | - |
| Conversion/Alienation Order, survey 121/13 | - |
| Sale/Title/Gift Deed, survey 121/13 | - |
| JDA, survey 121/13 | - |
| Khatha, survey 121/13 | - |
| RTC, survey 121/13 | - |
| Mutation, survey 121/13 | - |
| Encumbrance Certificate, survey 121/13 | - |
| Conversion/Alienation Order, survey 121/13 | - |
| Sale/Title/Gift Deed, survey 121/13 | - |
| JDA, survey 121/13 | - |
| Khatha, survey 121/13 | - |
| Registration CertificateFile: Incorporation certificate.pdf | - |
| GST CertificateFile: GST.pdf | - |
| Partnership DeedFile: Partnership deed 2.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: 3 Form 3 Engineer Certificate 2.pdf | - |
| Certificate issued by Engineer Form 3File: Form 2 Architect certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non Litigation Affidavit.pdf | - |
| Balance Sheet 2024 - 2025File: Balance Sheet 24-25.pdf | - |
| Balance Sheet 2023 - 2024File: Balance Sheet 23-24.pdf | - |
| Balance Sheet 2022 - 2023File: Balalnce Sheet 22-23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: Profit and Loss 24-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss 23-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss 22-23.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: ITR 24-25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR Ack 23-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR Ack 22-23.pdf | - |
| BDA Plan Approval Letter | - |
| Sanction Plans-PDF | - |
| Sectional Plan | - |
| Structural Stability Certificate 2 | - |
| Project Specifications | - |
| Relinquishment Deed | - |
| Proforma Sale Agreement | - |
| Proforma Allotment Letter | - |
| FORM-B Affidavit | - |
| Sec 3-1 Non Violation Affidavit | - |
| JDA Affidavit | - |
| Legal opinion | - |
| NOC BESCOM | - |
| NOC WATER | - |
| NOC KSPCB | - |
| NOC SEIAA | - |
| NOC FIRE | - |
| NOC AIRPORT | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SPLENDID EVORA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 18 registered projects within 2 km.
Mahendra Arto Helix
MAHENDRA ARTO LLP
AJMERA IRIS
AJMERA HOUSING CORPORATION BANGALORE
INSPIRA TROPICAL GARDEN
IINSPIRA TROPICAL GARDEN LLP
Shravanthi Prakruti
BKN Developers Pvt Ltd
Ayatana Residences E-City
ARATT ONE WORLD PRIVATE LIMITED
VARAD
SATYAM BUILDERS & DEVELOPERS
See every Bengaluru Urban project, with the district possession charts
Builder: SPLENDID PROPERTIES
SPLENDID PROPERTIES has 3 registrations on RERA Karnataka, including SPLENDID EVORA and SPLENDID LAKE BREEZ. Its filings declare 5 earlier projects, 5 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SPLENDID EVORA is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SPLENDID EVORA?
The registered promoter entity is SPLENDID PROPERTIES, a partnership firm as per the filing. Its GSTIN 29ACBFS3979D1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SPLENDID EVORA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SPLENDID EVORA?
The professionals named in the filing: Architect: PRAVEEN KUMAR K; Engineer: Surendra Nadh M; Chartered Accountant: T KRISHANAKUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SPLENDID EVORA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback