Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
AMBIANT - MAANGALYA ASHIRVAD is a Residential/Group Housing project by AMBIANT HOUSING & CONSTRUCTION PVT LTD. in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/160125/007385 on 16 Jan 2025. Possession is promised by 30 Apr 2028.
At a glance
Project
- NameAMBIANT - MAANGALYA ASHIRVAD
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560083
- Pincode560083
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/160125/007385
- ReraGenie IDRG-KA-32047
Builder
- NameAMBIANT HOUSING & CONSTRUCTION PVT LTD.
- Entity typeCompany
- CINU45205KA2012PTC066449
- GSTIN29AALCA1122D1Z4
- Authorized SignatoryA. V. NAGARAJ
- DirectorANAGATI VENUGOPAL NAGARAJ
- DirectorsANAGATI VENUGOPAL NAGARAJ, RADHA VENUGOPAL, BOLLINENI VANI
- Project HeadANAGATI VENUGOPAL NAGARAJ
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on16 Jan 2025
- Promised completion30 Apr 2028
- Revised completionNone
- Buildings1 building record
- Documents filed145 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C BLOCK | - | - | - | 60 | 0 | 60 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 13 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 0%.
Building: 31% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Maangalya Developers | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 21.99 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DILIP NADIG |
| Engineer | Thilak Prasad B S |
| Chartered Accountant | VARUN. S |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed145
As listed on the registration, under the names the promoter filed them with; the newest 80 of 145 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/160125/007385 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: declarationWITHLASTQUATERCACERTIFICATEcompre.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: declarationWITHLASTQUATERARTICHETCERTIFICATE.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: declarationWITHLASTQUATERENGCERTIFICATE.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: declaration_WITH_LAST_QUATER_CA_CERTIFICATE_compressed.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: declaration_WITH_LAST_QUATER__ARTICHET_CERTIFICATE.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: declaration_WITH_LAST_QUATER_ENG_CERTIFICATE.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: ca_compressed.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (QU)(1)_signed_signed.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6, Engineer (QU)(1)_signed_signed.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: ca.pdf | 20 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: ARCHITECT'S CERTIFICATE.pdf | 20 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: ENGINEER'S CERTIFICATE.pdf | 20 Feb 2026 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR Certificate Ambiant.jpeg | 7 Nov 2024 |
| Approved Original Single Plot layout planFile: Single Plan Layout.pdf | 7 Nov 2024 |
| Carpet Area CalculationFile: CARPET AREA CALCULATION.pdf | 7 Nov 2024 |
| NOC issued by BESCOM and BWSSB-ClarificationFile: Declaration.pdf | 7 Nov 2024 |
| Bank Affidavit UpdatedFile: Bank Affidavit.pdf | 7 Nov 2024 |
| Updated KYC self attestedFile: kyc_compressed.pdf | 7 Nov 2024 |
| Declaration about approved Building planFile: Approved Building Plan Declaration.pdf | 7 Nov 2024 |
| Approved Building PlanFile: Approved Building Plan Ambiant (1).jpeg | 7 Nov 2024 |
| Building License from Local Authority Original CopyFile: Building Licence from BBMP Dt 12052010 (1).pdf | 7 Nov 2024 |
| Airport NOC ClarificationFile: Ambiant Airport_merged.pdf | 7 Nov 2024 |
| Clarification regarding the status of the project: NEW PROJECTFile: Clarification regarding the status of the project.pdf | 7 Nov 2024 |
| Project PictureFile: Picture.jpeg | 7 Nov 2024 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed landFile: ADLR Certificate- Ambiant.jpeg | 11 Oct 2024 |
| Updated Bank Account details and passbookFile: KBL - RERA DESIGNATED ACCOUNT - PASS SHEET.pdf | 11 Oct 2024 |
| Land cost calculation sheet as per the guidance value(self-attested copy)File: GUIDANCE VALUE - WITH SELF ATTESTED.pdf | 11 Oct 2024 |
| Connected MR in favour of landowner before conversionFile: MUTTION REGISTER COPY.pdf | 11 Oct 2024 |
| Building License from Local Authority Original CopyFile: Building Licence from BBMP Dt 12-05-2010.pdf | 11 Oct 2024 |
| Latest RTCFile: RTC COPY 10-10-2024.pdf | 11 Oct 2024 |
| Approved Building PlanFile: Approved Building Plan- Ambiant.jpeg | 11 Oct 2024 |
| Updated Bank AccountFile: BANK AFFIDAVIT - 1 (1).pdf | 11 Oct 2024 |
| Clarification regarding the status of the project: NEW PROJECTFile: Clarification regarding the status of the project-NEW PROJECT- Ambiant.pdf | 11 Oct 2024 |
| NOC issued by BESCOM and BWSSB-ClarificationFile: NOC issued by BESCOM and BWSSB.pdf | 11 Oct 2024 |
| NOC issued by the concerned Airport-ClarificationFile: AIRPORT AUTHORITY OF INDIA - NOC.pdf | 11 Oct 2024 |
| Clarification regarding Single Plot layout plan work orderFile: Clarification regarding Single Plot layout plan work order.pdf | 11 Oct 2024 |
| Clarification regarding Single Plot layout planFile: Clarification regarding Single Plot layout plan.pdf | 11 Oct 2024 |
| Area Calculation sheet certified by the engineerFile: CARPET AREA CALCULATION.pdf | 11 Oct 2024 |
| Clarification regarding the fees paid for our projectFile: Clarification regarding the fees paid.pdf | 5 Sep 2024 |
| Form-2 Architect CertificateFile: FORM 2 ARCHITECT CERTIFICATE.pdf | 5 Sep 2024 |
| Engineer LicenseFile: Engineer License Thilak BBMP license.pdf | 5 Sep 2024 |
| Source of Water- BorewellFile: Source of Water- Borewell.jpeg | 5 Sep 2024 |
| Building LicenseFile: Building Licence from BBMP Dt 12-05-2010.pdf | 5 Sep 2024 |
| STP Drawing as per KSPCBFile: STP DRAWING AS PER THE KSPCB NOC - SELF ATTESTED BY THE ENGINEE (1).pdf | 5 Sep 2024 |
| Bank AffidavitFile: BANK AFFIDAVIT.pdf | 5 Sep 2024 |
| Commencement Letter from BBMPFile: COMMENCEMENT LETTER FROM BBMP.pdf | 5 Sep 2024 |
| CA Certificate with Self AttestedFile: CA Certificate with Self attested.pdf | 13 Jul 2024 |
| Latest KhathaFile: Kahata Certificate Latest - II Phase MA.pdf | 13 Jul 2024 |
| Pass book / pass sheet of 100%, 70% & 30% account numberFile: PASS SHEET OF KARNATAKA BANK LIMITED WITH RERA NAME.pdf | 13 Jul 2024 |
| Title deed of the land ownerFile: Title Deed SALE DEED - MAANGALYA.pdf | 13 Jul 2024 |
| CDP MapFile: CDP MAP SHOWING THE PROPOSED SITE.jpg | 13 Jul 2024 |
| CLU OrderFile: CHANGE OF LAND IN USE.pdf | 13 Jul 2024 |
| Commencement CertificateFile: COMMENCEMENT LETTER FROM BBMP.pdf | 13 Jul 2024 |
| Latest RTCFile: RTC LATEST 1.png | 13 Jul 2024 |
| Bank AffidavitFile: BANK AFFIDAVIT.pdf | 13 Jul 2024 |
| Amenities and Common Area DetailsFile: AMENITIES AND COMMON AREA DETAILS.pdf | 13 Jul 2024 |
| Self-Attested BESCOMFile: BESCOM - NOC - SELF ATTESTED COPY.pdf | 13 Jul 2024 |
| Self-Attested BWSSBFile: BWSSB - NOC - WITH FEES RECEIPT - SELF ATTESTED COPY.pdf | 13 Jul 2024 |
| Water NOCFile: BWSSB - NOC - WITH FEES RECEIPT - SELF ATTESTED COPY.pdf | 13 Jul 2024 |
| KSPCB NOCFile: KSPCB NOC.pdf | 13 Jul 2024 |
| Fire NOCFile: FIRE NOC- Ambiant.pdf | 13 Jul 2024 |
| Airport NOCFile: AIRPORT AUTHORITY OF INDIA - NOC.pdf | 13 Jul 2024 |
| SEIAA LetterFile: SEIAA - LETTER.pdf | 13 Jul 2024 |
| sanctioned drawings floor plan, sectional drawings and elevationsFile: sanctioned drawings floor plan, sectional drawings and elevations_compressed_compressed.pd | 13 Jul 2024 |
| JD AffidavitFile: JD AFFIDAVIT CUM DECLARATION.pdf | 13 Jul 2024 |
| Agreement of Sale ProformaFile: Agreement of Sale Proforma final.pdf | 13 Jul 2024 |
| Company registration certificateFile: COMPANY REGISTRATION CERTIFICATE.pdf | 13 Jun 2024 |
| RTC CopyFile: RTC COPY.pdf | 13 Jun 2024 |
| Mutation CopyFile: MUTTION REGISTER COPY.pdf | 13 Jun 2024 |
| Latest ECFile: EC - FROM 01-04-2008 TO 06-06-2024.pdf | 13 Jun 2024 |
| Commencement CertificateFile: COMMENCEMENT LETTER FROM BBMP.pdf | 13 Jun 2024 |
| KSPCB NOCFile: KSPCB NOC.pdf | 13 Jun 2024 |
| SEIAA LetterFile: SEIAA - LETTER.pdf | 13 Jun 2024 |
| Airport AuthorityFile: AIRPORT AUTHORITY OF INDIA - NOC.pdf | 13 Jun 2024 |
| Project SpecificationsFile: PROJECT SPECIFICATIONS (2).pdf | 13 Jun 2024 |
| Engineer License CertificateFile: ENGINEER LICENSE CERTIFICATE.pdf | 13 Jun 2024 |
| Amenities and Common Area DetailsFile: AMENITIES AND COMMON AREA DETAILS.pdf | 13 Jun 2024 |
| Estimated Cost of ConstructionFile: ESTIMATED COST OF THE CONSTRUCTION - CERTIFIED BY ENGINEER.pdf | 13 Jun 2024 |
| Carpet Area CalculationFile: CARPET AREA CALCULATION.pdf | 13 Jun 2024 |
| BESCOM NOCFile: BESCOM - NOC - SELF ATTESTED COPY.pdf | 13 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep AMBIANT - MAANGALYA ASHIRVAD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 16 registered projects within 2 km.
Godrej Vanantara
GODREJ IRISMARK PRIVATE LIMITED
CASAGRAND HAZEN
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
GRC SAPPHIRE SPRING - PHASE -1
GRC Infra Pvt. Ltd.
COURTYARD BY VEDANTH SURAKSHA
VEDANTH SURAKSHA PROPERTIES
GRC SAPPHIRE SPRING PHASE II
GRC Infra Private Limited
PLATINUM GREENFIELDS
SAI PROPERTIES
See every Bengaluru Urban project, with the district possession charts
Builder: AMBIANT HOUSING & CONSTRUCTION PVT LTD.
AMBIANT HOUSING & CONSTRUCTION PVT LTD. has 1 registration on RERA Karnataka, including AMBIANT - MAANGALYA ASHIRVAD. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if AMBIANT - MAANGALYA ASHIRVAD is delayed beyond 30 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of AMBIANT - MAANGALYA ASHIRVAD?
The registered promoter entity is AMBIANT HOUSING & CONSTRUCTION PVT LTD., a company as per the filing. Its CIN U45205KA2012PTC066449 and GSTIN 29AALCA1122D1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in AMBIANT - MAANGALYA ASHIRVAD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at AMBIANT - MAANGALYA ASHIRVAD?
The professionals named in the filing: Architect: DILIP NADIG; Engineer: Thilak Prasad B S; Chartered Accountant: VARUN. S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMBIANT - MAANGALYA ASHIRVAD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback