Airlink Luxor

By Narasingasa Reality

RG-KA-65917 · RERA PRM/KA/RERA/1259/479/PR/261125/008277 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2030Possession promisedno revision filed
2 of 16Construction stages donefurthest along: Upto Plinth Level, 50%
28 of 49Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 83 documents Report an error

Airlink Luxor is a Residential/Group Housing project by Narasingasa Reality in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/479/PR/261125/008277 on 26 Nov 2025. Possession is promised by 31 Mar 2030. 21 of the 49 units on this registration are recorded sold or booked, and 2 of 16 construction stages are filed complete.

At a glance

Project

  • NameAirlink Luxor
  • TypeResidential/Group Housing
  • Location
    • Hubballi
    • Dharwad
    • 580030
  • Pincode580030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1259/479/PR/261125/008277
  • ReraGenie IDRG-KA-65917

Builder

  • NameNarasingasa Reality
  • Entity typePartnership Firm
  • GSTIN29AAWFN1919P1Z8
  • Authorized SignatoryKiran P Habib

Key dates

this monthRegisteredNov 2025PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Nov 2025
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

43%21 of 49 units booked
15.1%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Airlink Luxor---49049

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 16 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 50%.

Building: 16% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level50%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes10%
Sewage and Drainage SystemYes10%
Water conservation/rain water harvesting/recharge of ground waterYes10%
Energy managementYes10%
Fire protection and fire safety requirementsYes10%
Solid waste management and disposalYes10%
Emergency Evacuation servicesYes10%
Internal Roads & FootpathsYes10%
Electricity supply transformer and substationYes10%
Storm water drainsYes10%
Use of renewable energyYes10%
Sewage Treatment Plant (STP)Yes10%
Parks & Tree plantingYes10%
Street LightingYes10%
ElectricityYes10%
Smart Home AutomationYes10%
CCTV SurveillanceYes10%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes10%
Piped GasNoNot applicable
Water and SanitationYes10%
Air ConditioningNoNot applicable
StaircasesYes20%
LiftsYes20%
Corridor/LobbiesYes20%
Fire escapesYes20%
Common entrance and exit for the building/common portico/foyer/verandahYes20%
BasementYes20%
TerraceYes20%
Outer WallNoNot applicable
Open parking areasYes20%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,750 sq m
Named landowners1
LandownerVillageDistrict
Anand S Uppin (Director of Hubli Bottling Co Pvt Ltd Hubli)--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 19.99 cr
Cost incurredRs 3.02 cr
Spent of the estimate15.11%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 19.57 crRs 2.96 cr
On-site expenditure-Site OverheadRs 23.50 lakh-
On-site expenditure-Consultants FeesRs 18.00 lakhRs 6.35 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Tanuja R Patil
EngineerEr Akash M Mahindrakar
Chartered AccountantCA Mallikarjun S Pise

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed83

As listed on the registration, under the names the promoter filed them with; the newest 80 of 83 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/479/PR/261125/008277 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Q2 2026-2027 Form 4 CA.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Q2 2026-2027 FORM 5 ARCH.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q2 2026-2027 Form 6 Eng.pdf15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q1 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 6 Q1 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 5 Q1 2026-27.pdf15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate_compressed (1).pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: FORM 5 Architect Certificate.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf3 Mar 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate.pdf3 Mar 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate.pdf3 Mar 2026
Bank Account DetailFile: 1 Bank Detail.pdf19 Nov 2025
Site MapFile: 3 Site Map.pdf19 Nov 2025
Village MapFile: 4 Village Map.pdf19 Nov 2025
Water NOCFile: 7 waterboard NOC.pdf19 Nov 2025
Master planFile: 8 Master Plan.pdf19 Nov 2025
Clarification for QueriesFile: 18 Clarification for Queries.pdf19 Nov 2025
Agreement Foe SaleFile: Agreeement For Sale.pdf19 Nov 2025
Allotment LetterFile: 16 Allotment Letter.pdf19 Nov 2025
Fire NocFile: 17 FIRE and emergency NOC.pdf19 Nov 2025
Approved Building PlanFile: Approved Building Plan.pdf19 Nov 2025
Building Plan Approval LetterFile: Building Plan Approval Letter.pdf19 Nov 2025
HESCOM NOCFile: Hescom Noc Original.pdf19 Nov 2025
Registration CertificateFile: Firm Registration Certificate.pdf-
GST CertificateFile: GST Certificate.pdf-
Partnership DeedFile: GST Certificate.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Reg 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: FORM 3 Engineer certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit Non Litigation.pdf-
Balance Sheet 2024 - 2025File: Balancesheet 2025-26 Narasingsa Reality.pdf-
Balance Sheet 2023 - 2024File: Balancesheet 2025-26 Narasingsa Reality.pdf-
Balance Sheet 2022 - 2023File: Balancesheet 2025-26 Narasingsa Reality.pdf-
Audited Profit and Loss Statement 2024 - 2025File: Profit And Loss Account 2025-26 Narasingsa Reality.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Profit And Loss Account 2025-26 Narasingsa Reality.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Profit And Loss Account 2025-26 Narasingsa Reality.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR Ack 2025-26 Narasingsa Reality.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR Ack 2025-26 Narasingsa Reality.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR Ack 2025-26 Narasingsa Reality.pdf-
APPROVED LETTER-
APPROVED LETTER-
APPROVED DWG-
Structural Stability Certificate-
Project Specification new-
Brochure-
Sale Deed-
Sale Deed-
Sale Deed-
Affidavit Form B-
Affidavit Section 3-
Affidavit JDA-
Ligal Opinion-
HESCOM Noc-
Waterbord NOC-
KSPCB NOC-
Unnamed document-
Fire & Emergency NOC-
Airport Authority NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Estimated cost of construction-
Genaeral Power of Attorney-
Mother Deed-
Form A-
HESCOM Noc 1-
Cash flow Certificate-
Land Cost Calculation and Guidance Valve-
CTS Uttar-
Project Area Clarification-

How this compares with Dharwad

43%of this project is bookeddistrict median 38%
29%of Dharwad projects moved their completion datethis one has not
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep Airlink Luxor on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

2 kmAirlink LuxorOther 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: Narasingasa Reality

Narasingasa Reality has 1 registration on RERA Karnataka, including Airlink Luxor. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if Airlink Luxor is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Airlink Luxor?

The registered promoter entity is Narasingasa Reality, a partnership firm as per the filing. Its GSTIN 29AAWFN1919P1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Airlink Luxor?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Airlink Luxor?

The professionals named in the filing: Architect: Ar Tanuja R Patil; Engineer: Er Akash M Mahindrakar; Chartered Accountant: CA Mallikarjun S Pise. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Airlink Luxor?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Airlink Luxor. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Airlink Luxor to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.