Aiikya Village Sarjapur
By Aiikya Village Sarajapur LLP
RG-KA-66006 · RERA PRM/KA/RERA/1251/446/PR/221123/006419 · Last updated on RERA Karnataka portal: 3 Nov 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Aiikya Village Sarjapur is a Residential/Group Housing project by Aiikya Village Sarajapur LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/221123/006419 on 22 Nov 2023. Possession is promised by 26 Nov 2026. 118 of the 169 units on this registration are recorded sold or booked, and 3 of 19 construction stages are filed complete.
At a glance
Project
- NameAiikya Village Sarjapur
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 562125
- Pincode562125
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/221123/006419
- ReraGenie IDRG-KA-66006
Builder
- NameAiikya Village Sarajapur LLP
- Entity typePartnership Firm
- LLPINAAW-9936
- GSTIN29ABVFA4243M1ZR
- Authorized SignatoryChethan Kumar P
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Nov 2023
- Promised completion26 Nov 2026
- Revised completionNone
- Buildings3 building records
- Documents filed171 files
Current status
Figures as on 3 Nov 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 63 | 0 | 63 |
| B | - | - | - | 60 | 0 | 60 |
| C | - | - | - | 46 | 0 | 46 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 3 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 19 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 87%.
Building: 34% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 49% |
| Retaining wall (All types) | 87% |
| RCC or MS Framed structure | 71% |
| Masonry Construction | 55% |
| Plastering inside , outside & Ceiling | 39% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 19% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 21% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 3 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 60% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 50% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 61% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 58% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 68% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 54% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sindhu G | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 42.83 cr | Rs 36.40 cr |
| Payment of taxes | Rs 7.71 cr | Rs 4.93 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 4.78 cr | Rs 4.21 cr |
| On-site expenditure-Salaries of workers | Rs 4.67 cr | Rs 13.42 cr |
| Payment of fees | Rs 3.89 cr | Rs 3.89 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Srinath .R. Advani (Advani and Associates) |
| Engineer | Rajesh M H |
| Chartered Accountant | V Sagar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed171
As listed on the registration, under the names the promoter filed them with; the newest 80 of 171 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/221123/006419 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form BFile: Form B.pdf | 3 Nov 2026 |
| self attested engineer licenceFile: Licence Attested Copy.pdf | 3 Nov 2026 |
| sold and unsold units detailsFile: Availability List.pdf | 3 Nov 2026 |
| Water NOCFile: Water NOC.pdf | 3 Nov 2026 |
| Fire NOCFile: FIRE NOC.pdf | 3 Nov 2026 |
| Airport NOCFile: Airport Authority NOC.pdf | 3 Nov 2026 |
| Bescom NOCFile: BESCOM NOC.pdf | 3 Nov 2026 |
| BSnl nocFile: BSNL NOC.pdf | 3 Nov 2026 |
| KSPCB NOCFile: KSPCB Pollution NOC.pdf | 3 Nov 2026 |
| SEIAA NOCFile: SEIAA (Environment) NOC.pdf | 3 Nov 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate - AIIKYA V by iScanner.pdf | 17 Aug 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 - Architect - March 2026.pdf | 17 Aug 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate-Mar-26.pdf | 17 Aug 2026 |
| Q4 2025-26 Water supply and sewage board | 17 Aug 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 17 Aug 2026 |
| Q4 2025-26 KPTCL- BESCOM | 17 Aug 2026 |
| Q4 2025-26 Fire and Safety | 17 Aug 2026 |
| Q4 2025-26 Airport Authority of India | 17 Aug 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate - Alikya V by iScanner_compressed.pdf | 17 Aug 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 - Architect - June 2026.pdf | 17 Aug 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate-Jun-26.pdf | 17 Aug 2026 |
| Q1 2026-27 Water supply and sewage board | 17 Aug 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 17 Aug 2026 |
| Q1 2026-27 KPTCL- BESCOM | 17 Aug 2026 |
| Q1 2026-27 Fire and Safety | 17 Aug 2026 |
| Q1 2026-27 Airport Authority of India | 17 Aug 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form - 4 Chartered Accountant - Dec 2025.pdf | 24 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect - Dec 2025.pdf | 24 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Chartered Engineer - Dec 2025.pdf | 24 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 24 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 24 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 24 Feb 2026 |
| Q3 2025-26 Fire and Safety | 24 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 24 Feb 2026 |
| Relinquishment deed road wideningFile: Relinquishment deed.pdf | 20 Nov 2023 |
| AIIKYA SARJAPUR Conversion OrderFile: AIIKYA SARJAPUR Conversion Order.pdf | 20 Nov 2023 |
| PCB NOC application givenFile: PCB NOC application given.jpeg | 20 Nov 2023 |
| NOC DeclarationFile: NOC Declaration.jpeg | 20 Nov 2023 |
| Change of LandFile: Change of Land.pdf | 20 Nov 2023 |
| Tasildhar Letter for ConversionFile: Tasildhar Letter for Conversion.pdf | 20 Nov 2023 |
| Tower wise inventory details updatedFile: Tower wise inventory details updated.xlsx | 20 Nov 2023 |
| STRR Sanctioned Site Plan Section and ElevationFile: STRR Site Plan Section and Elevation.pdf | 20 Nov 2023 |
| Aiikya Village Sarjapur LLP - RERA Designated Collection Account StatementFile: Point 1 Aiikya RERA Designated Collection Account Statement.jpeg | 17 Nov 2023 |
| Partnership DeedFile: Point 7 - Aiikya Village Sarjapura Partnership Deed Scan.pdf | 17 Nov 2023 |
| MR ExtractFile: Point 8 - MR Extract.pdf | 17 Nov 2023 |
| EC from 01-04-2004 till 30-10-2023File: Point 9 ECC-14102023-4306885.pdf | 17 Nov 2023 |
| Katha Extract from the PanchyatFile: Point 10 - Sarjapur Panchayat E-Katha Extract.pdf | 17 Nov 2023 |
| Notorized Non-Litigation AffidavitFile: Point 11 Non-Litigation Affidavit.pdf | 17 Nov 2023 |
| Signed Copy of Advocate Search ReportFile: Point 12 - Legal Opinion - Aiikya Village Sarjapur.pdf | 17 Nov 2023 |
| Revised Form-B Affidavit with date of completion in DDMMYYYY formatFile: Point 13 - Affidavit Form B Notorised.pdf | 17 Nov 2023 |
| JD Affidavit Cum DeclarationFile: JD Affidavit cum declaration signed copy.pdf | 17 Nov 2023 |
| Single Plot LayoutFile: Point 21 Single Site Approval Plan.pdf | 17 Nov 2023 |
| Single Plot Layout OrderFile: Point 22 - Single Site Layout Order.pdf | 17 Nov 2023 |
| Architects Certificate with valid COA NumberFile: Point 23 - Architects certificate with COA.pdf | 17 Nov 2023 |
| CDP MAP Showing Proposed SiteFile: Point 25 CDP Map Showing Proposed Site.pdf | 17 Nov 2023 |
| Village Map Showing the Proposed SiteFile: Point 26 - Village Map Sarjapura.pdf | 17 Nov 2023 |
| Relinguishment DeedFile: Point 27 - Reliquishement Deed - STRR.pdf | 17 Nov 2023 |
| Sanctioned Plan 1File: Point 30 STRR Basement Floor Plan.pdf | 17 Nov 2023 |
| Sanctioned Plan 2File: Point 30 STRR Ground Floor & First Floor Plan.pdf | 17 Nov 2023 |
| Sanctioned Plan 3File: Point 30 STRR Site Plan Section & Elevation.pdf | 17 Nov 2023 |
| Sanctioned Plan 4File: Point 30 STRR Terrace Floor Plan.pdf | 17 Nov 2023 |
| Sanctioned Plan 5File: Point 30 STRR Typical Lower & Upper Floor Plan.pdf | 17 Nov 2023 |
| Sanctioned Plan 6File: Point 30 STRR 14th Floor Simplex Floor Plan.pdf | 17 Nov 2023 |
| Water NOCFile: Point 36 - Water NOC.pdf | 17 Nov 2023 |
| Fire NOCFile: Point 37 - Fire Noc.pdf | 17 Nov 2023 |
| Proforma of Allotment LetterFile: Point 40 - Proforma Allotment Letter.pdf | 17 Nov 2023 |
| Proforma of Agreement of SaleFile: Point 41 - Proforma of Agreement of Sale.pdf | 17 Nov 2023 |
| STP Design DrawingFile: Point 43 - STP 130KLD.pdf | 17 Nov 2023 |
| Project Name & Address Notarized AffidavitFile: Point 45 Notorised Affidavit.pdf | 17 Nov 2023 |
| Financials Balance Sheet - 2021-22File: Point 2 Financials fy 2021-22.pdf | 17 Nov 2023 |
| Financials Balance Sheet - 2022-23File: Point 2 Financials fy 2022-23.pdf | 17 Nov 2023 |
| Financials Balance Sheet - 2023-24File: Point 2 Financials fy 2023-24.pdf | 17 Nov 2023 |
| Chartered Accountant Certificate - in the RERA FormatFile: Point 5 Chartered Accountant Revised Certificate.pdf | 17 Nov 2023 |
| Souces of fundsFile: Sources of Funds.pdf | 17 Nov 2023 |
| Partner Chethan ITR AY 22-23File: CHETHAN ITR AY 22-23.pdf | 17 Nov 2023 |
| chethan provisional 23-24File: chethan provisional 23-24.pdf | 17 Nov 2023 |
| Chethan Networth certificateFile: Chethan Networth certificate.pdf | 17 Nov 2023 |
| Tower wise inventory details updatedFile: Tower wise inventory details updated.xlsx | 17 Nov 2023 |
| Floor wise Tower details updatedFile: Floor wise Tower details updated.xlsx | 17 Nov 2023 |
| Aiikya RERA workingFile: Aiikya RERA working.xlsx | 17 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Aiikya Village Sarjapur on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 27 registered projects within 2 km.
Nambiar District 25 Phase 3
Nambiar EnsembleResidential Projects LLP
Meridian Park Phase II @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase I @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase III @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Nambiar District 25 Phase 2
Nambiar EnsembleResidential Projects LLP
SEVEN SARJAPUR
FORTUNE PRIMERO LLP
See every Bengaluru Urban project, with the district possession charts
Builder: Aiikya Village Sarajapur LLP
Aiikya Village Sarajapur LLP has 1 registration on RERA Karnataka, including Aiikya Village Sarjapur. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Aiikya Village Sarjapur is delayed beyond 26 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Aiikya Village Sarjapur?
The registered promoter entity is Aiikya Village Sarajapur LLP, a partnership firm as per the filing. Its LLPIN AAW-9936 and GSTIN 29ABVFA4243M1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Aiikya Village Sarjapur?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Aiikya Village Sarjapur?
The professionals named in the filing: Architect: Srinath .R. Advani (Advani and Associates); Engineer: Rajesh M H; Chartered Accountant: V Sagar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aiikya Village Sarjapur?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback