Registration approved No litigation declared Residential/Group Housing project

ADARSH PARADISE

By A1 BUILDERS

RG-KA-77467 · RERA PRM/KA/RERA/1250/304/PR/130723/006063 · Last updated on RERA Karnataka portal: 14 Jul 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
9 of 17Construction stages donefurthest along: Joinery: Doors, 90%
153 of 238Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 112 documents Report an error

ADARSH PARADISE is a Residential/Group Housing project by A1 BUILDERS in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/130723/006063 on 13 Jul 2023. Possession is promised by 31 Dec 2026. 85 of the 238 units on this registration are recorded sold or booked, and 9 of 17 construction stages are filed complete.

At a glance

Project

  • NameADARSH PARADISE
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 562114
  • Pincode562114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/130723/006063
  • ReraGenie IDRG-KA-77467

Builder

  • NameA1 BUILDERS
  • Entity typeProprietorship Firm
  • GSTIN29AOZPK4724N2ZV
  • Authorized SignatoryK H KRISHNA MURTHY

Key dates

this monthRegisteredJul 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on13 Jul 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed112 files

Current status

36%85 of 238 units booked
130.9%Of the estimated cost spent so far

Figures as on 14 Jul 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Adarsh Paradise---2380238

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 17 construction stages are filed complete. The stage furthest along is Joinery: Doors, at 90%.

Building: 91% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc90%
Basic work of Water supply, Sanitary and Electrification80%
Dadoing, Skirting, Flooring, Tiles work (All types)90%
Railing and Grill fixing80%
Electrification, Water supply and Sanitary Finishing80%
Painting80%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work90%
Internal and External work including landscapes as per sanctioned drawings50%

Progress on shared amenities40

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes80%
Sewage and Drainage SystemYes90%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes90%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes70%
Storm water drainsYes85%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes100%
Parks & Tree plantingYes30%
Street LightingNoNot applicable
ElectricityYes80%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes30%
Club HouseYes60%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes20%
ParksYes30%
Power BackupYes80%
Piped GasNoNot applicable
Water and SanitationYes70%
Air ConditioningNoNot applicable
StaircasesYes90%
LiftsYes60%
Corridor/LobbiesYes80%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes80%
BasementYes90%
TerraceYes90%
Outer WallYes100%
Open parking areasYes80%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes50%
Common storage spacesNoNot applicable

Land and ownership18

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,836 sq m
Named landowners18
LandownerVillageDistrict
S.H.KRISHNAPPA S/o Late Hanumanthappa--
C.Venkataraju S/o.Late Chikkamunishamappa S/o.Late Hanumanthappa--
C.Chandrashekar S/o. Late Chikkamunishamappa S/o.Late Hanumanthappa--
C.Giriraja Gowda S/o.Late Chikkamunishamappa S/o.Late Hanumanthappa--
M.Jayadeva S/o. . Late Munibachappa S/o.Late Hanumanthappa--
M.Anjinappa S/o. . Late Munibachappa S/o.Late Hanumanthappa--
Ramaiah S/o.Late Hanumanthappa--
K.N.Chinna Reddy S/o. Late Nagappa Reddy--
Navya Shree.C D/o. K.N.Chinna Reddy--
K.N.Revanna S/o.Late Nagappa Reddy--
Keerthi Shree.K.R D/o K.N.Revanna--
C.Giriraja Gowda S/o.Late Chikkamunishamappa S/o.Late Hanumanthappa--
S.H.Krishnappa S/o.Late.Hanumanthappa--
C.Venkataraju S/o.Late Chikkamunishamappa S/o.Late Hanumanthappa--
C.Chandrashekar S/o. Late Chikkamunishamappa S/o.Late Hanumanthappa--
M.Anjinappa S/o. Late Munibachappa S/o.Late Hanumanthappa--
M.Jayadeva S/o. Late Munibachappa S/o.Late Hanumanthappa--
Ramaiah S/o.Late Hanumanthappa--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 30.15 cr
Cost incurredRs 39.46 cr
Spent of the estimate130.91%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 29.11 crRs 35.96 cr
On-site expenditure-Consultants FeesRs 56.52 lakhRs 3.50 cr
Permissions & LicensesRs 32.38 lakh-
On-site expenditure-Site OverheadRs 14.49 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTNS Chakravarthi
EngineerPrakash Shantaram Kamble
Chartered AccountantA.Chiranjeevi

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed112

As listed on the registration, under the names the promoter filed them with; the newest 80 of 112 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/130723/006063 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Cert - Adarsha - Q1 of 2026-27.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form5, Q1,2026-27,Adarsh Paradise.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Eng Cert - Adarsha - June 26.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 of Q4 -2025-26.pdf5 May 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Arc Cert - Q4 2025-26 - Adarsha Paradise.pdf5 May 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q4 2025-26 - Adarsh Paradise.pdf5 May 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q3.pdf5 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form5,Q3.pdf5 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q3.pdf5 Feb 2026
Krishna Murthy Financials documents FY 2021-22File: 1 Krishna Murthy Financials documents FY 2021-22.pdf11 Jul 2023
Krishna Murthy Financials documents FY 2020-21File: 2 Krishna Murthy Financials documents FY 2020-21.pdf11 Jul 2023
ITR 2019-20File: 3 ITR 2019-20.pdf11 Jul 2023
Krishna Murthy Financials documents FY 2021-22File: 1 Krishna Murthy Financials documents FY 2021-22.pdf30 Jun 2023
Krishna Murthy Financials documents FY 2020-21File: 2 Krishna Murthy Financials documents FY 2020-21.pdf30 Jun 2023
ITR 2019-20File: 3 ITR 2019-20.pdf30 Jun 2023
Source of Funds with supporting documentsFile: 5 Source of Funds with supporting documents.pdf30 Jun 2023
Charted Accountant MembershipFile: 6 Charted Accountant Membership.pdf30 Jun 2023
GST REGISTRATION CERTIFICATEFile: 8 GST REGISTRATION CERTIFICATE.pdf30 Jun 2023
Trade LicenseFile: 9 Trade License.pdf30 Jun 2023
Updated Area StatementFile: 10 Updated Area Statement.pdf30 Jun 2023
Clarification on FARFile: 11 Clarification on FAR.pdf30 Jun 2023
Legible Development Plan BMRDAFile: 12 Development Plan BMRDA.pdf30 Jun 2023
RTC, survey 90/3-
Mutation, survey 90/3-
Encumbrance Certificate, survey 90/3-
Conversion/Alienation Order, survey 90/3-
Sale/Title/Gift Deed, survey 90/3-
JDA, survey 90/3-
Khatha, survey 90/3-
RTC, survey 91/2-
Mutation, survey 91/2-
Encumbrance Certificate, survey 91/2-
Conversion/Alienation Order, survey 91/2-
Sale/Title/Gift Deed, survey 91/2-
JDA, survey 91/2-
Khatha, survey 91/2-
Registration CertificateFile: Trade License.pdf-
Certificate issued by CA Form 1File: Form-1 Chartered Account.pdf-
Certificate issued by Architect Form 2File: Form-2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation Affidavit.pdf-
Certificate from Chartered AccountFile: Form-1 Chartered Account.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2021-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2020-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2019-20.pdf-
Plan License-
ELECTICITY NOC-
WATER NOC-
Building Plan-
Development Plan-
Development Plan-
Project Specification-
DWG 4_Layout_Layout1_HSK_LBPAS_10315_21_22_BP-
Project Specification-
Structural Stability Certificate-
Legal Opinion-
JDA and GPA-
Panchayath Partion deed 25-07-1990 90-3 and 91-2-
Proforma Agreement of Sale-
Proforma Allotment Letter-
Form-B Affidavit-
Sec 3(1) Affidavit-
JDA Affidavit-
ELECTICITY NOC-
WATER NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Bengaluru Rural

36%of this project is bookeddistrict median 45%
20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep ADARSH PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmADARSH PARADISEOther 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: A1 BUILDERS

A1 BUILDERS has 1 registration on RERA Karnataka, including ADARSH PARADISE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if ADARSH PARADISE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ADARSH PARADISE?

The registered promoter entity is A1 BUILDERS, a proprietorship firm as per the filing. Its GSTIN 29AOZPK4724N2ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ADARSH PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ADARSH PARADISE?

The professionals named in the filing: Architect: TNS Chakravarthi; Engineer: Prakash Shantaram Kamble; Chartered Accountant: A.Chiranjeevi. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADARSH PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADARSH PARADISE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADARSH PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.