ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / ABHEE CITY URBAN GLENN PHASE I

Registration approved No litigation declared Residential/Group Housing project

ABHEE CITY URBAN GLENN PHASE I

By ABHEE VENTURES PRIVATE LIMITED

RG-KA-14187 · RERA PRM/KA/RERA/1251/308/PR/250826/008887 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2033Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 0%
566 of 566Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 189 documents Report an error

ABHEE CITY URBAN GLENN PHASE I is a Residential/Group Housing project by ABHEE VENTURES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/250826/008887 on 25 Aug 2026. Possession is promised by 31 Dec 2033. 0 of the 566 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameABHEE CITY URBAN GLENN PHASE I
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560087
  • Pincode560087
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/250826/008887
  • ReraGenie IDRG-KA-14187

Builder

  • NameABHEE VENTURES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45203KA2021PTC153091
  • GSTIN29AAVCA9517E1Z5
  • Authorized SignatoryR Nagaraja Reddy
  • Managing DirectorR Nagaraja Reddy
  • DirectorsR Nagaraja Reddy, Amaravthi R
  • Project HeadAnanda Kumar
  • Other registrations8 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2026PromisedDec 2033

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 Aug 2026
  • Promised completion31 Dec 2033
  • Revised completionNone
  • Buildings3 building records
  • Documents filed189 files

Current status

0%0 of 566 units booked
2.9%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower-4---2140214
Tower-5---2140214
Tower-6---1380138

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work0%
Foundation footing work0%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership36

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area24,504 sq m
Named landowners36
LandownerVillageDistrict
VENKATASWAMY--
MANJULA--
PUSHPA--
DHANARAJ D.V--
L. SHASHIDHAR--
H.N. LAKSHMAMMA--
ASHWIN D.S--
SAHANASHREE H.N--
RAMOJI GOWDA--
MANJULA N--
BHARANI B--
LOKESH N--
SUDHAKAR K.R--
GEETHA K S--
D.N. KUMAR--
VANITHA--
KUMAR K TEJAS REDDY--
D.N. PRABHAKAR--
KUMARI VARSHA P--
D.N. KRISHNAPPA--
MAMATHA S--
PRABHOD K--
MASTER. PARTHIV K. REDDY--
D.N. GEETHA--
D.N. NAGAMANI--
A. SOMASHEKAR REDDY--
SHARADAMMA--
LAKSHMI D.S--
YUKTHA R--
LIKITHA R--
LOKESH S--
VINUTHA S--
AKSHAY L--
HARISH S--
SHRUTHI R--
MASTER. ATHISH KIRAN REDDY--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 465.08 cr
Cost incurredRs 13.50 cr
Spent of the estimate2.9%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 315.87 crRs 5.00 cr
Payment of taxesRs 67.53 crRs 90.00 lakh
On-site expenditure-Site OverheadRs 53.29 crRs 7.00 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 22.40 cr-
On-site expenditure-Consultants FeesRs 5.99 crRs 60.00 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRSP Design Consultants (India) Pvt Ltd
EngineerDESIGNTREE SERVICE CONSULTANTS PVT LTD
Chartered AccountantV Raveendra Reddy

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed189

As listed on the registration, under the names the promoter filed them with; the newest 80 of 189 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/250826/008887 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 UG-1 Q2.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architecture Certificate Q2 26-27 P-1.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate Q2 26-27 P-1.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Podi MR from 126 to 126/1 and 5File: MR T71-2023-24.pdf12 Aug 2026
Partition MR in sr no 30 showing flow of title to the current ownerFile: MR 01-2001-02.pdf12 Aug 2026
MR showing flow of title tot he current owner in sr no 20/1 and 20/2.File: MR 20-1 & 2 Merged.pdf12 Aug 2026
EC from 2004 to 2026 for Sy No 20. Sy No 20 podied into 20/1 in the year 2024. Hence EC from 2024File: EC 2004 to 2026-Sy No 20 & 20-1.pdf12 Aug 2026
EC from 2004 to 2026 for Sy No 20. Sy No 20 podied into 20/2 in the year 2024. Hence EC from 2024File: EC 2004 to 2026-Sy No 20 & 20-2.pdf12 Aug 2026
EC from 2004 to till date for Sy No 30File: EC 2004 to 2026, 30.pdf12 Aug 2026
EC from 2004 to till date for Sy No 32File: EC 2004 to 2026-32.pdf12 Aug 2026
EC from 2004 to till date for Sy No 126/5File: EC 2004 to 2026 126-5.pdf12 Aug 2026
Undertaking Affidavit and Acknowledgment for E khataFile: Affidavit Katha & Ackn.pdf12 Aug 2026
Declaration affidavit wrt phasesFile: Affidavit Cum Declaration.pdf12 Aug 2026
Undertaking Affidavit and Acknowledgment for Building LicenseFile: Affidavit Building License & Ackn.pdf12 Aug 2026
Undertaking Affidavit for Commencement certificate.File: Affidavit Commenecement Certificate.pdf12 Aug 2026
Undertaking Affidavit and Acknowledgment for KSPCB NOCFile: Affidavit KSPCB NOC-merged.pdf12 Aug 2026
Approval/NOC under section 14 of the KTCP Act from competent Authority for Sy 20,30,32,126/1(126/5)File: CLU Order Sy no 20,30,32,126-1(126-5).pdf12 Aug 2026
Declaration for Project address as per approved plan. (Sy.Nos)File: Decalration for project address Phase 1 & 2.pdf12 Aug 2026
Phase wise bifurcated declaration with signature which should contain area details,tower detailsFile: Phasewise Bifurcation Declaration.pdf12 Aug 2026
Proforma of agreement (AFS) for sale with clearly mentioning all the clauses/sections as per the RERFile: Agreement of Sale Proforma Phase 1.pdf12 Aug 2026
Undertaking Affidavit and Acknowledgment for HAL NOC.File: Affidavit HAL, Ackn, Receipt.pdf12 Aug 2026
Number of units in tower 4,5 & 6,its not matching to approved planFile: UNIT BIFURCATION DECLARATION -PHASE 1.pdf12 Aug 2026
Brief project estimation with licenced engineer signatureFile: PROJECT ESTIMATION PHASE 1.pdf12 Aug 2026
STP drawing duly mentioing the project name and address certified by the EngineerFile: 900 KLD STP LAYOUT.PDF12 Aug 2026
Land cost calculation sheet as per the guidance value(Self-attested copy) along with guidance certifFile: Land cost calculation sheet as per the guidance value(Self-attested copy) along with guida12 Aug 2026
Single Plot layout/Development plan order Approved by the competent authorityFile: DLP-38 TC Halli order.pdf12 Aug 2026
Sanctioned Plan approved orderFile: Tower 4,5,6,11,12,13,14 Sanction Order.pdf12 Aug 2026
PHASE 1 DEMARKATIONFile: PHASE 1 DEMARKATION.pdf12 Aug 2026
DEVELOPMENT PLANFile: DEVELOPMENT PLAN.pdf12 Aug 2026
DLP-38 TC Halli orderFile: DLP-38 TC Halli order.pdf12 Aug 2026
SITE PLANFile: 1-SITE PLAN.pdf12 Aug 2026
GROUND FLOOR PLANSFile: 2-GROUND FLOOR PLANS.pdf12 Aug 2026
BASEMENT 1File: 3-BASEMENT 1.pdf12 Aug 2026
BASEMENT 2File: 4-BASEMENT 2.pdf12 Aug 2026
Abhee TC halli Sanction OrderFile: Abhee TC halli Sanction Order.pdf12 Aug 2026
ELEVATIONSFile: ELEVATIONS.pdf12 Aug 2026
SECTIONSFile: SECTIONS -.pdf12 Aug 2026
TOWER 4File: TOWER 4.pdf12 Aug 2026
TOWER 5File: TOWER 5.pdf12 Aug 2026
TOWER 6File: TOWER 6.pdf12 Aug 2026
TOWER 11File: TOWER 11.pdf12 Aug 2026
TOWER 12 FLOOR PLANSFile: TOWER 12 FLOOR PLANS.pdf12 Aug 2026
TOWER 12 TERRACEFile: TOWER 12 TERRACE.pdf12 Aug 2026
TOWER 13File: TOWER 13.pdf12 Aug 2026
TOWER 14File: TOWER 14.pdf12 Aug 2026
Annual audit report of the previous projectFile: ABHEE Aaria Form 7 @@.pdf30 Jul 2026
Quarterly report of the previous projectFile: Aaria Q4 2025-26.pdf30 Jul 2026
Legal Opinion Sy No 20-1 & 20-2File: Legal Opinion Sy No 20-1 & 20-2.pdf30 Jul 2026
Legal Opinion Sy No 30File: Legal Opinion Sy No 30.pdf30 Jul 2026
Legal Opinion Sy No 32File: Legal Opinion Sy No 32.pdf30 Jul 2026
Legal Opinion Sy No 126/5File: Legal Opinion Sy No 126-5.pdf30 Jul 2026
Allotment Letter Phase 1File: ALLOTMENT LETTER - PHASE 1.pdf30 Jul 2026
Affidavit for 3(1) voilationFile: Affidavit for 3(1) voilation.pdf30 Jul 2026
Affidavit for non litigationFile: Affidavit for non litigation.pdf30 Jul 2026
DeclarationFile: Declaration.pdf30 Jul 2026
Form- B Affidavit Cum declaration (2)File: Form- B Affidavit Cum declaration (2).pdf30 Jul 2026
Format-Affidavit for non litigation (2)File: Format-Affidavit for non litigation (2).pdf30 Jul 2026
JD Affidavit cum DeclarationFile: JD Affidavit cum Declaration .pdf30 Jul 2026
Water NocFile: Water NOC Merged.pdf30 Jul 2026
KSPCB NOCFile: ABHEE-NEXPLACE-CFE -EXP- ACK.pdf30 Jul 2026
SEIAA NOCFile: 5-MOEF NOC.pdf30 Jul 2026
Bescom NOCFile: 3-BESCOM NOC.pdf30 Jul 2026
HALFile: HAL.jpeg30 Jul 2026
DP PlanFile: DP Plan.pdf30 Jul 2026
Demarkation PlanFile: Demarkation Phase 1 Final.pdf30 Jul 2026
Stability Phase 1File: structural stability phase 1.pdf30 Jul 2026
ADLR Certified survey sketchFile: DLP-38 Chikkavaderapura & TC halli sketch.pdf30 Jul 2026
Site PlanFile: 1-site plan.pdf30 Jul 2026
Ground Floor PlanFile: 2-ground floor plan.pdf30 Jul 2026
Basement-1File: 3-basement-1.pdf30 Jul 2026
Basement-2File: 4-basement-2.pdf30 Jul 2026
Tower-4 Floor PlansFile: 5-tower 4.pdf30 Jul 2026
Tower-5 Floor PlansFile: 6-tower 5.pdf30 Jul 2026
Tower-6 Floor PlansFile: 7-tower-6.pdf30 Jul 2026

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationStatusPromisedDelivered
ABHEE AARIAABHEE AARIA, SY.NO:58/1, 58/2, 58/3, 58/4, 58/5, 58/6, 58/7, 58/9, 58/12, 58/13, 302/2, 302/3A1(NEW SY.NO.302/7), 302/3A2, 302/5 & 302/6, GUNJUR VILLAGE VARTHUR HOBLI, BANGALORE EAST TALUK, WARD NO.149, BANGALORE, BENGALURU NORTH, BENGALURU URBAN, KARNATAKA - 560087OngoingMay 2031Not due yet

How this compares with Bengaluru Urban

0%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ABHEE CITY URBAN GLENN PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmABHEE CITY URBAN GLENN POther 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: ABHEE VENTURES PRIVATE LIMITED

ABHEE VENTURES PRIVATE LIMITED has 9 registrations on RERA Karnataka, including ABHEE SRISHTI LAYOUT and ABHEE SERENITY SPRINGS. Its filings declare 5 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ABHEE CITY URBAN GLENN PHASE I is delayed beyond 31 Dec 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ABHEE CITY URBAN GLENN PHASE I?

The registered promoter entity is ABHEE VENTURES PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2021PTC153091 and GSTIN 29AAVCA9517E1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ABHEE CITY URBAN GLENN PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ABHEE CITY URBAN GLENN PHASE I?

The professionals named in the filing: Architect: RSP Design Consultants (India) Pvt Ltd; Engineer: DESIGNTREE SERVICE CONSULTANTS PVT LTD; Chartered Accountant: V Raveendra Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABHEE CITY URBAN GLENN PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABHEE CITY URBAN GLENN PHASE I. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABHEE CITY URBAN GLENN PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.