Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
ABHEE CITY URBAN GLENN PHASE I is a Residential/Group Housing project by ABHEE VENTURES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/250826/008887 on 25 Aug 2026. Possession is promised by 31 Dec 2033. 0 of the 566 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameABHEE CITY URBAN GLENN PHASE I
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560087
- Pincode560087
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/250826/008887
- ReraGenie IDRG-KA-14187
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on25 Aug 2026
- Promised completion31 Dec 2033
- Revised completionNone
- Buildings3 building records
- Documents filed189 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-4 | - | - | - | 214 | 0 | 214 |
| Tower-5 | - | - | - | 214 | 0 | 214 |
| Tower-6 | - | - | - | 138 | 0 | 138 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 0% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership36
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VENKATASWAMY | - | - |
| MANJULA | - | - |
| PUSHPA | - | - |
| DHANARAJ D.V | - | - |
| L. SHASHIDHAR | - | - |
| H.N. LAKSHMAMMA | - | - |
| ASHWIN D.S | - | - |
| SAHANASHREE H.N | - | - |
| RAMOJI GOWDA | - | - |
| MANJULA N | - | - |
| BHARANI B | - | - |
| LOKESH N | - | - |
| SUDHAKAR K.R | - | - |
| GEETHA K S | - | - |
| D.N. KUMAR | - | - |
| VANITHA | - | - |
| KUMAR K TEJAS REDDY | - | - |
| D.N. PRABHAKAR | - | - |
| KUMARI VARSHA P | - | - |
| D.N. KRISHNAPPA | - | - |
| MAMATHA S | - | - |
| PRABHOD K | - | - |
| MASTER. PARTHIV K. REDDY | - | - |
| D.N. GEETHA | - | - |
| D.N. NAGAMANI | - | - |
| A. SOMASHEKAR REDDY | - | - |
| SHARADAMMA | - | - |
| LAKSHMI D.S | - | - |
| YUKTHA R | - | - |
| LIKITHA R | - | - |
| LOKESH S | - | - |
| VINUTHA S | - | - |
| AKSHAY L | - | - |
| HARISH S | - | - |
| SHRUTHI R | - | - |
| MASTER. ATHISH KIRAN REDDY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 315.87 cr | Rs 5.00 cr |
| Payment of taxes | Rs 67.53 cr | Rs 90.00 lakh |
| On-site expenditure-Site Overhead | Rs 53.29 cr | Rs 7.00 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 22.40 cr | - |
| On-site expenditure-Consultants Fees | Rs 5.99 cr | Rs 60.00 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RSP Design Consultants (India) Pvt Ltd |
| Engineer | DESIGNTREE SERVICE CONSULTANTS PVT LTD |
| Chartered Accountant | V Raveendra Reddy |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed189
As listed on the registration, under the names the promoter filed them with; the newest 80 of 189 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/250826/008887 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 UG-1 Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architecture Certificate Q2 26-27 P-1.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate Q2 26-27 P-1.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Podi MR from 126 to 126/1 and 5File: MR T71-2023-24.pdf | 12 Aug 2026 |
| Partition MR in sr no 30 showing flow of title to the current ownerFile: MR 01-2001-02.pdf | 12 Aug 2026 |
| MR showing flow of title tot he current owner in sr no 20/1 and 20/2.File: MR 20-1 & 2 Merged.pdf | 12 Aug 2026 |
| EC from 2004 to 2026 for Sy No 20. Sy No 20 podied into 20/1 in the year 2024. Hence EC from 2024File: EC 2004 to 2026-Sy No 20 & 20-1.pdf | 12 Aug 2026 |
| EC from 2004 to 2026 for Sy No 20. Sy No 20 podied into 20/2 in the year 2024. Hence EC from 2024File: EC 2004 to 2026-Sy No 20 & 20-2.pdf | 12 Aug 2026 |
| EC from 2004 to till date for Sy No 30File: EC 2004 to 2026, 30.pdf | 12 Aug 2026 |
| EC from 2004 to till date for Sy No 32File: EC 2004 to 2026-32.pdf | 12 Aug 2026 |
| EC from 2004 to till date for Sy No 126/5File: EC 2004 to 2026 126-5.pdf | 12 Aug 2026 |
| Undertaking Affidavit and Acknowledgment for E khataFile: Affidavit Katha & Ackn.pdf | 12 Aug 2026 |
| Declaration affidavit wrt phasesFile: Affidavit Cum Declaration.pdf | 12 Aug 2026 |
| Undertaking Affidavit and Acknowledgment for Building LicenseFile: Affidavit Building License & Ackn.pdf | 12 Aug 2026 |
| Undertaking Affidavit for Commencement certificate.File: Affidavit Commenecement Certificate.pdf | 12 Aug 2026 |
| Undertaking Affidavit and Acknowledgment for KSPCB NOCFile: Affidavit KSPCB NOC-merged.pdf | 12 Aug 2026 |
| Approval/NOC under section 14 of the KTCP Act from competent Authority for Sy 20,30,32,126/1(126/5)File: CLU Order Sy no 20,30,32,126-1(126-5).pdf | 12 Aug 2026 |
| Declaration for Project address as per approved plan. (Sy.Nos)File: Decalration for project address Phase 1 & 2.pdf | 12 Aug 2026 |
| Phase wise bifurcated declaration with signature which should contain area details,tower detailsFile: Phasewise Bifurcation Declaration.pdf | 12 Aug 2026 |
| Proforma of agreement (AFS) for sale with clearly mentioning all the clauses/sections as per the RERFile: Agreement of Sale Proforma Phase 1.pdf | 12 Aug 2026 |
| Undertaking Affidavit and Acknowledgment for HAL NOC.File: Affidavit HAL, Ackn, Receipt.pdf | 12 Aug 2026 |
| Number of units in tower 4,5 & 6,its not matching to approved planFile: UNIT BIFURCATION DECLARATION -PHASE 1.pdf | 12 Aug 2026 |
| Brief project estimation with licenced engineer signatureFile: PROJECT ESTIMATION PHASE 1.pdf | 12 Aug 2026 |
| STP drawing duly mentioing the project name and address certified by the EngineerFile: 900 KLD STP LAYOUT.PDF | 12 Aug 2026 |
| Land cost calculation sheet as per the guidance value(Self-attested copy) along with guidance certifFile: Land cost calculation sheet as per the guidance value(Self-attested copy) along with guida | 12 Aug 2026 |
| Single Plot layout/Development plan order Approved by the competent authorityFile: DLP-38 TC Halli order.pdf | 12 Aug 2026 |
| Sanctioned Plan approved orderFile: Tower 4,5,6,11,12,13,14 Sanction Order.pdf | 12 Aug 2026 |
| PHASE 1 DEMARKATIONFile: PHASE 1 DEMARKATION.pdf | 12 Aug 2026 |
| DEVELOPMENT PLANFile: DEVELOPMENT PLAN.pdf | 12 Aug 2026 |
| DLP-38 TC Halli orderFile: DLP-38 TC Halli order.pdf | 12 Aug 2026 |
| SITE PLANFile: 1-SITE PLAN.pdf | 12 Aug 2026 |
| GROUND FLOOR PLANSFile: 2-GROUND FLOOR PLANS.pdf | 12 Aug 2026 |
| BASEMENT 1File: 3-BASEMENT 1.pdf | 12 Aug 2026 |
| BASEMENT 2File: 4-BASEMENT 2.pdf | 12 Aug 2026 |
| Abhee TC halli Sanction OrderFile: Abhee TC halli Sanction Order.pdf | 12 Aug 2026 |
| ELEVATIONSFile: ELEVATIONS.pdf | 12 Aug 2026 |
| SECTIONSFile: SECTIONS -.pdf | 12 Aug 2026 |
| TOWER 4File: TOWER 4.pdf | 12 Aug 2026 |
| TOWER 5File: TOWER 5.pdf | 12 Aug 2026 |
| TOWER 6File: TOWER 6.pdf | 12 Aug 2026 |
| TOWER 11File: TOWER 11.pdf | 12 Aug 2026 |
| TOWER 12 FLOOR PLANSFile: TOWER 12 FLOOR PLANS.pdf | 12 Aug 2026 |
| TOWER 12 TERRACEFile: TOWER 12 TERRACE.pdf | 12 Aug 2026 |
| TOWER 13File: TOWER 13.pdf | 12 Aug 2026 |
| TOWER 14File: TOWER 14.pdf | 12 Aug 2026 |
| Annual audit report of the previous projectFile: ABHEE Aaria Form 7 @@.pdf | 30 Jul 2026 |
| Quarterly report of the previous projectFile: Aaria Q4 2025-26.pdf | 30 Jul 2026 |
| Legal Opinion Sy No 20-1 & 20-2File: Legal Opinion Sy No 20-1 & 20-2.pdf | 30 Jul 2026 |
| Legal Opinion Sy No 30File: Legal Opinion Sy No 30.pdf | 30 Jul 2026 |
| Legal Opinion Sy No 32File: Legal Opinion Sy No 32.pdf | 30 Jul 2026 |
| Legal Opinion Sy No 126/5File: Legal Opinion Sy No 126-5.pdf | 30 Jul 2026 |
| Allotment Letter Phase 1File: ALLOTMENT LETTER - PHASE 1.pdf | 30 Jul 2026 |
| Affidavit for 3(1) voilationFile: Affidavit for 3(1) voilation.pdf | 30 Jul 2026 |
| Affidavit for non litigationFile: Affidavit for non litigation.pdf | 30 Jul 2026 |
| DeclarationFile: Declaration.pdf | 30 Jul 2026 |
| Form- B Affidavit Cum declaration (2)File: Form- B Affidavit Cum declaration (2).pdf | 30 Jul 2026 |
| Format-Affidavit for non litigation (2)File: Format-Affidavit for non litigation (2).pdf | 30 Jul 2026 |
| JD Affidavit cum DeclarationFile: JD Affidavit cum Declaration .pdf | 30 Jul 2026 |
| Water NocFile: Water NOC Merged.pdf | 30 Jul 2026 |
| KSPCB NOCFile: ABHEE-NEXPLACE-CFE -EXP- ACK.pdf | 30 Jul 2026 |
| SEIAA NOCFile: 5-MOEF NOC.pdf | 30 Jul 2026 |
| Bescom NOCFile: 3-BESCOM NOC.pdf | 30 Jul 2026 |
| HALFile: HAL.jpeg | 30 Jul 2026 |
| DP PlanFile: DP Plan.pdf | 30 Jul 2026 |
| Demarkation PlanFile: Demarkation Phase 1 Final.pdf | 30 Jul 2026 |
| Stability Phase 1File: structural stability phase 1.pdf | 30 Jul 2026 |
| ADLR Certified survey sketchFile: DLP-38 Chikkavaderapura & TC halli sketch.pdf | 30 Jul 2026 |
| Site PlanFile: 1-site plan.pdf | 30 Jul 2026 |
| Ground Floor PlanFile: 2-ground floor plan.pdf | 30 Jul 2026 |
| Basement-1File: 3-basement-1.pdf | 30 Jul 2026 |
| Basement-2File: 4-basement-2.pdf | 30 Jul 2026 |
| Tower-4 Floor PlansFile: 5-tower 4.pdf | 30 Jul 2026 |
| Tower-5 Floor PlansFile: 6-tower 5.pdf | 30 Jul 2026 |
| Tower-6 Floor PlansFile: 7-tower-6.pdf | 30 Jul 2026 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| ABHEE AARIA | ABHEE AARIA, SY.NO:58/1, 58/2, 58/3, 58/4, 58/5, 58/6, 58/7, 58/9, 58/12, 58/13, 302/2, 302/3A1(NEW SY.NO.302/7), 302/3A2, 302/5 & 302/6, GUNJUR VILLAGE VARTHUR HOBLI, BANGALORE EAST TALUK, WARD NO.149, BANGALORE, BENGALURU NORTH, BENGALURU URBAN, KARNATAKA - 560087 | Ongoing | May 2031 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ABHEE CITY URBAN GLENN PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Prestige Lavender Fields
Prestige Office Ventures
Brigade Sanctuary
Brigade Enterprises Ltd
MYHNA VISTARA
MYHNA PROPERTIES PRIVATE LIMITED
ABHEE AARIA
ABHEE VENTURES PRIVATE LIMITED
ABHEE CITY URBAN GLENN PHASE II
ABHEE VENTURES PRIVATE LIMITED
GODREJ PARK RETREAT
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: ABHEE VENTURES PRIVATE LIMITED
ABHEE VENTURES PRIVATE LIMITED has 9 registrations on RERA Karnataka, including ABHEE SRISHTI LAYOUT and ABHEE SERENITY SPRINGS. Its filings declare 5 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ABHEE CITY URBAN GLENN PHASE I is delayed beyond 31 Dec 2033?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ABHEE CITY URBAN GLENN PHASE I?
The registered promoter entity is ABHEE VENTURES PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2021PTC153091 and GSTIN 29AAVCA9517E1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ABHEE CITY URBAN GLENN PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ABHEE CITY URBAN GLENN PHASE I?
The professionals named in the filing: Architect: RSP Design Consultants (India) Pvt Ltd; Engineer: DESIGNTREE SERVICE CONSULTANTS PVT LTD; Chartered Accountant: V Raveendra Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ABHEE CITY URBAN GLENN PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback