Valid until 30 Jun 2023 Residential/Group Housing project

AARYA ELEGANCE

By SUDHAPATI DEVELOPERS PRIVATE LIMITED

RG-GJ-02563 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA03842/261018 · Last updated on GujRERA portal: 7 Nov 2022

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jun 2023Possession promisedno revision filed
33 of 33Construction stages doneacross 4 buildings; every applicable stage filed complete
1 of 231Units unsoldnot recorded sold or booked
Jump to the 45 documents Report an error

AARYA ELEGANCE is a Residential/Group Housing project by SUDHAPATI DEVELOPERS PRIVATE LIMITED in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA03842/261018 on 26 Oct 2018. Possession is promised by 30 Jun 2023. 230 of the 231 units on this registration are recorded sold or booked, and 33 of 33 construction stages are filed complete.

At a glance

Project

  • NameAARYA ELEGANCE
  • TypeResidential/Group Housing
  • Location
    • AARYA ELEGANCE
    • NEAR JASH PACKAGING
    • BEHIND BANCO COMPANY
    • PADRA ROAD
    • BIL
    • VADODARA.
    • Vadodara
    • 391410
  • Pincode391410
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA03842/261018
  • ReraGenie IDRG-GJ-02563

Builder

  • NameSUDHAPATI DEVELOPERS PRIVATE LIMITED
  • Entity typeCOMPANY
  • Other registrations7 more →

Key dates

this monthRegisteredOct 2018PromisedJun 2023

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2023
  • Registered on26 Oct 2018
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed45 files

Current status

100%230 of 231 units booked
87.7%Of the estimated cost spent so far

Figures as on 7 Nov 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A---28028
TOWER B---42042
TOWER C-D-E---77077
TOWER F-G-H---84084

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 7 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 4 buildings.

TOWER A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TOWER B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TOWER C-D-E100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TOWER F-G-H100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 7 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationYes100%
Use of renewable energyYes100%
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,899 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 19.24 cr
Cost incurredRs 16.87 cr
Spent of the estimate87.72%
BuildingWingEstimatedIncurred
TOWER ANARs 4.81 crRs 4.22 cr
TOWER BNARs 4.81 crRs 4.22 cr
TOWER C-D-ENARs 4.81 crRs 4.22 cr
TOWER F-G-HNARs 4.81 crRs 4.22 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN RASIKBHAI PATEL (SPACE PLUS)
EngineerVINUBHAI PATEL (ZARAN ASSOCIATES)

Documents filed45

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA03842/261018 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Nov 2022
Engineer's certificate (Form 2)7 Nov 2022
Engineer's certificate annexure7 Nov 2022
Accountant's certificate (Form 3)7 Nov 2022
Site photograph, TOWER A7 Nov 2022
Site photograph, TOWER B7 Nov 2022
Site photograph, TOWER C-D-E7 Nov 2022
Site photograph, TOWER C-D-E7 Nov 2022
Site photograph, TOWER C-D-E7 Nov 2022
Site photograph, TOWER F-G-H7 Nov 2022
Site photograph, TOWER F-G-H7 Nov 2022
Site photograph, TOWER F-G-H7 Nov 2022
RERA registration certificate26 Oct 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

100%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep AARYA ELEGANCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmAARYA ELEGANCEOther 229Dot size: filed unitsN

Filed coordinates, straight-line distance. 229 registered projects within 2 km.

Builder: SUDHAPATI DEVELOPERS PRIVATE LIMITED

SUDHAPATI DEVELOPERS PRIVATE LIMITED has 8 registrations on GujRERA, including AARYA ELEGANCE and AARYA ELITE PHASE-II. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if AARYA ELEGANCE is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of AARYA ELEGANCE?

The registered promoter entity is SUDHAPATI DEVELOPERS PRIVATE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in AARYA ELEGANCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AARYA ELEGANCE?

The professionals named in the filing: Architect: KIRAN RASIKBHAI PATEL (SPACE PLUS); Engineer: VINUBHAI PATEL (ZARAN ASSOCIATES). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARYA ELEGANCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARYA ELEGANCE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARYA ELEGANCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.