Home / Browse projects / Vadodara, Gujarat / Veda

Valid until 30 Jun 2018 Mixed Development project

Veda

By ALEMBIC LIMITED

RG-GJ-30979 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA00250/250917 · Last updated on GujRERA portal: 27 Jun 2018

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jun 2018Possession promisedno revision filed
18 of 54Construction stages doneacross 6 buildings; furthest along: Plinth, 95%
Jump to the 117 documents Report an error

Veda is a Mixed Development project by ALEMBIC LIMITED in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA00250/250917 on 25 Sep 2017. Possession is promised by 30 Jun 2018.

At a glance

Project

  • NameVeda
  • TypeMixed Development
  • Location
    • Veda
    • Canal Road
    • Nizampura
    • Chhani area
    • Chhani
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA00250/250917
  • ReraGenie IDRG-GJ-30979

Builder

  • NameALEMBIC LIMITED
  • Entity typeCOMPANY
  • Other registrations6 more →

Key dates

this monthRegisteredSep 2017PromisedJun 2018

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2018
  • Registered on25 Sep 2017
  • Promised completion30 Jun 2018
  • Revised completionNone
  • Buildings6 building records
  • Documents filed117 files

Current status

86.1%Of the estimated cost spent so far

Figures as on 27 Jun 2018, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A-----44
Tower B-----44
Tower C-----54
Tower D-----56
Tower E-----56
Tower F-----54

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 27 Jun 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 54 construction stages are filed complete across 6 buildings. The stage furthest along is Plinth, at 95%.

Tower A88%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth90%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats85%
Sanitary fittings within the flats90%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing75%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower B91%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth95%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats85%
Sanitary fittings within the flats90%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing85%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower C85%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats95%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower D85%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats95%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower E85%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats95%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower F85%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats95%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 27 Jun 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes95%
Water supplyYes85%
Sewerage (chamber, lines, septic tank, STP)Yes85%
Storm water drainsYes90%
Landscaping and tree plantingYes90%
Street lightingYes80%
Community buildingsYes98%
Treatment and disposal of sewage and sullage waterYes70%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes90%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes85%
Fire fightingYes95%
Drinking water facilitiesNoNot applicable
Emergency evacuationYes95%
Use of renewable energyNoNot applicable
SecurityYes90%
Letter boxYes80%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area30,928 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 40.05 cr
Cost incurredRs 34.49 cr
Spent of the estimate86.12%
BuildingWingEstimatedIncurred
Tower ANARs 6.67 crRs 5.75 cr
Tower BNARs 6.67 crRs 5.75 cr
Tower CNARs 6.67 crRs 5.75 cr
Tower DNARs 6.67 crRs 5.75 cr
Tower ENARs 6.67 crRs 5.75 cr
Tower FNARs 6.67 crRs 5.75 cr

Documents filed117

As listed on the registration, under the names the promoter filed them with; the newest 80 of 117 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA00250/250917 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)27 Jun 2018
Engineer's certificate (Form 2)27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower A27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower B27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower C27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower D27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower E27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018
Site photograph, Tower F27 Jun 2018

How this compares with Vadodara

23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep Veda on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Chhani2,900+ in Vadodara

2 kmVedaOther 163Dot size: filed unitsN

Filed coordinates, straight-line distance. 163 registered projects within 2 km.

Builder: ALEMBIC LIMITED

ALEMBIC LIMITED has 7 registrations on GujRERA, including Veda and VEDA II. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if Veda is delayed beyond 30 Jun 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Veda?

The registered promoter entity is ALEMBIC LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Veda?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Veda?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Veda. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Veda to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.