VASUDEVA APARTMENTS
RG-KA-75201 · RERA PRM/KA/RERA/1274/360/PR/050723/006038 · Last updated on RERA Karnataka portal: 20 Jun 2023
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
VASUDEVA APARTMENTS is a Residential/Group Housing project by VASUDEV DEVELOPERS in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/360/PR/050723/006038 on 5 Jul 2023. Possession is promised by 31 Dec 2024.
At a glance
Project
- NameVASUDEVA APARTMENTS
- TypeResidential/Group Housing
- Location
- Ankola
- Uttara Kannada
- PincodeNot stated
- RERA no.PRM/KA/RERA/1274/360/PR/050723/006038
- ReraGenie IDRG-KA-75201
Builder
- NameVASUDEV DEVELOPERS
- Entity typeProprietorship Firm
- GSTIN29ABCPN0306M1ZO
- Authorized SignatoryKAMALAKAR VASU NAYAK
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 Jul 2023
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings2 building records
- Documents filed119 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 20 | 0 | 20 |
| Tower B | - | - | - | 20 | 0 | 20 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 20 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 20 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Kamalakar Vasu Nayak | - | - |
| Kamalakar Vasu Nayak | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 8.05 cr | - |
| On-site expenditure-Consultants Fees | Rs 5.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rammanohar Nayak |
| Engineer | Suraj Panduranga naik |
| Chartered Accountant | Ullas K Anavekar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed119
As listed on the registration, under the names the promoter filed them with; the newest 80 of 119 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/360/PR/050723/006038 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Balance Sheet 2021-22File: 1 Balance Sheet 2021-22.pdf | 20 Jun 2023 |
| Balance Sheet 2020-21File: 2 Balance Sheet 2020-21.pdf | 20 Jun 2023 |
| Balance Sheet 2019-20File: 3 Balance Sheet 2019-20.pdf | 20 Jun 2023 |
| Source of Funds with supporting documentsFile: 4 Source of Funds with supporting documents.pdf | 20 Jun 2023 |
| EC_2007-2023File: 5 EC_2007-2023.pdf | 20 Jun 2023 |
| Mother Deed of 11-22 11-26File: 6 Mother Deed of 11-22 11-26.pdf | 20 Jun 2023 |
| Phodi MR CopyFile: 7 Phodi MR Copy.pdf | 20 Jun 2023 |
| 8 Single Plot Layout | 20 Jun 2023 |
| Single Plot Sanction LetterFile: 9 Single Plot Sanction Letter.pdf | 20 Jun 2023 |
| Area StatementFile: 10 Area Statement.pdf | 20 Jun 2023 |
| CDP ClarificationFile: 11 CDP Clarification.jpeg | 20 Jun 2023 |
| Village Map demarcationFile: 12 Village Map demarcation.pdf | 20 Jun 2023 |
| Architect LicenceFile: 13 Architect Licence.pdf | 20 Jun 2023 |
| Relinquishment DeedFile: 14 Relinquishment Deed.pdf | 20 Jun 2023 |
| Building LicenseFile: 15 Building License.pdf | 20 Jun 2023 |
| Clarification on Building License ValidityFile: 16 Clarification on Building License Validity.pdf | 20 Jun 2023 |
| Approved project planFile: 17 Approved project plan.pdf | 20 Jun 2023 |
| 18 Clarification on KSPCB NOC and ACK | 20 Jun 2023 |
| Estimation ABSTRACTFile: 19 Estimation ABSTRACT.pdf | 20 Jun 2023 |
| Engineer licenseFile: 20 Engineer license.jpeg | 20 Jun 2023 |
| CLARIFICATION ON UNDIVIDED SHAREFile: 21 CLARIFICATION ON UNDIVIDED SHARE.pdf | 20 Jun 2023 |
| Electricity NOC with fee paid receiptFile: 22 Electricity NOC with fee paid receipt.pdf | 20 Jun 2023 |
| Water NOC with fee paid receiptFile: 23 Water NOC with fee paid receipt.pdf | 20 Jun 2023 |
| Septic Tank DemarcationFile: 24 Septic Tank Demarcation.pdf | 20 Jun 2023 |
| Affidavit Sec 3File: 25 Affidavit Sec 3.pdf | 20 Jun 2023 |
| FORM 6_ENGINEERS CERTIFICATEFile: 26 FORM 6_ENGINEERS CERTIFICATE.pdf | 20 Jun 2023 |
| Clarification on Area Height and Parking DetailsFile: 27 Clarification on Area Height and Parking Details.pdf | 20 Jun 2023 |
| RTC, survey 11/26 | - |
| Mutation, survey 11/26 | - |
| Encumbrance Certificate, survey 11/26 | - |
| Conversion/Alienation Order, survey 11/26 | - |
| Sale/Title/Gift Deed, survey 11/26 | - |
| Khatha, survey 11/26 | - |
| RTC, survey 11/22 | - |
| Mutation, survey 11/22 | - |
| Encumbrance Certificate, survey 11/22 | - |
| Conversion/Alienation Order, survey 11/22 | - |
| Sale/Title/Gift Deed, survey 11/22 | - |
| Khatha, survey 11/22 | - |
| Registration CertificateFile: GST Kamalakar Nayak.pdf | - |
| Certificate issued by CA Form 1File: Form-1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidavit Non litigation.pdf | - |
| Certificate from Chartered AccountFile: Form-1 CA Certificate.pdf | - |
| Balance Sheet 2021 - 2022File: Balance Sheet 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet 2020-21.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet 2019-20.pdf | - |
| Cash Flow Statement 2021 - 2022File: Statement of Income 2022-23.pdf | - |
| Cash Flow Statement 2020 - 2021File: Statement of Income 2019-20.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: ITR 21-22.pdf | - |
| Building License | - |
| Declaration Affidavit Electrical NOC_c | - |
| Declaration Affidavit Water NOC_c | - |
| Approved project plan | - |
| Approved project plan | - |
| Approved Plan | - |
| Project Specification | - |
| Approved project plan | - |
| Project Specification | - |
| Approved project plan | - |
| Structural Stability Certificate | - |
| legal Opinion | - |
| CDP Clarification | - |
| Title Deed_All | - |
| Proforma Sale Deed for RERA | - |
| Proforma Allotment letter_RERA | - |
| Affidavit Form B_c | - |
| Affidavit Sec 3 | - |
| Declaration Affidavit Electrical NOC_c | - |
| Declaration Affidavit Water NOC_c | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Uttara Kannada
Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.
Keep VASUDEVA APARTMENTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Uttara Kannada100+ in Uttara Kannada
Signature Apartment
VASANT CONSTRUCTIONS PRIVATE LIMITED
Nisarga Vastu City
MUNAF MOHAMMED SAB LANDAKANALLI
AL MARJAAN RESIDENCY
BRIGHT DEVELOPERS
Parijaat
Padmanabh Realtors
ASIYA BUSINESS PARK
ASIYA DEVELOPERS
ABHIMAN RESIDENCY AND COMMERCIAL COMPLEX
KALLUR DEVELOPERS
See every Uttara Kannada project, with the district possession charts
Builder: VASUDEV DEVELOPERS
VASUDEV DEVELOPERS has 1 registration on RERA Karnataka, including VASUDEVA APARTMENTS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Uttara Kannada district page.
Frequently asked questions
What are my rights if VASUDEVA APARTMENTS is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of VASUDEVA APARTMENTS?
The registered promoter entity is VASUDEV DEVELOPERS, a proprietorship firm as per the filing. Its GSTIN 29ABCPN0306M1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in VASUDEVA APARTMENTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at VASUDEVA APARTMENTS?
The professionals named in the filing: Architect: Rammanohar Nayak; Engineer: Suraj Panduranga naik; Chartered Accountant: Ullas K Anavekar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VASUDEVA APARTMENTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.