Home / Browse projects / Bengaluru Urban, Karnataka / TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3
TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3
By TRIFECTA PROJECTS PRIVATE LIMITED
RG-KA-90434 · RERA PRM/KA/RERA/1251/446/PR/060424/006778 · Last updated on RERA Karnataka portal: 4 Sep 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3 is a Residential/Group Housing project by TRIFECTA PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/060424/006778 on 6 Apr 2024. Possession is promised by 30 Sep 2026. 48 of the 49 units on this registration are recorded sold or booked, and 15 of 15 construction stages are filed complete.
At a glance
Project
- NameTRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560067
- Pincode560067
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/060424/006778
- ReraGenie IDRG-KA-90434
Builder
- NameTRIFECTA PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2012PTC062831
- GSTIN29AACCE9717F1ZG
- Authorized SignatoryVenkata Subbareddy
- Managing DirectorR V Subba Reddy
- DirectorsRV Subba Reddy, GEDI SYLENDRAKUMAR, SARADA REDDY RAMIREDDY
- Project HeadGEDI SYLENDRA KUMAR REDDY
- Other registrations5 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Apr 2024
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings2 building records
- Documents filed127 files
Current status
Figures as on 4 Sep 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 40 | 0 | 40 |
| B | - | - | - | 9 | 0 | 9 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 15 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 100% |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 100% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 100% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAMIREDDYVENKATA SUBBA REDDYRAMIREDDYVENKATA SUBBA REDDY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 53.51 cr | Rs 51.14 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 3.75 cr | Rs 2.70 cr |
| On-site expenditure-Consultants Fees | Rs 2.03 cr | Rs 2.05 cr |
| On-site expenditure-Salaries of workers | Rs 1.86 cr | Rs 1.85 cr |
| On-site expenditure-Site Overhead | Rs 1.86 cr | Rs 1.85 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 1.86 cr | Rs 1.85 cr |
| Payment of taxes | - | Rs 4.48 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | REVATHI S R |
| Engineer | Ramesh B |
| Chartered Accountant | B MANOHAR BABU |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed127
As listed on the registration, under the names the promoter filed them with; the newest 80 of 127 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/060424/006778 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Q1 - Row house-III.pdf | 4 Sep 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect RH-3, 30062026.pdf | 4 Sep 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer RH-3, 30062026.pdf | 4 Sep 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Q1 - Row house-III.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect RH-3, 30062026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer RH-3, 30062026.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA CERTIFICATE Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect RH-3, 31032026.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer RH-3, 31032026.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 RowHouse Phase 3 Q3.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect RH-3, 31122025.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer RH-3, 31122025.pdf | 13 Jan 2026 |
| Clarifiication for Annual Returns and Quarterly UpdatesFile: Clarifiication for Annual Returns and Quarterly Updates.pdf | 31 Mar 2024 |
| CA certificate with CA signatureFile: CA certificate with CA signature.pdf | 31 Mar 2024 |
| Bank account bank affidavitFile: Bank Affidavit.pdf | 31 Mar 2024 |
| sources of fund to completeFile: Source of Funds.pdf | 31 Mar 2024 |
| ECfrom 1-4-2007 to till dateFile: EC.pdf | 31 Mar 2024 |
| title deed of the land ownerFile: Title deed of the land owner.pdf | 31 Mar 2024 |
| notarized non-litigation affidavitFile: Affidivate non litigation.pdf | 31 Mar 2024 |
| notarized form-BFile: notarized form-B.pdf | 31 Mar 2024 |
| notaized JDcum affidavitFile: AFFIDAVIT CUM DECLARATION.pdf | 31 Mar 2024 |
| advocate search reportFile: Advocate search report.pdf | 31 Mar 2024 |
| approved planFile: Approved Plan.pdf | 31 Mar 2024 |
| Break up of types of units (BHK wise)File: Clarification for Inventory Breakup.pdf | 31 Mar 2024 |
| FAR As per the sanction plan is not matching with the details enteredFile: Clarification for FAR.pdf | 31 Mar 2024 |
| Single plot layoutFile: Single plot layout.pdf | 31 Mar 2024 |
| Single plot layout orderFile: Single plot layout Order.pdf | 31 Mar 2024 |
| certified carpet area calculationFile: Carpet Area Statement.pdf | 31 Mar 2024 |
| CDP map showing the proposed site. In partially residential park and open space upload CLFile: ROW HOUS PHASE-3 CDP MARKED.pdf | 31 Mar 2024 |
| Upload village map showing the proposed siteFile: Village male with site mark.pdf | 31 Mar 2024 |
| Area /number of units in KSPCB CFE. is not matching with sanction planFile: KSPCB NOC.pdf | 31 Mar 2024 |
| Area /number of units in KSPCB CFE. is not matching with sanction planFile: Sanction Plan.pdf | 31 Mar 2024 |
| Upload relinquishment deedFile: Relinquishment Deed.pdf | 31 Mar 2024 |
| Upload building licenseFile: Building license.pdf | 31 Mar 2024 |
| Upload Architects certificate with valid COA numberFile: Architects certificate with COA number.pdf | 31 Mar 2024 |
| Upload ZR copy for nala bufferFile: ZR.pdf | 31 Mar 2024 |
| Exclusive Common Area Allottee and Common Area Alloted To AssociationFile: Exclusive Common Area Allottee and Common Area Alloted To Association.pdf | 31 Mar 2024 |
| Area calculation sheet certified by the EngineerFile: Area calculation sheet certified by the Engineer.pdf | 31 Mar 2024 |
| upload the latest dated self attested copy of the Engineer license certificateFile: Self attested copy of the Engineer license certificate.pdf | 31 Mar 2024 |
| Updated Amenities and Common area details are incorrect. Please update the same properly as per theFile: Area calculation sheet certified by the Engineer.pdf | 31 Mar 2024 |
| Updated Amenities and Common area details are incorrect. Please update the same properly as per theFile: Exclusive Common Area Allottee and Common Area Alloted To Association.pdf | 31 Mar 2024 |
| upload the Engineer certificate in the prescribed formatFile: Form3 Trifecra verda phase 3.pdf | 31 Mar 2024 |
| upload the Certificate from Registered Engineer indicating the structural safety adopted for the proFile: STRUCTURAL STABILITY CERTI FICATE.pdf | 31 Mar 2024 |
| project name and project address and upload the project specification certified by the EngineerFile: Project specifications Trifecta verda en respolnder phase 3.pdf | 31 Mar 2024 |
| project name and project address and upload the section 3(1) notarized affidavit.File: Form B Notarized.pdf | 31 Mar 2024 |
| upload the brief estimated cost of construction certified by the EngineerFile: Brief Estimated cost of construction certified by the Engineer.pdf | 31 Mar 2024 |
| uploaded STP design drawing does not tally with the KPSCB NOC. Therefore Please upload the STP desigFile: KSPCB.pdf | 31 Mar 2024 |
| upload the self-attested copy of the NOC issued by BESCOM and BWSSB along with the copy of the fee rFile: self-attested copy of the NOC issued by BESCOM.pdf | 31 Mar 2024 |
| upload the self-attested copy of the NOC issued by BESCOM and BWSSB along with the copy of the fee rFile: self-attested copy of the NOC issued by Water NOC.pdf | 31 Mar 2024 |
| upload the Land cost calculation sheet as per the guidance value(self-attested copy)File: Land Calculation of as per Sub register Guidelines.pdf | 31 Mar 2024 |
| Please clarify the source of water supply to the project along with the supporting documents and phoFile: Water Source.pdf | 31 Mar 2024 |
| proforma of the Allotment letterFile: proforma of the Allotment letter.pdf | 31 Mar 2024 |
| proforma of the Agreement for SaleFile: proforma of the agreement for sale.pdf | 31 Mar 2024 |
| RTC, survey 123\2 | - |
| Mutation, survey 123\2 | - |
| Encumbrance Certificate, survey 123\2 | - |
| Conversion/Alienation Order, survey 123\2 | - |
| Sale/Title/Gift Deed, survey 123\2 | - |
| Khatha, survey 123\2 | - |
| Registration CertificateFile: Incorporation Certificate after change of name (1) (1).pdf | - |
| Certificate issued by CA Form 1File: Form 1.pdf | - |
| Certificate issued by Architect Form 2File: Form 2.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: WhatsApp Image.pdf | - |
| Certificate from Chartered AccountFile: Form 1.pdf | - |
| Balance Sheet 2022 - 2023File: TRIFECTA Balance Sheet-2023.pdf | - |
| Balance Sheet 2021 - 2022File: TRIFECTA Balance Sheet-2022.pdf | - |
| Balance Sheet 2020 - 2021File: TRIFECTA Balance Sheet-2021.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: TRIFECTA P-L-2023.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: TRIFECTA P_L -2022.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: TRIFECTA P_L -2021.pdf | - |
| Director's Report 2022 - 2023File: WhatsApp Image.pdf | - |
| Director's Report 2021 - 2022File: Directors Report 2022.pdf | - |
| Director's Report 2020 - 2021File: Direct Report 2021_compressed.pdf | - |
| Cash Flow Statement 2022 - 2023File: TRIFECTA CF 2022-23.pdf | - |
| Cash Flow Statement 2021 - 2022File: TRIFECTA CF 2021-22.pdf | - |
| Auditor's Report 2022 - 2023File: WhatsApp Image.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE- on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
DS MAX SKY FIELDS
DS Max Properties Private Limited
Sowparnika Rhythm of Rain
SOWPARNIKA HOMES PRIVATE LIMITED
WORLD OF GARDENS
RLP TRENDSQUARES PROJECTS PRIVATE LIMITED
DS MAX SKYSAMPURN
DS MAX PROPERTIES PRIVATE LIMITED
Amrutha Lake Vista
Amrutha Shelters Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: TRIFECTA PROJECTS PRIVATE LIMITED
TRIFECTA PROJECTS PRIVATE LIMITED has 6 registrations on RERA Karnataka, including Trifecta Veranza and TRIFECTA RETTO. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3 is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3?
The registered promoter entity is TRIFECTA PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062831 and GSTIN 29AACCE9717F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3?
The professionals named in the filing: Architect: REVATHI S R; Engineer: Ramesh B; Chartered Accountant: B MANOHAR BABU. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback