Home / Browse projects / Vadodara, Gujarat / Synnove Palladium

Valid until 30 Jun 2022 Residential/Group Housing project

Synnove Palladium

By SKY SEVEN INFRATECH PRIVATE LIMITED

RG-GJ-01229 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA02700/EX2/120122 · Last updated on GujRERA portal: 7 Mar 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • Separate project account declared
Jun 2022Possession promisedmoved 30 months from the original
22 of 22Construction stages doneacross 3 buildings; every applicable stage filed complete
0 of 144Units unsoldnot recorded sold or booked
Jump to the 40 documents Report an error

Synnove Palladium is a Residential/Group Housing project by SKY SEVEN INFRATECH PRIVATE LIMITED in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA02700/EX2/120122 on 19 May 2018. Possession is promised by 30 Jun 2022. The completion date has moved by 30 months from the original filing. 144 of the 144 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameSynnove Palladium
  • TypeResidential/Group Housing
  • Location
    • Synnove Palladium Block No. 202
    • TPS-2
    • Behind Nilamber Palms
    • Vadodara
    • Synnove Palladium Block No. 202
    • TPS-2
    • Behind Nilamber Palms
    • Vadodara
    • Bhayali
    • ...
  • Pincode391101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA02700/EX2/120122
  • ReraGenie IDRG-GJ-01229

Builder

  • NameSKY SEVEN INFRATECH PRIVATE LIMITED
  • Entity typeCOMPANY
  • Other registrations3 more →

Key dates

this monthRegisteredMay 2018First promiseDec 2019Revised toJun 2022

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2022
  • Registered on19 May 2018
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 31 Dec 2019)
  • Buildings3 building records
  • Documents filed40 files

Current status

100%144 of 144 units booked
100.0%Of the estimated cost spent so far

Figures as on 7 Mar 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A---48048
TOWER B---48048
TOWER C---48048

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 7 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 3 buildings.

TOWER A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TOWER B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TOWER C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 7 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,445 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 28.11 cr
Cost incurredRs 28.11 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
TOWER ANARs 9.37 crRs 9.37 cr
TOWER BNARs 9.37 crRs 9.37 cr
TOWER CNARs 9.37 crRs 9.37 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Studio Associates
EngineerZarna Associates

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/RAA02700/EX1/120220Applied Dec 2019; approved Feb 2020
PR/GJ/VADODARA/VADODARA/Others/RAA02700/EX2/120122Applied Jan 2022; approved Jan 2022

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA02700/EX2/120122 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Mar 2022
Engineer's certificate (Form 2)7 Mar 2022
Engineer's certificate annexure7 Mar 2022
Accountant's certificate (Form 3)7 Mar 2022
Site photograph, TOWER A7 Mar 2022
Site photograph, TOWER B7 Mar 2022
Site photograph, TOWER C7 Mar 2022
RERA registration certificate19 May 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

100%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 30 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep Synnove Palladium on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bhayali2,900+ in Vadodara

2 kmSynnove PalladiumOther 385Dot size: filed unitsN

Filed coordinates, straight-line distance. 385 registered projects within 2 km.

Builder: SKY SEVEN INFRATECH PRIVATE LIMITED

SKY SEVEN INFRATECH PRIVATE LIMITED has 4 registrations on GujRERA, including Synnove Palladium and SYNNOVE PALATIALS. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if Synnove Palladium is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Synnove Palladium?

The registered promoter entity is SKY SEVEN INFRATECH PRIVATE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Synnove Palladium?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Synnove Palladium?

The professionals named in the filing: Architect: Design Studio Associates; Engineer: Zarna Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Synnove Palladium?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Synnove Palladium. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Synnove Palladium to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.