Valid until 31 Jul 2028 Residential/Group Housing project

SWARNIM PALACE

By NAVYA INFRA

RG-GJ-90413 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RAA15473/080725/310328 · Last updated on GujRERA portal: 14 Feb 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jul 2028Possession promisedno revision filed
8 of 36Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 57%
11 of 14Units unsoldnot recorded sold or booked
Jump to the 46 documents Report an error

SWARNIM PALACE is a Residential/Group Housing project by NAVYA INFRA in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RAA15473/080725/310328 on 8 Jul 2025. Possession is promised by 31 Jul 2028. 3 of the 14 units on this registration are recorded sold or booked, and 8 of 36 construction stages are filed complete.

At a glance

Project

  • NameSWARNIM PALACE
  • TypeResidential/Group Housing
  • Location
    • NR.SHIVAM EXOTIKA DUPLEX
    • NEXT TO SWARNIM VILLA DUPLEX
    • THE GOLD CITY ROAD
    • TARSALI BYPASS ROAD
    • TARSALI
    • TARSALI
    • Vadodara
    • 390009
  • Pincode390009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RAA15473/080725/310328
  • ReraGenie IDRG-GJ-90413

Builder

  • NameNAVYA INFRA
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJul 2025PromisedJul 2028

Key facts

Registration and timeline

  • StatusValid until 31 Jul 2028
  • Registered on8 Jul 2025
  • Promised completion31 Jul 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed46 files

Current status

21%3 of 14 units booked
36.4%Of the estimated cost spent so far

Figures as on 14 Feb 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE A---303
TYPE AM---202
TYPE BM---404
TYPE B---505

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 14 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 57%.

TYPE A43%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, internal plaster, floorings, doors and windows within flats45%
Sanitary fittings within the flats25%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE AM39%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, internal plaster, floorings, doors and windows within flats35%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE BM48%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing40%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE B48%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure57%
Internal walls, internal plaster, floorings, doors and windows within flats48%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing40%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 14 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes30%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,742 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 3.67 cr
Cost incurredRs 1.34 cr
Spent of the estimate36.37%
BuildingWingEstimatedIncurred
TYPE BNARs 1.33 crRs 42.07 lakh
TYPE BMNARs 1.07 crRs 42.92 lakh
TYPE AMNARs 76.37 lakhRs 31.36 lakh
TYPE ANARs 50.92 lakhRs 17.17 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKirankumar Rasikbhai Ramjiyani
EngineerVINUBHAI RATILAL PATEL

Documents filed46

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RAA15473/080725/310328 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)14 Feb 2026
Architect's certificate (Form 1)13 Feb 2026
Engineer's certificate (Form 2)13 Feb 2026
Engineer's certificate annexure13 Feb 2026
Site photograph, TYPE A13 Feb 2026
Site photograph, TYPE AM13 Feb 2026
Site photograph, TYPE BM13 Feb 2026
Site photograph, TYPE B13 Feb 2026
RERA registration certificate8 Jul 2025
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Project photograph-
Proforma sale deed-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

21%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SWARNIM PALACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near TARSALI2,900+ in Vadodara

2 kmSWARNIM PALACEOther 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: NAVYA INFRA

NAVYA INFRA has 1 registration on GujRERA, including SWARNIM PALACE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SWARNIM PALACE is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SWARNIM PALACE?

The registered promoter entity is NAVYA INFRA, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SWARNIM PALACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SWARNIM PALACE?

The professionals named in the filing: Architect: Kirankumar Rasikbhai Ramjiyani; Engineer: VINUBHAI RATILAL PATEL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWARNIM PALACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWARNIM PALACE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWARNIM PALACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.