Home / Browse projects / Vadodara, Gujarat / akshar vintage

Valid until 31 Jul 2022 Mixed Development project

akshar vintage

By akshar construction

RG-GJ-87990 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA01597/EX1/090522 · Last updated on GujRERA portal: 27 Jul 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jul 2022Possession promisedmoved 12 months from the original
3054 of 3054Construction stages doneacross 356 buildings; every applicable stage filed complete
9 of 356Units unsoldnot recorded sold or booked
Jump to the 393 documents Report an error

akshar vintage is a Mixed Development project by akshar construction in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA01597/EX1/090522 on 12 Feb 2018. Possession is promised by 31 Jul 2022. The completion date has moved by 12 months from the original filing. 347 of the 356 units on this registration are recorded sold or booked, and 3054 of 3054 construction stages are filed complete.

At a glance

Project

  • Nameakshar vintage
  • TypeMixed Development
  • Location
    • akshar vintage
    • behind legen hotel NH 8
    • Tarsali
    • Vadodara
    • 390009
  • Pincode390009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA01597/EX1/090522
  • ReraGenie IDRG-GJ-87990

Builder

  • Nameakshar construction
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredFeb 2018First promiseJul 2021Revised toJul 2022

Key facts

Registration and timeline

  • StatusValid until 31 Jul 2022
  • Registered on12 Feb 2018
  • Promised completion31 Jul 2022
  • Revised completionRevised to 31 Jul 2022 (originally 31 Jul 2021)
  • Buildings356 building records
  • Documents filed393 files

Current status

97%347 of 356 units booked
100.0%Of the estimated cost spent so far

Figures as on 27 Jul 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---101
2---101
3---101
4---101
5---101
6---101
7---101
8---101
9---101
10---101
11---101
12---101
13---101
14---101
15---101
16---101
17---101
18---101
19---101
20---101
21---101
22---101
23---101
24---101
25---101
26---101
27---101
28---101
29---101
30---101
31---101
32---101
33---101
34---101
35---101
36---101
37---101
38---101
39---101
40---101
41---101
42---101
43---101
44---101
45---101
46---101
47---101
48---101
49---101
50---101
51---101
52---101
53---101
54---101
55---101
56---101
57---101
58---101
59---101
60---101
61---101
62---101
63---101
64---101
65---101
66---101
67---101
68---101
69---101
70---101
71---101
72---101
73---101
74---101
75---101
76---101
77---101
78---101
79---101
80---101
81---101
82---101
83---101
84---101
85---101
86---101
87---101
88---101
89---101
90---101
91---101
92---101
93---101
94---101
95---101
96---101
97---101
98---101
99---101
100---101
101---101
102---101
103---101
104---101
105---101
106---101
107---101
108---101
109---101
110---101
111---101
112---101
113---101
114---101
115---101
116---101
117---101
118---101
119---101
120---101
121---101
122---101
123---101
124---101
125---101
126---101
127---101
128---101
129---101
130---101
131---101
132---101
133---101
134---101
135---101
136---101
137---101
138---101
139---101
140---101
141---101
142---101
143---101
144---101
145---101
146---101
147---101
148---101
149---101
150---101
151---101
152---101
153---101
154---101
155---101
156---101
157---101
158---101
159---101
160---101
161---101
162---101
163---101
164---101
165---101
166---101
167---101
168---101
169---101
170---101
171---101
172---101
173---101
174---101
175---101
176---101
177---101
178---101
179---101
180---101
181---101
182---101
183---101
184---101
185---101
186---101
187---101
188---101
189---101
190---101
191---101
192---101
193---101
194---101
195---101
196---101
197---101
198---101
199---101
200---101
201---101
202---101
203---101
204---101
205---101
206---101
207---101
208---101
209---101
210---101
211---101
212---101
213---101
214---101
215---101
216---101
217---101
218---101
219---101
220---101
221---101
222---101
223---101
224---101
225---101
226---101
227---101
228---101
229---101
230---101
231---101
232---101
233---101
234---101
235---101
236---101
237---101
238---101
239---101
240---101
241---101
242---101
243---101
244---101
245---101
246---101
247---101
248---101
249---101
250---101
251---101
252---101
253---101
254---101
255---101
256---101
257---101
258---101
259---101
260---101
261---101
262---101
263---101
264---101
265---101
266---101
267---101
268---101
269---101
270---101
271---101
272---101
273---101
274---101
275---101
276---101
277---101
278---101
279---101
280---101
281---101
282---101
283---101
284---101
285---101
286---101
287---101
288---101
289---101
290---101
291---101
292---101
293---101
294---101
295---101
296---101
297---101
298---101
299---101
300---101
301---101
302---101
303---101
304---101
305---101
306---101
307---101
308---101
309---101
310---101
311---101
312---101
313---101
314---101
315---101
316---101
317---101
318---101
319---101
320---101
321---101
322---101
323---101
324---101
325---101
326---101
327---101
328---101
329---101
330---101
331---101
332---101
333---101
334---101
335---101
336---101
337---101
338---101
339---101
340---101
341---101
Shop 1---011
Shop 2---011
Shop 3---011
Shop 4---011
Shop 5---011
Shop 6---011
Shop 7---011
Shop 8---011
Shop 9---011
Shop 10---011
Shop 11---011
Shop 12---011
Shop 13---011
Shop 14---011
Shop 15---011

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 27 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 356 buildings; the table lists the first 20.

3054 of 3054 construction stages are filed complete across 356 buildings.

1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
4100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
5100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
6100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
7100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
8100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
9100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
10100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
11100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
12100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
13100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
14100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
15100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
16100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
17100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
18100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
19100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
20100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 27 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area33,386 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 18.10 cr
Cost incurredRs 18.10 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
1NARs 5.09 lakhRs 5.09 lakh
2NARs 5.09 lakhRs 5.09 lakh
3NARs 5.09 lakhRs 5.09 lakh
4NARs 5.09 lakhRs 5.09 lakh
5NARs 5.09 lakhRs 5.09 lakh
6NARs 5.09 lakhRs 5.09 lakh
7NARs 5.09 lakhRs 5.09 lakh
8NARs 5.09 lakhRs 5.09 lakh
9NARs 5.09 lakhRs 5.09 lakh
10NARs 5.09 lakhRs 5.09 lakh
11NARs 5.09 lakhRs 5.09 lakh
12NARs 5.09 lakhRs 5.09 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUCHIR SHETH
EngineerAASHOTOSH DESAI

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/MAA01597/EX1/090522Applied Mar 2022; approved May 2022

Documents filed393

As listed on the registration, under the names the promoter filed them with; the newest 80 of 393 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA01597/EX1/090522 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)27 Jul 2022
Engineer's certificate (Form 2)27 Jul 2022
Engineer's certificate annexure27 Jul 2022
Accountant's certificate (Form 3)27 Jul 2022
Site photograph, 21827 Jul 2022
Site photograph, 21927 Jul 2022
Site photograph, 22027 Jul 2022
Site photograph, 22127 Jul 2022
Site photograph, 22227 Jul 2022
Site photograph, 22327 Jul 2022
Site photograph, 22427 Jul 2022
Site photograph, 22527 Jul 2022
Site photograph, 22627 Jul 2022
Site photograph, 22727 Jul 2022
Site photograph, 22827 Jul 2022
Site photograph, 22927 Jul 2022
Site photograph, 23027 Jul 2022
Site photograph, 23127 Jul 2022
Site photograph, 23227 Jul 2022
Site photograph, 23327 Jul 2022
Site photograph, 23427 Jul 2022
Site photograph, 23527 Jul 2022
Site photograph, 23627 Jul 2022
Site photograph, 23727 Jul 2022
Site photograph, 23827 Jul 2022
Site photograph, 23927 Jul 2022
Site photograph, 24027 Jul 2022
Site photograph, 24127 Jul 2022
Site photograph, 24227 Jul 2022
Site photograph, 24327 Jul 2022
Site photograph, 24427 Jul 2022
Site photograph, 24527 Jul 2022
Site photograph, 24627 Jul 2022
Site photograph, 24727 Jul 2022
Site photograph, 24827 Jul 2022
Site photograph, 24927 Jul 2022
Site photograph, 25027 Jul 2022
Site photograph, 25127 Jul 2022
Site photograph, 25227 Jul 2022
Site photograph, 25327 Jul 2022
Site photograph, 25427 Jul 2022
Site photograph, 25527 Jul 2022
Site photograph, 25627 Jul 2022
Site photograph, 25727 Jul 2022
Site photograph, 25827 Jul 2022
Site photograph, 25927 Jul 2022
Site photograph, 26027 Jul 2022
Site photograph, 26127 Jul 2022
Site photograph, 26227 Jul 2022
Site photograph, 26327 Jul 2022
Site photograph, 26427 Jul 2022
Site photograph, 26527 Jul 2022
Site photograph, 26627 Jul 2022
Site photograph, 26727 Jul 2022
Site photograph, 26827 Jul 2022
Site photograph, 26927 Jul 2022
Site photograph, 27027 Jul 2022
Site photograph, 27127 Jul 2022
Site photograph, 27227 Jul 2022
Site photograph, 27327 Jul 2022
Site photograph, 27427 Jul 2022
Site photograph, 27527 Jul 2022
Site photograph, 27627 Jul 2022
Site photograph, 27727 Jul 2022
Site photograph, 27827 Jul 2022
Site photograph, 27927 Jul 2022
Site photograph, 28027 Jul 2022
Site photograph, 28127 Jul 2022
Site photograph, 28227 Jul 2022
Site photograph, 28327 Jul 2022
Site photograph, 28427 Jul 2022
Site photograph, 28527 Jul 2022
Site photograph, 28627 Jul 2022
Site photograph, 28727 Jul 2022
Site photograph, 28827 Jul 2022
Site photograph, 28927 Jul 2022
Site photograph, 29027 Jul 2022
Site photograph, 29127 Jul 2022
Site photograph, 29227 Jul 2022
Site photograph, 29327 Jul 2022

How this compares with Vadodara

97%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 12 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep akshar vintage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Tarsali2,900+ in Vadodara

2 kmakshar vintageOther 116Dot size: filed unitsN

Filed coordinates, straight-line distance. 116 registered projects within 2 km.

Builder: akshar construction

akshar construction has 1 registration on GujRERA, including akshar vintage. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if akshar vintage is delayed beyond 31 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of akshar vintage?

The registered promoter entity is akshar construction, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in akshar vintage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at akshar vintage?

The professionals named in the filing: Architect: RUCHIR SHETH; Engineer: AASHOTOSH DESAI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in akshar vintage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About akshar vintage. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save akshar vintage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.