ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / SUSHILA SADAN

Valid until 1 Mar 2021 Residential/Group Housing project

SUSHILA SADAN

By SHREE SIDDHIVINAYAK DEVELOPERS (SUSHILA SADAN)

RG-GJ-69578 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA03966/051118 · Last updated on GujRERA portal: 7 Jun 2019

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Mar 2021Possession promisedno revision filed
2 of 5Construction stages donefurthest along: Internal walls, 30%
Jump to the 36 documents Report an error

SUSHILA SADAN is a Residential/Group Housing project by SHREE SIDDHIVINAYAK DEVELOPERS (SUSHILA SADAN) in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA03966/051118 on 5 Nov 2018. Possession is promised by 1 Mar 2021.

At a glance

Project

  • NameSUSHILA SADAN
  • TypeResidential/Group Housing
  • Location
    • BORDI FALIYA
    • SHIYABAUG
    • Vadodara Kasba
    • Vadodara
    • 390001
  • Pincode390001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA03966/051118
  • ReraGenie IDRG-GJ-69578

Builder

  • NameSHREE SIDDHIVINAYAK DEVELOPERS (SUSHILA SADAN)
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredNov 2018PromisedMar 2021

Key facts

Registration and timeline

  • StatusValid until 1 Mar 2021
  • Registered on5 Nov 2018
  • Promised completion1 Mar 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed36 files

Current status

30.2%Of the estimated cost spent so far

Figures as on 7 Jun 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUSHILA SADAN-----24

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 7 Jun 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 5 construction stages are filed complete. The stage furthest along is Internal walls, at 30%.

SUSHILA SADAN: 49% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure7%
Internal walls, internal plaster, floorings, doors and windows within flats30%
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable

Progress on shared amenities19

As on 7 Jun 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsNoNot applicable
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingNoNot applicable
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area272 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.42 cr
Cost incurredRs 42.84 lakh
Spent of the estimate30.22%
BuildingWingEstimatedIncurred
SUSHILA SADANNARs 1.42 crRs 42.84 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD N KHARVA
EngineerDHRUMESH G SHAH

Documents filed36

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA03966/051118 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Jun 2019
Engineer's certificate (Form 2)7 Jun 2019
Site photograph, SUSHILA SADAN7 Jun 2019
RERA registration certificate5 Nov 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SUSHILA SADAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara Kasba2,900+ in Vadodara

2 kmSUSHILA SADANOther 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: SHREE SIDDHIVINAYAK DEVELOPERS (SUSHILA SADAN)

SHREE SIDDHIVINAYAK DEVELOPERS (SUSHILA SADAN) has 1 registration on GujRERA, including SUSHILA SADAN. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SUSHILA SADAN is delayed beyond 1 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SUSHILA SADAN?

The registered promoter entity is SHREE SIDDHIVINAYAK DEVELOPERS (SUSHILA SADAN), a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SUSHILA SADAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SUSHILA SADAN?

The professionals named in the filing: Architect: D N KHARVA; Engineer: DHRUMESH G SHAH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUSHILA SADAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUSHILA SADAN. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUSHILA SADAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.