ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / STAR RESIDENCY

Valid until 28 Jun 2026 Residential/Group Housing project

STAR RESIDENCY

By SAHARA DEVELOPERS

RG-GJ-12827 · RERA PR/GJ/VADODARA/PADRA/Others/RAA10752/101022 · Last updated on GujRERA portal: 10 Oct 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Jun 2026Possession promisedmoved 15 months from the original
25 of 45Construction stages doneacross 5 buildings; furthest along: Stilt Floor, 57%
10 of 24Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

STAR RESIDENCY is a Residential/Group Housing project by SAHARA DEVELOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/PADRA/Others/RAA10752/101022 on 10 Oct 2022. Possession is promised by 28 Jun 2026. The completion date has moved by 15 months from the original filing. 14 of the 24 units on this registration are recorded sold or booked, and 25 of 45 construction stages are filed complete.

At a glance

Project

  • NameSTAR RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • LAND BEARING RS 1018/B
    • CS NA 1018/2/B
    • MOJE PADRA
    • Padra
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/PADRA/Others/RAA10752/101022
  • ReraGenie IDRG-GJ-12827

Builder

  • NameSAHARA DEVELOPERS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredOct 2022First promiseMar 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusValid until 28 Jun 2026
  • Registered on10 Oct 2022
  • Promised completion28 Jun 2026
  • Revised completionRevised to 28 Jun 2026 (originally 31 Mar 2025)
  • Buildings5 building records
  • Documents filed38 files

Current status

58%14 of 24 units booked
4.8%Of the estimated cost spent so far

Figures as on 10 Oct 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE A---707
TYPE A1---14014
TYPE B---101
TYPE B1---101
TYPE B2---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building5

As on 10 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 45 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 57%.

TYPE A75%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor57%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats57%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing57%
TYPE A167%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing50%
TYPE B56%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE B156%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE B267%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 10 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes15%
Water supplyYes40%
Sewerage (chamber, lines, septic tank, STP)Yes40%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes35%
Plinth protectionYes15%
Water tankYes40%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,211 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 1.61 cr
Cost incurredRs 7.68 lakh
Spent of the estimate4.76%
BuildingWingEstimatedIncurred
TYPE ANARs 32.25 lakhRs 1.54 lakh
TYPE A1NARs 32.25 lakhRs 1.54 lakh
TYPE BNARs 32.25 lakhRs 1.54 lakh
TYPE B1NARs 32.25 lakhRs 1.54 lakh
TYPE B2NARs 32.25 lakhRs 1.54 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALTER ARCHITECTS
EngineerZARNA ASSOCIATES

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionApplied Mar 2025; no approval date filed

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/PADRA/Others/RAA10752/101022 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate10 Oct 2022
Engineer's certificate (Form 2)4 Aug 2022
Engineer's certificate annexure4 Aug 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

58%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 15 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep STAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmSTAR RESIDENCYOther 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: SAHARA DEVELOPERS

SAHARA DEVELOPERS has 1 registration on GujRERA, including STAR RESIDENCY. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if STAR RESIDENCY is delayed beyond 28 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of STAR RESIDENCY?

The registered promoter entity is SAHARA DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in STAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at STAR RESIDENCY?

The professionals named in the filing: Architect: ALTER ARCHITECTS; Engineer: ZARNA ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STAR RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.