Home / Browse projects / Bengaluru Urban, Karnataka / SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2
SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2
RG-KA-49107 · RERA PRM/KA/RERA/1251/446/PR/130924/007014 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2 is a Residential/Group Housing project by SRI VYSHNAVI INFRA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/130924/007014 on 13 Sep 2024. Possession is promised by 31 Dec 2028. 38 of the 48 units on this registration are recorded sold or booked, and 6 of 15 construction stages are filed complete.
At a glance
Project
- NameSRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560103
- Pincode560103
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/130924/007014
- ReraGenie IDRG-KA-49107
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on13 Sep 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 48 | 0 | 48 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 15 construction stages are filed complete. The stage furthest along is Plastering inside, at 70%.
Building: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 70% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 70% |
| Sewage and Drainage System | Yes | 90% |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 30% |
| Storm water drains | Yes | 55% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 90% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 30% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 60% |
| Lifts | Yes | 60% |
| Corridor/Lobbies | Yes | 60% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 100% |
| Terrace | Yes | 80% |
| Outer Wall | Yes | 70% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shobha S | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 20.26 cr | Rs 13.22 cr |
| Payment of taxes | Rs 3.30 cr | Rs 1.75 cr |
| On-site expenditure-Site Overhead | Rs 1.48 cr | Rs 3.55 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 32.50 lakh | Rs 1.08 cr |
| On-site expenditure-Salaries of workers | Rs 17.50 lakh | Rs 9.00 lakh |
| On-site expenditure-Consultants Fees | Rs 15.89 lakh | Rs 7.00 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 7.85 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Patchava Kalyan Chowdary |
| Engineer | S Gandhi |
| Chartered Accountant | Nirmala Sreenivasulu |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed114
As listed on the registration, under the names the promoter filed them with; the newest 80 of 114 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/130924/007014 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Final.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Infra Form 4_compressed.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4_compressed.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Vyshnavi_compressed.pdf | 21 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5.pdf | 21 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) Phase 2 Q3.pdf | 21 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 21 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 21 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 21 Jan 2026 |
| QR FOR ONGOING PROJECT NOT UPDATEDFile: quarterly upated with sign.pdf | 13 Aug 2024 |
| all the sources of funds to complete the projectFile: SOURCES OF FUNDS MERGED.pdf | 15 Jul 2024 |
| connected MR in favuor of landowner before conversionFile: connected MR in favuor of landowner before conversion.pdf | 15 Jul 2024 |
| connected MR in favuor of landowner before conversionFile: MR.pdf | 15 Jul 2024 |
| EC from 23-6-2023 to till dateFile: EC from 23-6-2023 to till date.pdf | 15 Jul 2024 |
| title deed of land owner shoba (gift deed )File: title deed of land owner.pdf | 15 Jul 2024 |
| title deed of land owner shoba (gift deed )File: Gift Deed & Rectification Deed_compressed.pdf | 15 Jul 2024 |
| 0-02 Guntas of B-kharab land cannot be used for the project , it shall be made available for publicFile: 0_02 guntas of kharab land.pdf | 15 Jul 2024 |
| 0-02 Guntas of B-kharab land cannot be used for the project , it shall be made available for publicFile: PRJ_0753_24-25 (1).pdf | 15 Jul 2024 |
| profit and loss account and balance sheet for 2020-21, 2021-22 & 2022-23 with CA UDIN and the scheduFile: BS 20-21.pdf | 3 Jul 2024 |
| profit and loss account and balance sheet for 2020-21, 2021-22 & 2022-23 with CA UDIN and the scheduFile: bs 21-22.pdf | 3 Jul 2024 |
| profit and loss account and balance sheet for 2020-21, 2021-22 & 2022-23 with CA UDIN and the scheduFile: Balance sheet With UDIN 22-23.pdf | 3 Jul 2024 |
| profit and loss account and balance sheet for 2020-21, 2021-22 & 2022-23 with CA UDIN and the scheduFile: P&l 20-21.pdf | 3 Jul 2024 |
| profit and loss account and balance sheet for 2020-21, 2021-22 & 2022-23 with CA UDIN and the scheduFile: p&L 21-22.pdf | 3 Jul 2024 |
| profit and loss account and balance sheet for 2020-21, 2021-22 & 2022-23 with CA UDIN and the scheduFile: P&L With UDIN 22-23.pdf | 3 Jul 2024 |
| All the sources of funds to complete the projectFile: Sources of funds.pdf | 3 Jul 2024 |
| update borrowing details in sources of funds and the CA certificateFile: Borrowing Details.pdf | 3 Jul 2024 |
| connected MR in favuor of landowner before conversionFile: MR.pdf | 3 Jul 2024 |
| defect free EC from 1-4-2008 to till date , with all transactions of the periodFile: EC_20240703110232.pdf | 3 Jul 2024 |
| title deed of the land ownerFile: landowner titledeed.pdf | 3 Jul 2024 |
| advocate search reportFile: Advocate Search Report.pdf | 3 Jul 2024 |
| Break up of types of units (BHK wise) not updatedFile: Flats Details.xlsx | 3 Jul 2024 |
| Single plot layoutFile: Single Plot Layout.pdf | 3 Jul 2024 |
| Single plot layout orderFile: Single Plot Layout Order.pdf | 3 Jul 2024 |
| certified carpet area calculationFile: Carpet Area Details certified by engineer.pdf | 3 Jul 2024 |
| Upload CLU orderFile: CLU Order.pdf | 3 Jul 2024 |
| village map showing the proposed siteFile: village map.pdf | 3 Jul 2024 |
| commencement certificateFile: Commencement Certificate_compressed.pdf | 3 Jul 2024 |
| Built up area / Number of units/ number of floors in the KSPCB NOC is not matching with the sanctionFile: KSPCB CFE.pdf | 3 Jul 2024 |
| building licenseFile: Builiding Licence.pdf | 3 Jul 2024 |
| ZR copy for nala bufferFile: ZR Copy.pdf | 3 Jul 2024 |
| latest dated self-attested copy of the Engineer license certificateFile: Engineer License self attested.pdf | 3 Jul 2024 |
| estimated cost of construction certified by the registered Civil EngineerFile: Estimated cost of construction certified by engineer.pdf | 3 Jul 2024 |
| project specification by incorporating the project Name and Project Address certified by the EngineeFile: Project Specifications certified by engineer.pdf | 3 Jul 2024 |
| upload the project section 3(1) notarized affidavitFile: Affidavit sec 3 With Ack No.pdf | 3 Jul 2024 |
| Complete copy of BESCOM NOCFile: Bescom_20240606163144.pdf | 3 Jul 2024 |
| STP design drawing certified by the EngineerFile: STP Drawings certified by Engineer.pdf | 3 Jul 2024 |
| Land cost calculation sheet as per the guidance value(Self-attested copy)File: Land cost as per Guidance Value.pdf | 3 Jul 2024 |
| Land cost calculation sheet as per the guidance value(Self-attested copy)File: guidance value.pdf | 3 Jul 2024 |
| upload the permision letter issued by the concerned Karnataka ground Water AuthorityFile: Borewell Permission.pdf | 3 Jul 2024 |
| Borrowing DetailsFile: Borrowing Details.pdf | 3 Jul 2024 |
| Registration fees paid are not matched as per total area measurementFile: Additional Fees Paid Challan.pdf | 3 Jul 2024 |
| RTC, survey SY NO 110/7 | - |
| Mutation, survey SY NO 110/7 | - |
| Encumbrance Certificate, survey SY NO 110/7 | - |
| Conversion/Alienation Order, survey SY NO 110/7 | - |
| JDA, survey SY NO 110/7 | - |
| Khatha, survey SY NO 110/7 | - |
| Registration CertificateFile: Registration Certificate.pdf | - |
| Partnership DeedFile: PARTNERSHIP DEED compressed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form 1.pdf | - |
| Certificate issued by Architect Form 2File: Architect certifivcate form 2.pdf | - |
| Certificate issued by Engineer Form 3File: Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sri Vyshnavi Brundavanam | Sy No. 110/5, Amani Bellandur Khane, Varthur Hobli, Bangalore East Taluk, Bangalore | Ongoing | Dec 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 15 registered projects within 2 km.
Adarsh Parkland Phase 2
SHIVAKAR INFRA PRIVATE LIMITED
Adarsh Parkland Phase 1
AKARSHA REALTY PRIVATE LIMITED
Sobha Neopolis Phase 3 - W 1, 2, 10 & 11
SOBHA LIMITED
Sobha Neopolis Phase 4 - 3, 4, 8 & 9
SOBHA LIMITED
Sobha Neopolis Phase 5 - W 5, 6 & 7
SOBHA LIMITED
Sobha Neopolis Phase 2 - W 12 & 13
SOBHA LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: SRI VYSHNAVI INFRA
SRI VYSHNAVI INFRA has 2 registrations on RERA Karnataka, including SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2 and VYSHNAVI BRUNDAVANAM. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2?
The registered promoter entity is SRI VYSHNAVI INFRA, a partnership firm as per the filing. Its GSTIN 29ADOFS9424P1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2?
The professionals named in the filing: Architect: Patchava Kalyan Chowdary; Engineer: S Gandhi; Chartered Accountant: Nirmala Sreenivasulu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SRI VYSHNAVI INFRA BRUNDAVANAM PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback