Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Neopolis Phase 4 - 3, 4, 8 & 9

Registration approved No litigation declared Residential/Group Housing project

Sobha Neopolis Phase 4 - 3, 4, 8 & 9

By SOBHA LIMITED

RG-KA-62854 · RERA PRM/KA/RERA/1251/446/PR/220923/006283 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 4 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2031Possession promisedno revision filed
2 of 18Construction stages donefurthest along: Upto Plinth Level, 65%
57 of 376Units unsoldnot recorded sold or booked
4Complaints at RERA Karnatakaon this registration
Jump to the 202 documents Report an error

Sobha Neopolis Phase 4 - 3, 4, 8 & 9 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/220923/006283 on 22 Sep 2023. Possession is promised by 31 Dec 2031. 319 of the 376 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSobha Neopolis Phase 4 - 3, 4, 8 & 9
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560103
  • Pincode560103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/220923/006283
  • ReraGenie IDRG-KA-62854

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryMr. Suresh Ganiga
  • Managing DirectorMr Jagadish Nangineni
  • DirectorMr Jagadish Nangineni
  • Project HeadsMr Praveen N K, Mr Ajith lal P G
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredSep 2023PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Sep 2023
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings4 building records
  • Documents filed202 files

Current status

85%319 of 376 units booked
24.4%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 3---1110111
Wing 4---76076
Wing 8---1110111
Wing 9---76076

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 18 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 65%.

Building: 27% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level65%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)3%
Retaining wall (All types)Not applicable
RCC or MS Framed structure62%
Masonry Construction20%
Plastering inside , outside & Ceiling21%
Joinery: Doors, Windows, Ventilators etc4%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)7%
Railing and Grill fixing44%
Electrification, Water supply and Sanitary Finishing1%
Painting10%
Fire prevention and fire fighting fitting and fixture with network44%
Weather Proof work(tile,concrete)5%
Wardrobe, Showcase, Kitchen cabinet, Puja work0%
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes10%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationNoNot applicable
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymNoNot applicable
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningYes0%
StaircasesYes8%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership11

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,288 sq m
Named landowners11
LandownerVillageDistrict
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--
M/s. Sobha Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 466.76 cr
Cost incurredRs 113.87 cr
Spent of the estimate24.4%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 346.57 crRs 88.69 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 46.51 crRs 5.11 cr
Payment of taxesRs 39.03 crRs 18.42 cr
On-site expenditure-Site OverheadRs 34.66 crRs 1.65 cr

Certifying professionals and partners4

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetha K Nair
EngineerMr.HAREESH GOWDA
EngineerBalakrishnan G
Chartered AccountantBalaji D

Complaints filed with RERA Karnataka4

Case no.ComplainantRespondentFiled
00924/2024-SOBHA LIMITED23/09/2024
01236/2024-SOBHA LIMITED25/11/2024
00889/2025-SOBHA LIMITED01/07/2025
01226/2025-SOBHA LIMITED25/09/2025

Documents filed202

As listed on the registration, under the names the promoter filed them with; the newest 80 of 202 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/220923/006283 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Neopolis PH4 C.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Neopolis Ph4.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Neopolis Ph4.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Neopolis PH4.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Neopolis Phase 4.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Neopolis Phase 4.pdf13 Jul 2026
Q1 2026-27 Water supply and sewage board13 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Jul 2026
Q1 2026-27 KPTCL- BESCOM13 Jul 2026
Q1 2026-27 Fire and Safety13 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Neopolis PH4.pdf10 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Neopolis PH4.pdf10 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Neopolis Phase 4.pdf10 Apr 2026
Q4 2025-26 Water supply and sewage board10 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)10 Apr 2026
Q4 2025-26 Fire and Safety10 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Neopolis PH4 C.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Neopolis PH4.pdf13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Neopolis PH 4.pdf13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Jan 2026
Q3 2025-26 Fire and Safety13 Jan 2026
What are all the sources of funds to complete the project? With supporting documentsFile: 27 sources of funds for the completion of the project.pdf14 Sep 2023
Area details and Inventory details are updated in the respective pagesFile: 2 Neopolis Inventory details 1886 units.pdf14 Sep 2023
What are all the sources of funds to complete the project?File: 27 sources of funds for the completion of the project.pdf7 Sep 2023
Title/sale deedFile: Any other documents c.pdf7 Sep 2023
R.T.C for the year 2021-22 and 2022-23File: 11 RTCs for the period 2021 22 to 2023 24 for all sy numbers.pdf7 Sep 2023
EC from 01.04.2022 to till dateFile: EC from 01 04 2022 to till date.pdf7 Sep 2023
conversion order for Sy.No.47/6 remaining extent 0.20 guntasFile: 8 conversion order for Sy No 476 remaining extent zero point two guntas.pdf7 Sep 2023
Hissa Phodi mutation copyFile: 10 Hissa Phodi mutation copy.pdf7 Sep 2023
Approved layout plan issued by the competent AuthorityFile: Site Plan.pdf7 Sep 2023
Built up area Mentioned in the project detailsFile: 1 BUA details.pdf7 Sep 2023
Number of parking mentioned in the project detailsFile: 21 Number of parking mentioned in the project details.pdf7 Sep 2023
Built up area / Number of units in the KSPCB NOCFile: KSPCB NOC query reply and CH sanction drgs.pdf7 Sep 2023
Upload Building License.File: 18 Building License Panathur.pdf7 Sep 2023
Phasewise demarcation drawingFile: Neopolis Phase 4.pdf7 Sep 2023
Site planFile: Site Plan.pdf7 Sep 2023
Sections and elevationFile: Sections and Elevation.pdf7 Sep 2023
Floor plan part 1 of 2File: Floor plans part 1 of 2 c.pdf7 Sep 2023
Floor plan part 12of 2File: Floor plans part 2 of 2 c.pdf7 Sep 2023
Carpet Area Mentioned in the project details PageFile: 2 Carpet area details.pdf7 Sep 2023
ZR Showing the Nala Buffer.File: 16 ZR showing nala buffer.pdf7 Sep 2023
Common Area Allotted To Association on the project detail pageFile: 22 Common Area Allotted To Association on the project detail page.pdf7 Sep 2023
self-attested copy of the Engineer license certificateFile: 25 Engineer License certificate Attested.pdf7 Sep 2023
Amenities and common areasFile: Neopolis 4 CAA.pdf7 Sep 2023
original copy of the section 3(1) notarized affidavit(colour copy)File: Notarised affidavits phase 4.pdf7 Sep 2023
all required NOC of self-attestation with a seal/notarized attestation.File: All NOCs combined c.pdf7 Sep 2023
proforma of Agreement for Sale (AFS)File: 15 proforma of Agreement for Sale note.pdf7 Sep 2023
proforma of Agreement for Sale (AFS)File: Proforma of ATS Sobha Neopolis ph4.pdf7 Sep 2023
phase-wise demarcation drawingFile: Neopolis Phase 4.pdf7 Sep 2023
Annexure-A with the stage-wise completion dateFile: Sobha Neopolies PH 4 Allotment Letter.pdf7 Sep 2023
STP design drawing certified by the concerned EngineerFile: STP c.pdf7 Sep 2023
Land cost calculation sheet as per the guidance value self-attested copyFile: 24 Self attested Guideline value.pdf7 Sep 2023
brief estimated cost of construction certified by the registered EngineerFile: Neopolis Phase 4.pdf7 Sep 2023
Inventory detailsFile: 28 Neopolis Inventory details 1886 units.pdf7 Sep 2023
RTC, survey 46/4-
Mutation, survey 46/4-
Encumbrance Certificate, survey 46/4-
Conversion/Alienation Order, survey 46/4-
Sale/Title/Gift Deed, survey 46/4-
Khatha, survey 46/4-
RTC, survey 46/7-
Mutation, survey 46/7-
Encumbrance Certificate, survey 46/7-
Conversion/Alienation Order, survey 46/7-
Sale/Title/Gift Deed, survey 46/7-
Khatha, survey 46/7-
RTC, survey 46/8 (old No.46/5)-
Mutation, survey 46/8 (old No.46/5)-
Encumbrance Certificate, survey 46/8 (old No.46/5)-
Conversion/Alienation Order, survey 46/8 (old No.46/5)-
Sale/Title/Gift Deed, survey 46/8 (old No.46/5)-
Khatha, survey 46/8 (old No.46/5)-
RTC, survey 47/6-
Mutation, survey 47/6-
Encumbrance Certificate, survey 47/6-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

30 not delivered by the promised date21 under way, not due yet39 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Sobha Brooklyn Towers - Town Park Phase 4, W4 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Brooklyn Towers - Town Park Phase 3, W5 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Royal crest Litigation"PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE"OngoingDec 2028Not due yet
Sobha Dream Gardens Phase 5 - Wing 10 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Dream Gardens Phase 4 - Wing 1 and 2 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingSep 2028Not due yet
Sobha Brooklyn Towers - Town Park Phase 5, W3 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Victoria park phase 2 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Victoria park phase 1 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Sentosa Phase 4 Wing 1 and 2 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2027Not due yet
Sobha Dream Gardens Phase 3 - Wing 3 and 4 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 2, W2 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 1, W1 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingSep 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Sentosa Phase 3 Wing 3 and 4 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingJun 2027Not due yet
Sobha Sentosa Phase 2 Wing 5 and 6 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2026Not due yet
Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingDec 2026Not due yet
Sobha Insignia LitigationKHATHA NO.1232/128/7, SY NO.128/7, BHOGANAHALLI VILLAGE VARTHUR HOBLI, BENGALURU EAST, BENGALURU URBANOngoingDec 2026Not due yet
Sobha Galera Litigation"SOBHA GALERA, SURVEY NO 45/4 OF HUSKUR VILLAGE, BIDARAHALLI HOBLI, BANGLAORE EAST TALUK SURVEY NO.116 OF AMANIDODDAKERE VILLAGE, KASABA HOBLI, HOSAKOTE TALUK, BANGALORE , BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560049"OngoingDec 2026Not due yet
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 LitigationBalagere, BangaloreOngoingSep 2026Not delivered
Sobha Sentosa Phase 1 Wing 7 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 8 - Wing 15 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 6 - Wing 10 and 11 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 5 - Wing 8 and 9 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Windsor Phase 2 Wing 3, 4 and 5 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingApr 2026Not delivered
Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24 LitigationBalagere, BangaloreOngoingMar 2026Not delivered
Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22 LitigationBalagere, BangaloreOngoingMar 2026Not delivered
Sobha Windsor Phase 1 Wing 1 and 2 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingNov 2025Not delivered
Sobha Rajvilas LitigationSy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation roadOngoingMar 2025Not delivered
Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30 LitigationBalagere, BangaloreOngoingMar 2025Not delivered
Sobha Lake Gardens Phase 2Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram HobliOngoingDec 2024Not delivered
Sobha Dream Gardens Phase 2 - Wing 5, 6 and 7 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Gardens Phase 1 - Wing 8 and 9 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 25 Wing 32, 33 and 34 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered

How this compares with Bengaluru Urban

85%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sobha Neopolis Phase 4 - 3, 4, 8 & 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSobha Neopolis Phase 4 -Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 81 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sobha Neopolis Phase 4 - 3, 4, 8 & 9 is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sobha Neopolis Phase 4 - 3, 4, 8 & 9?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sobha Neopolis Phase 4 - 3, 4, 8 & 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sobha Neopolis Phase 4 - 3, 4, 8 & 9?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Sobha Neopolis Phase 4 - 3, 4, 8 & 9?

The professionals named in the filing: Architect: Geetha K Nair; Engineer: Mr.HAREESH GOWDA; Engineer: Balakrishnan G; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sobha Neopolis Phase 4 - 3, 4, 8 & 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sobha Neopolis Phase 4 - 3, 4, 8 & 9. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sobha Neopolis Phase 4 - 3, 4, 8 & 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.