Home / Browse projects / Bengaluru Urban, Karnataka / SOHO BY BREN

Registration approved No litigation declared Mixed Development project

SOHO BY BREN

By BREN CORPORATION PRIVATE LIMITED

RG-KA-82581 · RERA PRM/KA/RERA/1251/310/PR/200622/005011 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
Nov 2026Possession promisedmoved 12 months from the original
10 of 17Construction stages donefurthest along: Elevation work, 98%
15 of 175Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 161 documents Report an error

SOHO BY BREN is a Mixed Development project by BREN CORPORATION PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/200622/005011 on 20 Jun 2022. Possession is promised by 30 Nov 2026. The completion date has moved by 12 months from the original filing. 160 of the 175 units on this registration are recorded sold or booked, and 10 of 17 construction stages are filed complete.

At a glance

Project

  • NameSOHO BY BREN
  • TypeMixed Development
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560109
  • Pincode560109
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/200622/005011
  • ReraGenie IDRG-KA-82581

Builder

  • NameBREN CORPORATION PRIVATE LIMITED
  • Entity typeCompany
  • CINU45203KA2012PTC064294
  • GSTIN29AAFCB6608K1ZD
  • Authorized SignatoryCHELLASAMY THANGASAMY
  • DirectorJ Boopesh Reddy
  • DirectorsJ Boopesh Reddy, DEEPA BOOPESH REDDY, ARJUN BOOPESH REDDY
  • Project HeadCHELLASAMY THANGASAMY
  • Other registrations6 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredJun 2022First promiseNov 2025Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Jun 2022
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Nov 2025)
  • Buildings1 building record
  • Documents filed161 files

Current status

91%160 of 175 units booked
3.4%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 01---1750175

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 17 construction stages are filed complete. The stage furthest along is Elevation work, at 98%.

Building: 97% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc95%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)97%
Railing and Grill fixing97%
Electrification, Water supply and Sanitary Finishing97%
Painting97%
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work98%
Internal and External work including landscapes as per sanctioned drawings60%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Solid waste management and disposalYes100%
Emergency Evacuation servicesYes100%
Internal Roads & FootpathsYes95%
Electricity supply transformer and substationYes60%
Storm water drainsYes100%
Use of renewable energyYes100%
Sewage Treatment Plant (STP)Yes98%
Parks & Tree plantingYes10%
Street LightingYes10%
ElectricityYes70%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes95%
Community HallYes95%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes90%
GymYes0%
ParksNoNot applicable
Power BackupYes50%
Piped GasNoNot applicable
Water and SanitationYes100%
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsNoNot applicable
Corridor/LobbiesYes100%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,556 sq m
Named landowners2
LandownerVillageDistrict
Sri Gowrishankar N Hosakere--
Sri Gowrishankar N Hosakere--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 120.51 cr
Cost incurredRs 4.07 cr
Spent of the estimate3.37%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 100.10 crRs 3.82 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 10.00 crRs 7.49 lakh
On-site expenditure-Salaries of workersRs 5.60 crRs 12.84 lakh
On-site expenditure-Consultants FeesRs 2.77 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.04 crRs 3.97 lakh
On-site expenditure-Site OverheadRs 99.96 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThomas Associates
EngineerSterling Engineering Consultancy Services Pvt. Ltd
Chartered AccountantAmit Someshwar Padaki

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/251220/005011Nov 2025 → Nov 2026

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed161

As listed on the registration, under the names the promoter filed them with; the newest 80 of 161 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/200622/005011 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form4 - Soho By Bren.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect SOHO By BREN - Q2 SEP'2026 - 2026 - 27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer SOHO by BREN - Q2 2026 - 27.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate FY 2026-27 QTR 1 SOHO BY BREN.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Certificate FY 2026-27 QTR 1 Form-5, Architect SOHO By BREN - Q1 - 2026 - 27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate FY 2026-27 QTR 1 SOHO BY BREN.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Cirtificate Soho By Bren QTR 4 2025-26 .pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect SOHO By BREN - Q4 - 2025 - 26.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: SOHO BY BREN.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Qtr-3 FY-2025-26 Bren Soho_0001_0001.pdf28 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (2025 - 26 Q3) - SOHO By BREN .pdf28 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: SOHO BY BREN.pdf28 Feb 2026
Q3 2025-26 Water supply and sewage board28 Feb 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)28 Feb 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)28 Feb 2026
Q3 2025-26 KPTCL- BESCOM28 Feb 2026
Q3 2025-26 Fire and Safety28 Feb 2026
Q3 2025-26 Airport Authority of India28 Feb 2026
Q3 2025-26 BSNL/Telecommunication Department28 Feb 2026
AffidavitFile: Affidavit.pdf4 Dec 2025
Reply LetterFile: Soho Query reply.pdf15 Nov 2025
Latest EC - SOHOFile: LATEST EC - SY NO 49 & 52 SOHO.pdf15 Nov 2025
KSPCB - CFEFile: 2 STATE POLLUTION CONTROL BOARD NOC.pdf15 Nov 2025
SEIAA - NOCFile: 3 STATE LEVEL ENVIRONMENTAL CLEARANCE NOC.pdf15 Nov 2025
BESCOM NOCFile: 5 Bren Thalaghattapura Bescom NOC.pdf15 Nov 2025
Fire NOCFile: 7 FIRE NOC-Talaghatapura.pdf15 Nov 2025
AAI NOCFile: 9 Airports Authority of India NOC.pdf15 Nov 2025
BSNL NOCFile: 10 BSNL NOC.pdf15 Nov 2025
BWSSB NOCFile: 1 Thalaghattapura BWSSB NOC.pdf15 Nov 2025
CA UDIN not mentioned in Cash flow StatementFile: 1 CFS With UDIN.pdf10 Jun 2022
Conversion orderFile: 2 Conversion Order Response.pdf10 Jun 2022
Conversion Order dated 24/02/2000, bearing No. BDIS:ALN:SR(S):25/1999-2000File: 2a Conversion Order - 25 dated 24-02-2000 issued by the Special Deputy Commissioner, Benga10 Jun 2022
Conversion Order dated 24/02/2000, bearing No. BDIS:ALN:SR(S):26/1999-2000File: 2b Conversion Order - 26 of 1999-2000.pdf10 Jun 2022
Conversion Order dated 25/11/2002, bearing No. BDIS:ALN:SR(S):204/2002-03File: 2c Conversion Order - 204 dated 25-11-2000 issued by the Special Deputy Commissioner, Beng10 Jun 2022
Clarification on Single layout / Development Plan and OrderFile: 3 Single layout Development Plan and Order Response.pdf10 Jun 2022
Clarification on Relinquishment DeedFile: 4 RELINQUISHMENT DEED CLARIFICATION.pdf10 Jun 2022
Advocate Search ReportFile: OPinion of Thalaghattapur Village Sy No-49 & 52 Dated 11-05-2022 with enrolment numeber.pd10 Jun 2022
chartered accountant certificate in prescribed format form-01File: Form -1 CA Certificate Soho by BREN - With Commercial.pdf3 Jun 2022
mention CA UDIN for 2020-21 financial statementFile: Balance sheet 20-21 with udin.pdf3 Jun 2022
conversion order for both synoFile: Conversion order 25, 26 and 204.pdf3 Jun 2022
absolute sale deed to jda land owner gowri shankar n hoskereFile: 1 Gift deed dated Dated 16-12-2010 executed by HK Nanjundaswamy in favor of Sri Gowrishank3 Jun 2022
ec from 01/05/2005 to upto date in form 15(certified copy from concerned SRO)File: EC FOR SY NO 49 & 52 FROM 2004 TO 2022.pdf3 Jun 2022
upload the certified copy obtained by the concerned Sub-registrar regarding value of the propertyFile: Guidline value.pdf3 Jun 2022
need title deed (chain of title from rtc owner to jda owner).File: 1 Gift deed dated Dated 16-12-2010 executed by HK Nanjundaswamy in favor of Sri Gowrishank3 Jun 2022
single layout / Development Plan and OrderFile: Project Plan_11zon.pdf3 Jun 2022
Location and Demarcation Drawing. (Village map demarcation)File: Location1.pdf3 Jun 2022
Extract of Master Plan / Change of land useFile: THALGHATPURA Survey Drawing-Model.pdf3 Jun 2022
Cost of Land mentioned Zero is incorrect. Please update the Cost of Land and accordingly update theFile: Land Cost Clarification.pdf3 Jun 2022
BHK wise break up development details in the type of inventory and No. of inventory columns of develFile: Inventory Breakup Clarification.pdf3 Jun 2022
Engineer certified estimated cost of construction of the project. accordingly please update the costFile: Form -3 With cost details.pdf3 Jun 2022
Total Built area does not match with the uploaded drawing. Therefore please check and update the samFile: Built up Area Clarification.pdf3 Jun 2022
copy of project specificationFile: Soho by BREN- Project Specifications.pdf3 Jun 2022
proforma of Agreement of Sale notified by GOK, by incorporating the details of vendors, Project specFile: Proforma Agreement of Sale as per GOK_BREN SOHO.pdf3 Jun 2022
copy of fee receipt paid towards BWSSB NOC and BESCOM NOC.File: Payment Challans for NOC.pdf3 Jun 2022
highlighted STP demarcation site plan along with STP design drawing.File: STP & UG SUMP DETAILS - BREN SOHO.pdf3 Jun 2022
Proforma of Allotment LetterFile: Allotment notice - Format.pdf3 Jun 2022
RTC, survey Sy No.49-
Mutation, survey Sy No.49-
Encumbrance Certificate, survey Sy No.49-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
BREN ZAHARASY NO. 36/1 AND 39 HARALUR VILLAGE, VARTHUR HOBLI BANGALORE EAST TALUK BANGALORE, BENGALURU EAST, BENGALURU URBANOngoingJul 2023Not delivered
BREN NORTHERN LIGHTSSY.NO. 8,GASTIKEMPANAHALLI, YALAHANKA HOBLI, BENGALURU NORTH, BENGALURU URBANOngoingMar 2023Not delivered

How this compares with Bengaluru Urban

91%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SOHO BY BREN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSOHO BY BRENOther 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: BREN CORPORATION PRIVATE LIMITED

BREN CORPORATION PRIVATE LIMITED has 7 registrations on RERA Karnataka, including BREN PARK CITY and BREN NORTHERN LIGHTS. Its filings declare 5 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SOHO BY BREN is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SOHO BY BREN?

The registered promoter entity is BREN CORPORATION PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2012PTC064294 and GSTIN 29AAFCB6608K1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SOHO BY BREN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SOHO BY BREN?

The professionals named in the filing: Architect: Thomas Associates; Engineer: Sterling Engineering Consultancy Services Pvt. Ltd; Chartered Accountant: Amit Someshwar Padaki. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOHO BY BREN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOHO BY BREN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOHO BY BREN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.