Sobha Victoria park phase 1

By SOBHA LIMITED

RG-KA-13830 · RERA PRM/KA/RERA/1251/309/PR/310322/004800 · Last updated on RERA Karnataka portal: 13 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
18 of 18Construction stages doneevery applicable stage filed complete
20 of 300Units unsoldnot recorded sold or booked
1Complaints at RERA Karnatakaon this registration
Jump to the 122 documents Report an error

Sobha Victoria park phase 1 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/310322/004800 on 31 Mar 2022. Possession is promised by 31 Dec 2027. 280 of the 300 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSobha Victoria park phase 1
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560077
  • Pincode560077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/310322/004800
  • ReraGenie IDRG-KA-13830

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryMr. Suresh Ganiga
  • Managing DirectorMr Jagdish Chandra Sharma
  • DirectorsMr Jagdish Chandra Sharma, Ravi P N C Menon, T P Seetharam
  • Project HeadMr. Nandeesh raju
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredMar 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on31 Mar 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed122 files

Current status

93%280 of 300 units booked
105.3%Of the estimated cost spent so far

Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING 1---60060
WING 2---60060
WING 3---60060
WING 4---60060
WING 5---60060

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 18 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Painting100%
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work100%
Internal and External work including landscapes as per sanctioned drawings100%

Progress on shared amenities40

As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Solid waste management and disposalYes100%
Emergency Evacuation servicesYes100%
Internal Roads & FootpathsYes100%
Electricity supply transformer and substationNoNot applicable
Storm water drainsYes98%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes96%
Parks & Tree plantingYes78%
Street LightingYes70%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymNoNot applicable
ParksYes0%
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes100%
BasementYes100%
TerraceYes100%
Outer WallYes100%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area24,406 sq m
Named landowners6
LandownerVillageDistrict
K. Basavegowda--
Dhanalakshmi--
K.Bhagyaraju alias Bhagyaraj--
K.Shanthakumari--
Hemavathi Nagabhushan alias K.Hemavathi--
K. Basavegowda--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 278.96 cr
Cost incurredRs 293.81 cr
Spent of the estimate105.32%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 206.76 crRs 251.27 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 38.40 crRs 4.12 cr
Payment of taxesRs 19.32 crRs 22.94 cr
On-site expenditure-Site OverheadRs 14.47 crRs 15.48 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetha K Nair
EngineerMr. Durga Prasad KVR
Chartered AccountantBalaji D

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00307/2024-SOBHA LIMITED21/03/2024

Documents filed122

As listed on the registration, under the names the promoter filed them with; the newest 80 of 122 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/310322/004800 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Victoria Phase 1 C.pdf13 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Victoria Park Ph1.pdf13 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Victoria Ph1.pdf13 Oct 2026
Q2 2026-27 Water supply and sewage board13 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Oct 2026
Q2 2026-27 KPTCL- BESCOM13 Oct 2026
Q2 2026-27 Fire and Safety13 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Victoria Phase 1.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Victoria Phase 1.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Victoria Park Phase1.pdf13 Jul 2026
Q1 2026-27 Water supply and sewage board13 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Jul 2026
Q1 2026-27 KPTCL- BESCOM13 Jul 2026
Q1 2026-27 Fire and Safety13 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Victoria Phase 1.pdf10 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Victoria PH1.pdf10 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Victoria Phase 1.pdf10 Apr 2026
Q4 2025-26 Water supply and sewage board10 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)10 Apr 2026
Q4 2025-26 KPTCL- BESCOM10 Apr 2026
Q4 2025-26 Fire and Safety10 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Victoria Phase 1 C.pdf12 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Victoria PH1.pdf12 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Victoria Park PH 1.pdf12 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)12 Jan 2026
Q3 2025-26 KPTCL- BESCOM12 Jan 2026
Q3 2025-26 Fire and Safety12 Jan 2026
Fee clarificationFile: 1 Fee.pdf18 Mar 2022
PRM/KA/RERA/1251/309/PR/171015/000429 project is completed, OC attachedFile: 1a Sobha city casa paradiso block 4 OC and Ticket.pdf18 Mar 2022
CA UDIN for 2020-21 is 20065155AAAADL9780File: 1c Financial Results 2021.pdf18 Mar 2022
CA UDIN for 2019-20 is 21065155AAAADJ7372File: 1b Financial Report 2020.pdf18 Mar 2022
Non- litigation affidavitFile: Sobha Victoria Park Ph1.pdf18 Mar 2022
Development Plan Approved by the Planning / development authority.File: 3 Approved drawings.PDF18 Mar 2022
Development plan OrderFile: 4 DP and WO.pdf18 Mar 2022
Change of land use is not applicable since the property is in residential zoneFile: 5 Change of Land use NA.pdf18 Mar 2022
Methodology of Built up area calculation is different for different santioning authorities.File: 6 BUA in the section plan and the KSPCB NOC and SEIAA NOC.pdf18 Mar 2022
Location and Demarcation PlanFile: 7 Location Map and Site Plan.pdf18 Mar 2022
Architect COA Number is CA/93/15641File: 8 SVP Geetha Nair COA.PDF18 Mar 2022
The details of unitwise BHK type are submitted in the Inventory details of page 5. Again attached.File: SVP ph1 Inventory details.pdf18 Mar 2022
Area mentioned in the project detail page with demarcation of land areaFile: SVP ph1 Demarcation for plot area.pdf18 Mar 2022
Common Area Allotted To Association is already submitted in Page 5 of Inventory detailsFile: 12 Common Area Allotted To Association.pdf18 Mar 2022
Clarity on Landowners name in the NOCFile: 13 BESCOM NOC issued in some other name instead of Sobha Limited.pdf18 Mar 2022
Demarcation STP site plan along with STP design drawing.File: SVP Ph1 Demarcation STP site plan along with STP design drawing.pdf18 Mar 2022
Copy of fee paid receipts towards BWSSB NOC and BESCOM NOC.File: 15 Copy of fee paid receipts towards BWSSB NOC and BESCOM NOC.pdf18 Mar 2022
section 3(1) notarized affidavit.File: Affidavit SVP ph1.pdf18 Mar 2022
Proforma Agreement of Sale with highlighting changesFile: SVP ATS with highlighting the changes.pdf18 Mar 2022
RTC, survey 47/1B-
Mutation, survey 47/1B-
Encumbrance Certificate, survey 47/1B-
Conversion/Alienation Order, survey 47/1B-
Sale/Title/Gift Deed, survey 47/1B-
JDA, survey 47/1B-
Khatha, survey 47/1B-
RTC, survey 47/2B-
Mutation, survey 47/2B-
Encumbrance Certificate, survey 47/2B-
Conversion/Alienation Order, survey 47/2B-
Sale/Title/Gift Deed, survey 47/2B-
JDA, survey 47/2B-
Khatha, survey 47/2B-
Registration CertificateFile: Registration Certificate of SL.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Form 1 SVP CA Ph1.pdf-
Certificate issued by Architect Form 2File: Sobha Victoria Park AC Ph1.pdf-
Certificate issued by Engineer Form 3File: Sobha Victoria Park EC Ph1.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Form B_SVP ph1.pdf-
Certificate from Chartered AccountFile: Form 1 SVP CA Ph1.pdf-
Balance Sheet 2020 - 2021File: Balance sheet Mar 2021.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet Mar 2020.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet Mar 2019.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit Loss Statement Mar 2021.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit Loss Statement Mar 2020.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit Loss Statement Mar 2019.pdf-
Director's Report 2020 - 2021File: DR 2020 21.pdf-
Director's Report 2019 - 2020File: DR 2019 20.pdf-
Director's Report 2018 - 2019File: DR 2018 19.pdf-
Cash Flow Statement 2020 - 2021File: Cash Flow Mar 2021.pdf-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

28 not delivered by the promised date5 under way, not due yet35 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Sobha Manhattan Towers - Town Park Phase 2, Wing 1 and 2 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingSep 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingSep 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Manhattan Towers - Town Park Phase 1, Wing 4 and 5 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingDec 2026Not due yet
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 LitigationBalagere, BangaloreOngoingSep 2026Not delivered
Sobha Royal Pavilion Phase 8 - Wing 15 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 6 - Wing 10 and 11 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 5 - Wing 8 and 9 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Windsor Phase 2 Wing 3, 4 and 5 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingApr 2026Not delivered
Sobha Windsor Phase 1 Wing 1 and 2 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingNov 2025Not delivered
Sobha Rajvilas LitigationSy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation roadOngoingMar 2025Not delivered
Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30 LitigationBalagere, BangaloreOngoingMar 2025Not delivered
Sobha Dream Gardens Phase 2 - Wing 5, 6 and 7 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Gardens Phase 1 - Wing 8 and 9 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 3 - Wing 16 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 2 - Wing 4 and 5 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 1 - Wing 6 and 7 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Lake Gardens Phase 1Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram HobliOngoingFeb 2024Not delivered
Sobha Forest Edge02/20/1/21/2 Hosahalli, Kengeri Sub Division, Ward No.198, BengaluruOngoingJun 2023Not delivered
Sobha HRC Pristine Phase 4 Block 4 and 5 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 3 Block 3 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 2 Block 2 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 1 Block 1 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha Dream Acres - Palm Springs Phase 16 Wing 50 LitigationBalagere, BangaloreOngoingMar 2023Not delivered
Sobha Arena - Pebble Court (Block 1) LitigationKanakapura Road, BangaloreOngoingJan 2023Not delivered
Sobha Arena - The Square (Block 4) LitigationKanakapura Road, BangaloreOngoingSep 2022Not delivered
Sobha Palm Court LitigationYelahanka, BangaloreOngoingFeb 2022Not delivered
Sobha Morzaria Grandeur 2 (W1)Dairy circle, BangaloreOngoingFeb 2022Not delivered
Sobha Silicon Oasis Wings 1, 2, 3, 4, 5, 6 LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Wing 8 LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Wing 7 LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis WIng 9 LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Block 2 and 3 (Row house No. 9, 10) LitigationHosa Road, BangaloreCompleted-No date filed
Sobha Silicon Oasis Block 2 and 3 (Row house No. 1 to 8 & 11 to 17) LitigationHosa Road, BangaloreCompleted-No date filed
Sobha PalladianHAL Road, YamlurCompleted-No date filed

How this compares with Bengaluru Urban

93%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sobha Victoria park phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSobha Victoria park phasOther 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sobha Victoria park phase 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sobha Victoria park phase 1?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sobha Victoria park phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sobha Victoria park phase 1?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Sobha Victoria park phase 1?

The professionals named in the filing: Architect: Geetha K Nair; Engineer: Mr. Durga Prasad KVR; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sobha Victoria park phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sobha Victoria park phase 1. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sobha Victoria park phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.