Home / Browse projects / Bengaluru Urban, Karnataka / DNR PARKLINK PHASE 2

Registration approved No litigation declared Residential/Group Housing project

DNR PARKLINK PHASE 2

By DNR CORPORATION PVT LTD

RG-KA-25495 · RERA PRM/KA/RERA/1251/446/PR/151223/006478 · Last updated on RERA Karnataka portal: 19 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
May 2029Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 50%
132 of 428Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 166 documents Report an error

DNR PARKLINK PHASE 2 is a Residential/Group Housing project by DNR CORPORATION PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/151223/006478 on 15 Dec 2023. Possession is promised by 31 May 2029. 296 of the 428 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameDNR PARKLINK PHASE 2
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560077
  • Pincode560077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/151223/006478
  • ReraGenie IDRG-KA-25495

Builder

  • NameDNR CORPORATION PVT LTD
  • Entity typeCompany
  • GSTIN29AACCD8007D1ZW
  • Authorized SignatoryVIPUL KUMAT
  • Managing DirectorVIPUL KUMAT
  • DirectorRITESH KUMAR KUMAT
  • Project HeadG Karthik
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023PromisedMay 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Dec 2023
  • Promised completion31 May 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed166 files

Current status

69%296 of 428 units booked
6.7%Of the estimated cost spent so far

Figures as on 19 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C---1780178
D---1780178
E---72072

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 50%.

Building: 9% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work50%
Foundation footing work42%
Upto Plinth Level25%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)5%
Retaining wall (All types)35%
RCC or MS Framed structure5%
Masonry Construction4%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 19 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes0%
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesYes0%

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,247 sq m
Named landowners2
LandownerVillageDistrict
M/s Krishnapriya Reality LLP--
M/s Krishnapriya Reality LLP--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 200.00 cr
Cost incurredRs 13.44 cr
Spent of the estimate6.72%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 156.00 crRs 11.37 cr
Payment of taxesRs 28.73 crRs 2.05 cr
Payment of feesRs 7.71 cr-
On-site expenditure-Consultants FeesRs 3.60 cr-
On-site expenditure-Site OverheadRs 1.80 crRs 1.57 lakh
Payment of cessRs 1.56 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 60.00 lakhRs 19,539

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANUP NAIK
EngineerMr. Ashok Kannan M/s optimal consulting services pvt ltd
Chartered AccountantPRAKASH N

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed166

As listed on the registration, under the names the promoter filed them with; the newest 80 of 166 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/151223/006478 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA Certificate.pdf19 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE -PHASE 2.pdf19 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE - PHASE 2 Uploaded.pdf19 Oct 2026
Q2 2026-27 Water supply and sewage board19 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)19 Oct 2026
Q2 2026-27 KPTCL- BESCOM19 Oct 2026
Q2 2026-27 Fire and Safety19 Oct 2026
Q2 2026-27 Airport Authority of India19 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department19 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4-CA - Parklink Phase-2_compressed.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE PARKLINK PHASE - 2.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE Parklink Phase 2 Final.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA CERTIFICATE_compressed.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA Certificate Parklink 2_compressed.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect Certificate Parklink 2.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer Certificate Parklink 2.pdf14 Jan 2026
Q3 2025-26 Water supply and sewage board14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Q3 2025-26 Fire and Safety14 Jan 2026
Q3 2025-26 Airport Authority of India14 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department14 Jan 2026
ADLR SKETCHFile: ADLR- sketch.pdf5 Dec 2023
AFFIDAVIT FOR 3(1) WITH PROJECT ADDRESSFile: AFFIDAVIT for SEC 3(1).pdf5 Dec 2023
ALLOTMENT LETTER AS PER GOK FORMATFile: ALLOTMENT LETTER-DNR PARKLINK RERA FORMAT.pdf5 Dec 2023
AGREEMENT TO SELL AS PER GOK FORMATFile: AOS_DNR PARKLINK_RERA.pdf5 Dec 2023
BALANCE SHEET WITH SCHEDULE 2021-22 DNRFile: BALANCE SHEET -2021-22 - WITH SCHEDULE.pdf5 Dec 2023
BALANCE SHEET WITH SCHEDULE 2019-20 DNRFile: BALANCE SHEET-2019-20 WITH SCHEDULE.pdf5 Dec 2023
BALANCE SHEET WITH SCHEDULE 2020-21 DNRFile: BALANCE SHEET-2020-21 WITH SCHEDULE.pdf5 Dec 2023
BUILDING LICENCE ISSUED BY KANNUR GRAMA PANCHAYATHIFile: Building Licence -Kannur Grama Panchayathi.pdf5 Dec 2023
CDP MAP SHOWING PROPOSED PROJECT SITEFile: CDP MAP showing the proposed site.jpg5 Dec 2023
PROJECT DEMARCATION plan with details certified by EngineerFile: Demarcation plan with details certified by Engineer.pdf5 Dec 2023
ENCUMBRANCE CERTIFICATE -BYRATHI LAND TILL DATEFile: EC 01-04-2004 to 08-06-2021- Bairathi.pdf5 Dec 2023
ENCUMBRANCE CERTIFICATE -CHIKKAGUBBI LAND TILL DATEFile: EC-04-01-2023 To 25-10-2023-Chikkagubbi.pdf5 Dec 2023
ECFile: EC-01-04-2023 To 26-10-2023-Bairathi Sy 129 & 130.pdf5 Dec 2023
ECFile: EC-04-01-2023 To 25-10-2023-Chikkagubbi.pdf5 Dec 2023
ESTIMATED COST OF CONSTRUCTION CERTIFIED BY ENGINEERFile: Estimated cost of construction certified by engineer.pdf5 Dec 2023
GUIDANCE VALUE CERTIFIED COPY- BAIRATHI VILLAGEFile: Guidance value certified copy-Bhairathi village.pdf5 Dec 2023
GUIDANCE VALUE CERTIFIED COPY-CHIKKAGUBBI VILLAGEFile: Guidance value certified copy-Chikkagubbi.pdf5 Dec 2023
NOC FROM KANNUR GRAMA PANCHAYATHI FOR WATER SUPPLYFile: Kannur Grama Panchayathi -NOC-water supply.pdf5 Dec 2023
KRISHNAPRIYA REALITY LLP- BALANCE SHEET & PROFIT LOSS 2022-23File: KRISHNAPRIYA LLP- BALANCE SHEET & PROFIT LOSS 2022-23.pdf5 Dec 2023
KRISHNAPRIYA REALITY LLP PROFIT LOSS STATEMENT-2019-20-with scheduleFile: PROFIT LOSS STATEMENT-2019-20-with schedule.pdf5 Dec 2023
DEMARCATION DNR PARKLINK PHASE 1 & PHASE 2File: PHASE-1& PHASE 2.pdf5 Dec 2023
PROFIT LOSS STATEMENT -2021-22 -WITH SCHEDULEFile: PROFIT LOSS STATEMENT -2021-22 -WITH SCHEDULE.pdf5 Dec 2023
PROFIT LOSS STATEMENT-2019-20-with scheduleFile: PROFIT LOSS STATEMENT-2019-20-with schedule.pdf5 Dec 2023
PROFIT LOSS STATEMENT-2020-21-WITH SCHEDULEFile: PROFIT LOSS STATEMENT-2020-21-WITH SCHEDULE.pdf5 Dec 2023
RELIQUISHMENT DEED-Park & Open spacesFile: RELIQUISHMENT DEED-Park & Open spaces.pdf5 Dec 2023
Self attested copy of Adhaar of EngineerFile: Self attested copy of Adhaar of Engineer.pdf5 Dec 2023
STP DRAWINGFile: STP_600 KLD_DRAWING_STP_GF.pdf5 Dec 2023
Village Map BairathiFile: Village_Map_Bairathi.pdf5 Dec 2023
VILLAGE MAP-CHIKKAGUBBIFile: Village_Map_Chikkagubbi.pdf5 Dec 2023
21ST FLOOR PLANFile: 21ST FLOOR PLAN.pdf5 Dec 2023
22ND FLOOR PLANFile: 22ND FLOOR PLAN.pdf5 Dec 2023
ABOVE REFUGE FLOOR PLAN @ 20TH FLOORFile: ABOVE REFUGE FLOOR PLAN @ 20TH FLOOR.pdf5 Dec 2023
ABOVE TERRACE FLOOR PLANFile: ABOVE TERRACE FLOOR PLAN.pdf5 Dec 2023
BASEMENT 01 PLANFile: BASEMENT 01 PLAN.pdf5 Dec 2023
BASEMENT 02 PLANFile: BASEMENT 02 PLAN.pdf5 Dec 2023
ELEVATION 01-TOWER -A B C DFile: ELEVATION 01-TOWER -A B C D.pdf5 Dec 2023
EWS & CLUB HOUSE PLANFile: EWS & CLUB HOUSE PLAN.pdf5 Dec 2023
EWS & CLUB HOUSE SECTION & ELEVATIONFile: EWS & CLUB HOUSE SECTION & ELEVATION.pdf5 Dec 2023
EWS FLOOR PLANFile: EWS FLOOR PLAN.pdf5 Dec 2023
FIRST FLOOR PLANFile: FIRST FLOOR PLAN.pdf5 Dec 2023
GROUND FLOOR-TOWER A B C DFile: GROUND FLOOR-TOWER A B C D.pdf5 Dec 2023
REFUGE FLOOR PLAN @ 9TH FLOORFile: REFUGE FLOOR PLAN @ 9TH FLOOR.pdf5 Dec 2023
ROOF PLANFile: ROOF PLAN.pdf5 Dec 2023
SECOND FLOOR PLANFile: SECOND FLOOR PLAN.pdf5 Dec 2023

How this compares with Bengaluru Urban

69%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DNR PARKLINK PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmDNR PARKLINK PHASE 2Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: DNR CORPORATION PVT LTD

DNR CORPORATION PVT LTD has 3 registrations on RERA Karnataka, including DNR SPRINGLEAF and DNR PARKLINK PHASE 2. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DNR PARKLINK PHASE 2 is delayed beyond 31 May 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DNR PARKLINK PHASE 2?

The registered promoter entity is DNR CORPORATION PVT LTD, a company as per the filing. Its GSTIN 29AACCD8007D1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DNR PARKLINK PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DNR PARKLINK PHASE 2?

The professionals named in the filing: Architect: ANUP NAIK; Engineer: Mr. Ashok Kannan M/s optimal consulting services pvt ltd; Chartered Accountant: PRAKASH N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DNR PARKLINK PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DNR PARKLINK PHASE 2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DNR PARKLINK PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.