Home / Browse projects / Bengaluru Urban, Karnataka / DNR PARKLINK PHASE 1
DNR PARKLINK PHASE 1
By DNR CORPORATION PRIVATE LIMITED
RG-KA-30343 · RERA PRM/KA/RERA/1251/446/PR/040823/006113 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
DNR PARKLINK PHASE 1 is a Residential/Group Housing project by DNR CORPORATION PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/040823/006113 on 4 Aug 2023. Possession is promised by 31 Dec 2027. 315 of the 356 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameDNR PARKLINK PHASE 1
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560077
- Pincode560077
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/040823/006113
- ReraGenie IDRG-KA-30343
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 Aug 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed181 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 178 | 0 | 178 |
| B | - | - | - | 178 | 0 | 178 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 85%.
Building: 39% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 85% |
| Foundation footing work | 82% |
| Upto Plinth Level | 70% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 35% |
| Retaining wall (All types) | 70% |
| RCC or MS Framed structure | 60% |
| Masonry Construction | 50% |
| Plastering inside , outside & Ceiling | 30% |
| Joinery: Doors, Windows, Ventilators etc | 25% |
| Basic work of Water supply, Sanitary and Electrification | 30% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 40% |
| Railing and Grill fixing | 40% |
| Electrification, Water supply and Sanitary Finishing | 10% |
| Painting | 10% |
| Fire prevention and fire fighting fitting and fixture with network | 10% |
| Weather Proof work(tile,concrete) | 20% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 20% |
| Internal and External work including landscapes as per sanctioned drawings | 10% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 5% |
| Sewage and Drainage System | Yes | 5% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 10% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 5% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 2% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 10% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 25% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 5% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 10% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 10% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 10% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 50% |
| Lifts | Yes | 25% |
| Corridor/Lobbies | Yes | 30% |
| Fire escapes | Yes | 30% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 20% |
| Basement | Yes | 30% |
| Terrace | Yes | 30% |
| Outer Wall | Yes | 30% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s Krishnapriya Reality LLP | - | - |
| M/s Krishnapriya Reality LLP | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 197.00 cr | Rs 8.08 cr |
| Payment of taxes | Rs 36.60 cr | Rs 1.52 cr |
| Payment of fees | Rs 8.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 4.00 cr | Rs 11.17 lakh |
| Payment of cess | Rs 2.00 cr | - |
| On-site expenditure-Site Overhead | Rs 1.80 cr | Rs 24.75 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 60.00 lakh | Rs 5.87 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANUP NAIK |
| Engineer | Mr. Ashok Kannan M/s optimal consulting services pvt ltd |
| Chartered Accountant | PRAKASH N |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed181
As listed on the registration, under the names the promoter filed them with; the newest 80 of 181 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/040823/006113 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4, Q2 DNR Parkline Phase -1-Uploaded.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE-PHASE 1.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATEV- PHASE 1.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4, CA (QU)-parklink Phase 1_compressed.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE PARKLINK PHASE - I.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE PARKLINK - I FINAL.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4, CA (QU) - Parklink Phase 1_compressed.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q4 2025-26 Fire and Safety | 14 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 14 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4, CA -Parklink 1_compressed.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form -5 Architect Certificate - Parklink 1.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer Certificate - Parklink 1.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 14 Jan 2026 |
| Development Plan Order- bearing No.BDA-DLP-06/2776/2022-23- Dated -17-01-2023File: Development Plan Order- BDA-DLP-2776- DT-17-01-2023.pdf | 21 Jul 2023 |
| DP Plan Development bearing No.BDA-DLP-06/2776/2022-23- Dated -17-01-2023File: DP PLAN BDA-DLP-06-2776- DT-17-01-2023-DNR PARKLINK.jpg | 21 Jul 2023 |
| FORM-BFile: FORM-B-Affidavit cum Declaration.pdf | 21 Jul 2023 |
| FORM 1 CA CERTIFICATEFile: FORM-1-CA CERTIFICATE.pdf | 15 Jul 2023 |
| LETTER WITH RESPECT TO CLARIFICATION ON FORM 1 CA CERTIFICATEFile: Reg-FORM-1-CA CERTIFICATE-DESIGNATED BANK ACCOUNT-CLARIFICATION.pdf | 15 Jul 2023 |
| BALANCE SHEET 2021-22 WITH SCHEDULEFile: BALANCE SHEET -FY-2021-22 - WITH SCHEDULE.pdf | 15 Jul 2023 |
| BALANCE SHEET 2019-20 WITH SCHEDULEFile: BALANCE SHEET-2019-20 WITH SCHEDULE.pdf | 15 Jul 2023 |
| BALANCE SHEET 2022-23 WITH SCHEDULEFile: BALANCE SHEET-2020-21 WITH SCHEDULE.pdf | 15 Jul 2023 |
| PROFIT LOSS STATEMENT 2021-22 WITH SCHEDULEFile: PROFIT LOSS STATEMENT -FY-2021-22 -WITH SCHEDULE.pdf | 15 Jul 2023 |
| PROFIT LOSS STATEMENT 2019-20 WITH SCHEDULEFile: PROFIT LOSS STATEMENT-2019-20.pdf | 15 Jul 2023 |
| PROFIT LOSS STATEMENT 2022-23 WITH SCHEDULEFile: PROFIT LOSS STATEMENT-2020-21-WITH SCHEDULE.pdf | 15 Jul 2023 |
| KRISHNAPRIYA LLP BALANCE SHEET & PROFIT LOSS STATEMENT WITH SCHEDULEFile: KRISHNAPRIYA LLP- BALANCE SHEET AND PROFIT LOSS 2022-23.pdf | 15 Jul 2023 |
| KRISHNAPRIYA LLP BALANCE SHEET & PROFIT LOSS STATEMENT WITH SCHEDULEFile: KRISHNAPRIYA LLP-BALANCE SHEET & PROFIT LOSS STATEMENT 2021-22.pdf | 15 Jul 2023 |
| CDP MAP SHOWING THE PROPOSED SITEFile: CDP MAP showing the proposed site.jpg | 15 Jul 2023 |
| AREA STATEMENT upload the demarcated drawing certified by the EngineerFile: demarcated site plan with area details signed by Engineer.pdf | 15 Jul 2023 |
| BUILDING LICENSEFile: BUILDING LICENSE.jpeg | 15 Jul 2023 |
| BUILDING LICENSE FEE PAID RECEIPTFile: BUILDING LICENSE FEE PAID RECEIPT.jpeg | 15 Jul 2023 |
| ELEVATION PLANFile: EWS & CLUB HOUSE SECTION & ELEVATION.pdf | 15 Jul 2023 |
| SECTION PLAN 01File: SECTION 01 -TOWER A B C D.pdf | 15 Jul 2023 |
| ELEVATION TOWER A B CDFile: ELEVATION 01-TOWER -A B C D.pdf | 15 Jul 2023 |
| TYPICAL FLOOR PLAN 1 FOR 3RD TO 18TH FLOORFile: TYPICAL FLOOR PLAN 1.pdf | 15 Jul 2023 |
| TYPICAL FLOOR PLAN 2 FOR 4-8-12-16 FLOOR PLANFile: TYPICAL FLOOR PLAN-2.pdf | 15 Jul 2023 |
| TERRACE FLOOR PLANFile: TERRACE FLOOR PLAN.pdf | 15 Jul 2023 |
| SITE PLANFile: SITE PLAN.pdf | 15 Jul 2023 |
| SECOND FLOOR PLANFile: SECOND FLOOR PLAN.pdf | 15 Jul 2023 |
| ROOF PLANFile: ROOF PLAN.pdf | 15 Jul 2023 |
| REFUGE FLOOR PLAN @ 9TH FLOORFile: REFUGE FLOOR PLAN @ 9TH FLOOR.pdf | 15 Jul 2023 |
| GROUND FLOOR-TOWER A B C DFile: GROUND FLOOR-TOWER A B C D.pdf | 15 Jul 2023 |
| FIRST FLOOR PLANFile: FIRST FLOOR PLAN.pdf | 15 Jul 2023 |
| EWS FLOOR PLANFile: EWS FLOOR PLAN.pdf | 15 Jul 2023 |
| BASEMENT 01File: BASEMENT 01 PLAN.pdf | 15 Jul 2023 |
| BASEMENT 02File: BASEMENT 02 PLAN.pdf | 15 Jul 2023 |
| ABOVE TERRACE FLOOR PLANFile: ABOVE TERRACE FLOOR PLAN.pdf | 15 Jul 2023 |
| ABOVE REFUGE FLOOR PLAN @ 20TH FLOORFile: ABOVE REFUGE FLOOR PLAN @ 20TH FLOOR.pdf | 15 Jul 2023 |
| 21ST FLOOR PLANFile: 21ST FLOOR PLAN.pdf | 15 Jul 2023 |
| 22ND FLOOR PLANFile: 22ND FLOOR PLAN.pdf | 15 Jul 2023 |
| Affidavit Sec 3(1)File: AFFIDAVIT for SEC 3(1).pdf | 27 Jun 2023 |
| Airport Authority NOCFile: Airport Authority-NOC.pdf | 27 Jun 2023 |
| Allotment LetterFile: ALLOTMENT LETTER-DNR PARKLINK RERA FORMAT.pdf | 27 Jun 2023 |
| PROFORMA OF AGREEMENT OF SALEFile: AOS_DNR PARKLINK_RERA.pdf | 27 Jun 2023 |
| AUDITED PROFIT LOSS STATEMENT 20-21File: AUDITED PROFIT LOSS STATEMENT 2020-21.pdf | 27 Jun 2023 |
| AUDITED PROFIT LOSS STATEMENT 2019-20File: AUDITED PROFIT LOSS STATEMENT-2019-20.pdf | 27 Jun 2023 |
| AUDITED PROFIT LOSS STATEMENT 2021-22File: AUDITED PROFIT LOSS STATEMENT-2021-22.pdf | 27 Jun 2023 |
| BALANCE SHEET 2019-20File: BALANCE SHEET-2019-20.pdf | 27 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep DNR PARKLINK PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 38 registered projects within 2 km.
NAVA VRUKSHA
NAVA JYOTHI SHELTERS PRIVATE LIMITED
POULOMI FLORIQUE
POULOMI FLORIQUE LLP
Mirabelle
G Corp Homes Private Limited
DNR PARKLINK PHASE 2
DNR CORPORATION PVT LTD
NAVA SKANDA BELLAVITA
NAVA SKANDA PROJECTS
In That Quiet Earth Phase 2B
Total Environment Constructions Private Li
See every Bengaluru Urban project, with the district possession charts
Builder: DNR CORPORATION PRIVATE LIMITED
DNR Corporation Private Limited has 3 registrations on RERA Karnataka, including DNR SOLACE and DNR HIGHLINE. Its filings declare 4 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if DNR PARKLINK PHASE 1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of DNR PARKLINK PHASE 1?
The registered promoter entity is DNR CORPORATION PRIVATE LIMITED, a company as per the filing. Its GSTIN 29AACCD8007D1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in DNR PARKLINK PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at DNR PARKLINK PHASE 1?
The professionals named in the filing: Architect: ANUP NAIK; Engineer: Mr. Ashok Kannan M/s optimal consulting services pvt ltd; Chartered Accountant: PRAKASH N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DNR PARKLINK PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.