Home / Browse projects / Davangere, Karnataka / SIRIMANE ENCLAVE

Registration approved No litigation declared Residential/Group Housing project

SIRIMANE ENCLAVE

By SIRIMANE BUILDERS

RG-KA-85717 · RERA PRM/KA/RERA/1258/405/PR/100925/008081 · Last updated on RERA Karnataka portal: 4 Sep 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 85 documents Report an error

SIRIMANE ENCLAVE is a Residential/Group Housing project by SIRIMANE BUILDERS in Davangere, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1258/405/PR/100925/008081 on 10 Sep 2025. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameSIRIMANE ENCLAVE
  • TypeResidential/Group Housing
  • Location
    • Harihara
    • Davangere
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1258/405/PR/100925/008081
  • ReraGenie IDRG-KA-85717

Builder

  • NameSIRIMANE BUILDERS
  • Entity typePartnership Firm
  • GSTIN29AEXFS2655C1Z1
  • Authorized SignatorySRIKANTHA SHANKARAPPA

Key dates

this monthRegisteredSep 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Sep 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIRIMANE ENCLAVE---56056

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 4 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities42

As on 4 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
SEWAGE TREATMENT PLANT (STP)Yes-
ELECTRICITY SUPPLY TRANSFORMER AND SUBSTATIONYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
SRIKANTHA SHANKARAPPA, Authorized Signatory of SIRIMANE BUILDERS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 17.70 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 17.70 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVENKATESH R
EngineerRachan G YEDAMALE
Chartered AccountantSUPRIYA B

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed85

As listed on the registration, under the names the promoter filed them with; the newest 80 of 85 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1258/405/PR/100925/008081 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
ADLR SURVEY SKETCHFile: ADLR SURVEY SKETCH.pdf4 Sep 2025
AFFIDAVIT - FOR SUBMISSION of NOCs - SIRIMANEFile: AFFIDAVIT - FOR SUBMISSION of NOCs - SIRIMANE.pdf4 Sep 2025
Amenities & Facilities & Infrastructures signed by Engineer - SIRIMANEFile: Amenities & Facilities & Infrastructures signed by Engineer - SIRIMANE.pdf4 Sep 2025
APPROVED Plan copy - SirimaneFile: APPROVED Plan copy - Sirimane.pdf4 Sep 2025
APPROVED Plan Licence copy - SirimaneFile: APPROVED Plan Licence copy - Sirimane.pdf4 Sep 2025
BESCOM NOCFile: BESCOM NOC.pdf4 Sep 2025
Electricity Govt Fee paid receiptsFile: Electricity Govt Fee paid receipts.pdf4 Sep 2025
Electricity NOC ConnectionFile: Electricity NOC Connection.pdf4 Sep 2025
Estimation 17 Crores 70 Lakhs - SirimaneFile: Estimation 17 Crores 70 Lakhs - Sirimane.pdf4 Sep 2025
Google Maps Latitude LongitudeFile: Google Maps Latitude Longitude.pdf4 Sep 2025
KSPCB NOC CFEFile: KSPCB NOC CFE.pdf4 Sep 2025
MASTER CDP - PROPOSED LANDUSE - HARIHARAFile: MASTER CDP - PROPOSED LANDUSE - HARIHARA.pdf4 Sep 2025
No Collection or Sales DeclarationFile: No Collection or Sales Declaration.pdf4 Sep 2025
Pre-Stability Certificate - SIRIMANE_signed copyFile: Pre-Stability Certificate - SIRIMANE_signed copy.pdf4 Sep 2025
Sources of FundsFile: Sources of Funds.pdf4 Sep 2025
STP Drawings for Sirimane with SignatureFile: STP Drawings for Sirimane with Signature.pdf4 Sep 2025
Ver 01_AGREEMENT FOR SALE - SIRIMANEFile: Ver 01_AGREEMENT FOR SALE - SIRIMANE.pdf4 Sep 2025
Ver 01_ALLOTMENT LETTER - SIRIMANEFile: Ver 01_ALLOTMENT LETTER - SIRIMANE.pdf4 Sep 2025
VILLAGE MAPFile: VILLAGE MAP.pdf4 Sep 2025
Water NOC ConnectionFile: Water NOC Connection.pdf4 Sep 2025
WATER SUPPLY CONNECTION LETTERS FOR AUTHORITIES with Govt Fee paid receiptsFile: WATER SUPPLY CONNECTION LETTERS FOR AUTHORITIES with Govt Fee paid receipts.pdf4 Sep 2025
RTC, survey 44/3-
Mutation, survey 44/3-
Encumbrance Certificate, survey 44/3-
Conversion/Alienation Order, survey 44/3-
Sale/Title/Gift Deed, survey 44/3-
Khatha, survey 44/3-
Registration CertificateFile: REG CERT FIRM.pdf-
GST CertificateFile: GST REG CERT.pdf-
Partnership DeedFile: PARTNERSHIP DEED.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: F1 CA - REGISTRATION - SIRIMANE_signed copy.pdf-
Certificate issued by Architect Form 2File: F2 ARCH - REGISTRATION - SIRIMANE_signed copy.pdf-
Certificate issued by Engineer Form 3File: F3 ENGR - REGISTRATION - SIRIMANE_signed copy.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: AFFIDAVIT NON LITIGATION.pdf-
Balance Sheet 2023 - 2024File: Sirimane Builders BS PL 23-24.pdf-
Balance Sheet 2022 - 2023File: Srikanth BS PL 22-23.pdf-
Balance Sheet 2021 - 2022File: Srikanth BS PL 21-22.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Sirimane Builders BS PL 23-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Srikanth BS PL 22-23.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Srikanth BS PL 21-22.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: Sirimane Builder ITR 23-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Srikanth S ITR 22-23.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Srikanth S ITR 21-22.pdf-
Sirimane Plan Licence Copy-
Approved Plan Sirimane-
Approved Plan Sirimane-
Stability Certificate - REGISTRATION - SIRIMANE_signed copy-
PROJECT SPECIFICATIONS-
Sirimane Enclave - SALE AGREEMENT-
AFFIDAVIT FORM B-
AFFIDAVIT SECTION 3-
Legal Opinion-
BESCOM NOC-
DAVANAGERE-HARIHARA NOC-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
ADLR SURVEY SKETCH-
DAVANAGERE-HARIHARA NOC-
F6 ENGR - REGISTRATION - SIRIMANE_signed copy-
GIFT DEED SRIKANTH to REKHA-
Google Maps Latitude Longitude-
Guidance Value signed by Promoter - SIRIMANE-
MASTER CDP - PROPOSED LANDUSE - HARIHARA-
MORTGAGE LOAN RELEASE DEED-
NOC-
PARTITION DEED-

How this compares with Davangere

9%of Davangere projects moved their completion datethis one has not
0%of Davangere registrations are shown as withdrawn or revokedthis one is not

Computed across the 41 Davangere projects on ReraGenie, from their own filings.

Keep SIRIMANE ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Davangere41 in Davangere

Builder: SIRIMANE BUILDERS

SIRIMANE BUILDERS has 1 registration on RERA Karnataka, including SIRIMANE ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Davangere district page.

Frequently asked questions

What are my rights if SIRIMANE ENCLAVE is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SIRIMANE ENCLAVE?

The registered promoter entity is SIRIMANE BUILDERS, a partnership firm as per the filing. Its GSTIN 29AEXFS2655C1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SIRIMANE ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SIRIMANE ENCLAVE?

The professionals named in the filing: Architect: VENKATESH R; Engineer: Rachan G YEDAMALE; Chartered Accountant: SUPRIYA B. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIRIMANE ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIRIMANE ENCLAVE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIRIMANE ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.