ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / SHYAMAL LAKE VIEW

Valid until 30 Sep 2025 Mixed Development project

SHYAMAL LAKE VIEW

By SHREE GANESH INFRA INC

RG-GJ-59792 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA07147/150620 · Last updated on GujRERA portal: 27 Sep 2025

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Sep 2025Possession promisedno revision filed
9 of 9Construction stages doneevery applicable stage filed complete
18 of 115Units unsoldnot recorded sold or booked
Jump to the 41 documents Report an error

SHYAMAL LAKE VIEW is a Mixed Development project by SHREE GANESH INFRA INC in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA07147/150620 on 15 Jun 2020. Possession is promised by 30 Sep 2025. 97 of the 115 units on this registration are recorded sold or booked, and 9 of 9 construction stages are filed complete.

At a glance

Project

  • NameSHYAMAL LAKE VIEW
  • TypeMixed Development
  • Location
    • Gokul Nagar
    • Behind Priya Cinema
    • Gotri-Bhayli Road
    • Sevasi
    • Sevasi
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA07147/150620
  • ReraGenie IDRG-GJ-59792

Builder

  • NameSHREE GANESH INFRA INC
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJun 2020PromisedSep 2025

Key facts

Registration and timeline

  • StatusValid until 30 Sep 2025
  • Registered on15 Jun 2020
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed41 files

Current status

84%97 of 115 units booked
99.7%Of the estimated cost spent so far

Figures as on 27 Sep 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A+B+C---1087115

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 27 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 9 construction stages are filed complete.

A+B+C: 100% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 27 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,833 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 12.19 cr
Cost incurredRs 12.15 cr
Spent of the estimate99.7%
BuildingWingEstimatedIncurred
A+B+CNARs 12.19 crRs 12.15 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN RASIKBHAI PATEL
EngineerAASHUTOSH DESAI

Documents filed41

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA07147/150620 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)27 Sep 2025
Accountant's certificate (Form 3)27 Sep 2025
Site photograph, A+B+C23 Sep 2025
Engineer's certificate (Form 2)27 Sep 2024
Engineer's certificate annexure27 Sep 2024
RERA registration certificate15 Jun 2020
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

84%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SHYAMAL LAKE VIEW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Sevasi2,900+ in Vadodara

2 kmSHYAMAL LAKE VIEWOther 339Dot size: filed unitsN

Filed coordinates, straight-line distance. 339 registered projects within 2 km.

Builder: SHREE GANESH INFRA INC

SHREE GANESH INFRA INC has 1 registration on GujRERA, including SHYAMAL LAKE VIEW. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SHYAMAL LAKE VIEW is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHYAMAL LAKE VIEW?

The registered promoter entity is SHREE GANESH INFRA INC, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHYAMAL LAKE VIEW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHYAMAL LAKE VIEW?

The professionals named in the filing: Architect: KIRAN RASIKBHAI PATEL; Engineer: AASHUTOSH DESAI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHYAMAL LAKE VIEW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHYAMAL LAKE VIEW. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHYAMAL LAKE VIEW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.