SHRIRAM SONGS OF THE EARTH
RG-KA-60645 · RERA PRM/KA/RERA/1251/310/PR/120625/007819 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 3 complaints at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
SHRIRAM SONGS OF THE EARTH is a Residential/Group Housing project by Shriram Properties Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/120625/007819 on 12 Jun 2025. Possession is promised by 28 Apr 2030. 286 of the 344 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameSHRIRAM SONGS OF THE EARTH
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560099
- Pincode560099
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/120625/007819
- ReraGenie IDRG-KA-60645
Builder
- NameShriram Properties Limited
- Entity typeCompany
- CINU72200TN2000PLC044560
- GSTIN29AAFCS5801D1ZI
- Authorized SignatoryKRISHNA VEERARAGHAVAN
- Director & Chief Operating OfficerKRISHNA VEERARAGHAVAN
- DirectorsM Murali, Vaidyanathan Ramamurthy, Kulumani Gopalrathnam Krishnamurthy, Thai Salas Vijayan, Anita Kapoor, Ashish Pradeep Deora
- Project HeadSunil Kumar Rana
- Other registrations4 more →
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on12 Jun 2025
- Promised completion28 Apr 2030
- Revised completionNone
- Buildings6 building records
- Documents filed133 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-1 | - | - | - | 58 | 0 | 58 |
| TOWER 2 | - | - | - | 58 | 0 | 58 |
| Tower 3 | - | - | - | 56 | 0 | 56 |
| Tower 4 | - | - | - | 56 | 0 | 56 |
| Tower 5 | - | - | - | 58 | 0 | 58 |
| Tower 6 | - | - | - | 58 | 0 | 58 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 90%.
Building: 12% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 90% |
| Foundation footing work | 60% |
| Upto Plinth Level | 15% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 5% |
| Retaining wall (All types) | 36% |
| RCC or MS Framed structure | 1% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities38
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shriram Properties Limited | - | - |
| Shriram Properties Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 151.24 cr | Rs 7.56 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 23.00 cr | Rs 1.05 cr |
| On-site expenditure-Consultants Fees | Rs 1.45 cr | Rs 12.39 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ED+ ARCHITECTURE |
| Engineer | Innotech Engineering Consultant Pvt Ltd |
| Chartered Accountant | Vivek Gupta |
Complaints filed with RERA Karnataka3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01376/2025 | - | Shriram Properties Limited | 12/11/2025 |
| 00413/2026 | - | Shriram Properties Limited | 17/04/2026 |
| 00517/2026 | - | Shriram Properties Limited | 13/05/2026 |
Documents filed133
As listed on the registration, under the names the promoter filed them with; the newest 80 of 133 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/120625/007819 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Shriram Songs of the Earth Sep'26.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) _SOE_Q2 2026-27.PDF | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer Certificate (QU) Songs of the earth Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Shriram Songs of the Earth June'26.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) _SOE_Q1 2026-27.PDF | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer Certificate (QU) Songs of the earth.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 13 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Shriram Songs of the Earth March'26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate (QU) SOE.PDF | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer Certificate (QU) Songs of the earth.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q4 2025-26 Fire and Safety | 13 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 13 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Shriram Songs of the Earth Dec'25.pdf | 7 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) _Songs of the Earth_Q3 2025-26.PDF | 7 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer Certificate (QU) Q3 Songs of the earth.pdf | 7 Feb 2026 |
| previous project quarterly updates up to dateFile: Screenshot 2025-05-26 182726.png | 26 May 2025 |
| previous project quarterly updates up to dateFile: Screenshot 2025-05-26 182549.png | 26 May 2025 |
| previous project quarterly updates up to dateFile: Screenshot 2025-05-26 182414.png | 26 May 2025 |
| directors report for 2023-24File: Directors Report FY24.pdf | 26 May 2025 |
| directors report for 2023-24File: Directors Report FY24.pdf | 26 May 2025 |
| Loan amount deposited into RERA designated accountFile: Loan amount.pdf | 26 May 2025 |
| copy of current year RTCFile: 202 3.pdf | 26 May 2025 |
| copy of current year RTCFile: 202 2.pdf | 26 May 2025 |
| copy of current year RTCFile: 202 1.pdf | 26 May 2025 |
| copy of current year RTCFile: 199 2.pdf | 26 May 2025 |
| copy of current year RTCFile: 199 1.pdf | 26 May 2025 |
| free EC from 1/4/2011 to till dateFile: ilovepdf_merged.pdf | 26 May 2025 |
| title deedFile: TITTLE DATED.pdf | 26 May 2025 |
| notarized affidavitFile: Affidavit for Non-Litigation.pdf | 26 May 2025 |
| Layout/Development/single plan approved letterFile: Development Plan Pillai Land Project Clr scan1579.pdf | 26 May 2025 |
| Layout/Development/ single approval planFile: Site Plan Pillai Land Project Clr scan1580.pdf | 26 May 2025 |
| Building plan Blue print in readable format.File: Development Plan Pillai Land Project Clr scan1579.pdf | 26 May 2025 |
| Building licenseFile: Building LIcense.pdf | 26 May 2025 |
| Master Plan proposed area with consent authority seal and signature.File: MASTER PLAN.pdf | 26 May 2025 |
| Village Map.File: Village Map.pdf | 26 May 2025 |
| ZR copy with consent authority seal and signature.File: ANEKAL- ZONAL REGULATIONS.pdf | 26 May 2025 |
| JOINT ADLR Survey Sketch.File: ADLR SKETCH.pdf | 26 May 2025 |
| floor plan and section plan.File: TYPICAL FLOOR AND TERRACE FLOOR PLAN.pdf | 26 May 2025 |
| KSPCB NOCFile: NOC KSPCB.pdf | 26 May 2025 |
| SEIAA NOCFile: NOC SEIAA.pdf | 26 May 2025 |
| project Engineer details according to Engineer licenseFile: Engineer-4-Self attested copy of Engineer License.pdf | 26 May 2025 |
| Engineer certificate in the prescribed format certified by an registered Engineer instead of an ArcFile: Form - 3 Engineer Certificate - With Construction cost brief (003) NEW.pdf | 26 May 2025 |
| STP design drawing does not tally with the KPSCB NOC.File: STP REPORT 270 KLD.pdf | 26 May 2025 |
| STP design drawing as per the Guidelines of KSPCB NOC certified by the Engineer.File: STP 270 KLD LAYOUT.pdf | 26 May 2025 |
| NOC issued by BESCOMFile: NOC BESCOM dated 17 December 24 Pillai Land Project Anekal Pages 04 STech_931824122613080. | 26 May 2025 |
| HAL NOC.File: Shriram Pillai Land HAL Acknowledgement.pdf | 26 May 2025 |
| HAL NOC LETTERFile: Letter - HAL NOC acknowledgement submission.pdf | 26 May 2025 |
| Land cost calculation sheet as per the guidance valueFile: Land cost.pdf | 26 May 2025 |
| Payment plan in percentage and upload the proforma of the Agreement for Sale.File: 17-4-2025-RERA Format- Agreement for Sale-Songs of the Earth.pdf | 26 May 2025 |
| annexure-A and upload the proforma of the Allotment letter.File: Annexture-87 Allotment letter witn Annexure A.pdf | 26 May 2025 |
| brief estimated cost of construction certified by the Engineer.File: COST OF CONSTRUCTION.pdf | 26 May 2025 |
| CPD PLANFile: CDP - SONGS OF THE EARTH-.pdf | 26 May 2025 |
| Section and elevationFile: SECTION AND ELEVATION_.pdf | 26 May 2025 |
| RTC, survey 199/1 | - |
| Mutation, survey 199/1 | - |
| Encumbrance Certificate, survey 199/1 | - |
| Conversion/Alienation Order, survey 199/1 | - |
| Sale/Title/Gift Deed, survey 199/1 | - |
| Khatha, survey 199/1 | - |
| RTC, survey 202/1 | - |
| Mutation, survey 202/1 | - |
| Encumbrance Certificate, survey 202/1 | - |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SHRIRAM SERENITY | SY.NO 74/8, 74/10, 74/12, 74/13 & 74/15 ADDEVISWANATHAPURA VILLAGE, HESARAGHATTA HOBLI , YELAHANKA TALUK BANGALORE URBAN , Bengaluru North , Bengaluru Urban, Karnataka - 560064 | Ongoing | Jul 2029 | Not due yet |
| SHRIRAM SAPPHIRE | Sy.No-72, Bommasandra Village, Attibele-Hobli , Anekal Taluk, Bangalore-Urban , Bengaluru South , Bengaluru Urban, Karnataka - 560099 | Ongoing | Nov 2028 | Not due yet |
| SHRIRAM ESQUIRE | PID No-600005711 Site No-91 to 98 at HBCS LTD , Nirguna Mandir Layout , Bengaluru South , Bengaluru Urban, Karnataka - 560034 | Ongoing | Jan 2027 | Not due yet |
| SHRIRAM MYSTIQUE | 15/2 ROYAL STREET, MYDRAHALLI YESHWANTHAPURA HOBLI BBMP WARD NO 12 BANGALORE 560090 | Ongoing | Apr 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SHRIRAM SONGS OF THE EARTH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
Adarsh Welkin Park Phase 2
Akarshak Realty Private Limited
Adarsh Welkin Park Phase 1
Akarshak Realty Private Limited
Nambiar District 25 Phase 1
Nambiar EnsembleResidential Projects LLP
CASAGRAND VIVACITY
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Mahendra Solterra Aarya Phase-2
Mahendra Homes Private Limited
SIGNATURE SPLENDOR
SIGNATURE DWELLINGS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: Shriram Properties Limited
SHRIRAM PROPERTIES LIMITED has 5 registrations on RERA Karnataka, including SHRIRAM SERENITY and SHRIRAM ESQUIRE. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SHRIRAM SONGS OF THE EARTH is delayed beyond 28 Apr 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SHRIRAM SONGS OF THE EARTH?
The registered promoter entity is Shriram Properties Limited, a company as per the filing. Its CIN U72200TN2000PLC044560 and GSTIN 29AAFCS5801D1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SHRIRAM SONGS OF THE EARTH?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SHRIRAM SONGS OF THE EARTH?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at SHRIRAM SONGS OF THE EARTH?
The professionals named in the filing: Architect: ED+ ARCHITECTURE; Engineer: Innotech Engineering Consultant Pvt Ltd; Chartered Accountant: Vivek Gupta. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHRIRAM SONGS OF THE EARTH?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback