Home / Browse projects / Bengaluru Urban, Karnataka / SHRIRAM SAPPHIRE

Registration approved No litigation declared Residential/Group Housing project

SHRIRAM SAPPHIRE

By SHRIRAM PROPERTIES LIMITED

RG-KA-46950 · RERA PRM/KA/RERA/1251/310/PR/090224/006616 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 3 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Nov 2028Possession promisedno revision filed
3 of 18Construction stages donefurthest along: RCC or MS Framed structure, 80%
0 of 414Units unsoldnot recorded sold or booked
3Complaints at RERA Karnatakaon this registration
Jump to the 142 documents Report an error

SHRIRAM SAPPHIRE is a Residential/Group Housing project by SHRIRAM PROPERTIES LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/090224/006616 on 9 Feb 2024. Possession is promised by 5 Nov 2028. 414 of the 414 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSHRIRAM SAPPHIRE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560099
  • Pincode560099
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/090224/006616
  • ReraGenie IDRG-KA-46950

Builder

  • NameSHRIRAM PROPERTIES LIMITED
  • Entity typeCompany
  • CINU72200TN2000PLC044560
  • GSTIN29AAFCS5801D1ZI
  • Authorized SignatoryK R Ramesh
  • Director & Chief Operating Officer (Bangalore)Krishna veeraraghavan
  • DirectorsKulumani Gopalrathnam Krishnamurthy, M Murali, Thai Salas Vijayan, Srinivasan Natarajan, Vaidyanathan Ramamurthy, Mandot Ritesh Kantilal, Anita Kapoor
  • Project HeadKiran Kumar R
  • Other registrations4 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2024PromisedNov 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Feb 2024
  • Promised completion5 Nov 2028
  • Revised completionNone
  • Buildings6 building records
  • Documents filed142 files

Current status

100%414 of 414 units booked
11.7%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---84084
B---70070
C---62062
D---72072
E---56056
F---70070

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 80%.

Building: 38% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)70%
Retaining wall (All types)60%
RCC or MS Framed structure80%
Masonry Construction70%
Plastering inside , outside & Ceiling45%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification20%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing10%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)25%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings10%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes25%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes30%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes40%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,865 sq m
Named landowners1
LandownerVillageDistrict
K T SANATH--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 148.83 cr
Cost incurredRs 17.37 cr
Spent of the estimate11.67%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 125.57 crRs 17.37 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 23.00 cr-
On-site expenditure-Consultants FeesRs 25.72 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR. Sundaram
EngineerSUNDARAM RAJA GOPALA IYYAR
Chartered AccountantV G G A and Associates

Complaints filed with RERA Karnataka3

Case no.ComplainantRespondentFiled
00405/2024-SHRIRAM PROPERTIES LIMITED22/04/2024
00497/2025-SHRIRAM PROPERTIES LIMITED17/03/2025
01171/2025-SHRIRAM PROPERTIES LIMITED15/09/2025

Documents filed142

As listed on the registration, under the names the promoter filed them with; the newest 80 of 142 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/090224/006616 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Royal Court Sep'26 -Sapphire-VF.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: ARCHITECTS CERTIFICATE -SAPPHIRE.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer (QU) Sapphire Q2 2025-26.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q2 2026-27 Airport Authority of India14 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Royal Court June'26 -Sapphire-VF.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: ARCHITECTS CERTIFICATE - SHRIRAM SAPPHIRE.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer (QU) Sapphire Q1 2026-27.pdf13 Jul 2026
Q1 2026-27 Water supply and sewage board13 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)13 Jul 2026
Q1 2026-27 KPTCL- BESCOM13 Jul 2026
Q1 2026-27 Fire and Safety13 Jul 2026
Q1 2026-27 Airport Authority of India13 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department13 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Royal Court March'26 -Sapphire-VF.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect's certificate - Sapphire.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer (QU) Sapphire Q4 2025-26.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q4 2025-26 Fire and Safety14 Apr 2026
Q4 2025-26 Airport Authority of India14 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Royal Court Dec-25 -Sapphire-VF.pdf6 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: ARCHITECTS CERTIFICATE - SAPPHIRE.pdf6 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer (QU) Sapphire Q3 2024-25.pdf6 Feb 2026
Q3 2025-26 Water supply and sewage board6 Feb 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)6 Feb 2026
Q3 2025-26 KPTCL- BESCOM6 Feb 2026
Q3 2025-26 Fire and Safety6 Feb 2026
Q3 2025-26 Airport Authority of India6 Feb 2026
Q3 2025-26 BSNL/Telecommunication Department6 Feb 2026
RTC for full extent of the projectFile: RTC for Full Extent.pdf6 Feb 2024
EC for the period 1-4-2004 to till dateFile: EC-2004 to 2024.pdf6 Feb 2024
Affidavit for Submision Building LicenseFile: Affidavit for submision of Building License.pdf6 Feb 2024
Clarification on Conversion Order for Land UseFile: Clarification on Conversion Order for Land Use.pdf6 Feb 2024
all sanctioned drawings Floor plans- sectional drawings and elevationsFile: Sanction Floor Plans-Sections and Elevations.pdf6 Feb 2024
self attested copy of the Engineer license certificateFile: Self Attested Engineer License.pdf6 Feb 2024
Updated proforma of Agreement for SaleFile: Proforma Agreement For Sale.pdf6 Feb 2024
Water Suuply NOCFile: Water Supply NOC.pdf6 Feb 2024
Mentioned all directors detailsFile: Finance Section-1-All Directors Detail.pdf24 Jan 2024
Clarification on Submision of QU and Annaul Audit Report for Projects Under SPLFile: Finance Section-2-Clarification on Submision of QU and Annaul Audit Report for Projects Un24 Jan 2024
Clarification on Sources of Funds to complete the projectFile: Finance Section-3-Clarification on Sources of Funds to complete the project.pdf24 Jan 2024
Bank affidavit in prescribed formatFile: Finance Section-4- Bank Affidavit in prescribed format.pdf24 Jan 2024
Form-01 CA certificate in prescribed FormatFile: Finance Section-5-Form-01 CA certificate in prescribed Format.pdf24 Jan 2024
RTC for Full ExtentFile: Revenue-1-RTC for Full Extent.pdf24 Jan 2024
MR extracts obtained from revenue departmentFile: Revenue-2-MR Exctracts.pdf24 Jan 2024
EC from 1989 to till dateFile: Revenue-3-EC from 1989 to till date.pdf24 Jan 2024
Clarification on Conversion OrderFile: Revenue-4-Clarification on Conversion Order.pdf24 Jan 2024
Affidavit for Non LitigationFile: Revenue-5-Affidavit for Non Litigation.pdf24 Jan 2024
Letter To RERA WRT Submission of KSPCB CFE-R1File: Engineer-1-Letter To RERA WRT Submission of KSPCB CFE-R1.pdf24 Jan 2024
Letter to RERA for submission of Building LicenseFile: Engineer-2-Letter to RERA for submission of Building License.pdf24 Jan 2024
CDP Map showing proposed siteFile: Engineer-3-CDP Map Showing the Proposed Site.pdf24 Jan 2024
Architect Certificate with COA numberFile: TCP-5-Architect Certificate with COA number.pdf24 Jan 2024
Developement Plan Order-Shriram SapphireFile: Engineer-6-Developement Plan Order-Shriram Sapphire.pdf24 Jan 2024
Common Area Allotted to Association is updated in project detail pageFile: Engineer-2-Common Area Allotted to Association is updated in project detail page.pdf24 Jan 2024
Self attested copy of Engineer LicenseFile: TCP-4-Self attested copy of Engineer License.pdf24 Jan 2024
Signed Specifications-having amenities and common area detailsFile: TCP-9-Signed Specifications.pdf24 Jan 2024
Form -3-Engineer Certificate Shriram SapphireFile: TCP-7-8-Form -3-Engineer Certificate Shriram Sapphire.pdf24 Jan 2024
Brief Construction Cost certified by the Certified Civil EngineerFile: Engineer-8 Brief Construction Cost certified by the Certified Civil Engineer.pdf24 Jan 2024
Project Signed Specifications with name and address of the projectFile: TCP-9-Signed Specifications.pdf24 Jan 2024
Section 3-1 Notarized Affidavit- with project name and addressFile: TCP-10-Section 3-1 Notarized Affidavit.pdf24 Jan 2024
Proforma Agreement for SaleFile: TCP-12-Proforma Agreement for Sale.pdf24 Jan 2024
Self attested Water Supply NOCFile: TCP-13 Self attested Water Supply NOC.pdf24 Jan 2024
Self Attested BESCOM NOCFile: TCP-13-Self Attested BESCOM NOC.pdf24 Jan 2024
Design Drawing certified by civil engineerFile: TCP-14-STP- Design Drawing certified by civil engineer.pdf24 Jan 2024
STP-Location in Site PlanFile: TCP-14-STP-Location in Site Plan- Design Drawing.pdf24 Jan 2024
Land cost calculation as per the guidance value-Self attestedFile: TCP-15-Land cost calculation as per the guidance value-Self attested.pdf24 Jan 2024
Source of water supplyFile: Engineer-16-Source of water supply.pdf24 Jan 2024
JDA and Letter Agreement as a supproting document for Land cost and approval cost incurredFile: JDA and Letter Agreement as a supproting document for Land cost and approval cost incurred24 Jan 2024
Village Map showing proposed siteFile: Engineer-4-Village Map Showing the Proposed Site.pdf24 Jan 2024
All Sanction Floor PlansFile: Engineer-7-All Sanction Plans Floor Plans.pdf24 Jan 2024
Proforma Allotment LetterFile: Engineer-11-Proforma Allotment Letter.pdf24 Jan 2024
Brief estimated cost of construction certified by registered civil engineerFile: Engineer-8 Form - 3- Engineer Certificate - With Brief Construction cost.pdf24 Jan 2024
RTC, survey 72-
Mutation, survey 72-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationStatusPromisedDelivered
SHRIRAM ESQUIREPID NO-600005711 SITE NO-91 TO 98 AT HBCS LTD NIRGUNA MANDIR LAYOUT, BENGALURU SOUTH, BENGALURU URBAN, KARNATAKA - 560034OngoingJan 2027Not due yet

How this compares with Bengaluru Urban

100%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHRIRAM SAPPHIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSHRIRAM SAPPHIREOther 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: SHRIRAM PROPERTIES LIMITED

SHRIRAM PROPERTIES LIMITED has 5 registrations on RERA Karnataka, including SHRIRAM SERENITY and SHRIRAM ESQUIRE. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHRIRAM SAPPHIRE is delayed beyond 5 Nov 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHRIRAM SAPPHIRE?

The registered promoter entity is SHRIRAM PROPERTIES LIMITED, a company as per the filing. Its CIN U72200TN2000PLC044560 and GSTIN 29AAFCS5801D1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHRIRAM SAPPHIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHRIRAM SAPPHIRE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SHRIRAM SAPPHIRE?

The professionals named in the filing: Architect: R. Sundaram; Engineer: SUNDARAM RAJA GOPALA IYYAR; Chartered Accountant: V G G A and Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRIRAM SAPPHIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRIRAM SAPPHIRE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRIRAM SAPPHIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.